13431 | 12/4/2023 | 2023_12_04_Shasta County DA Stephanie A. Bridgett OpeningComments OEIS PG&E WMP Draft Decision A letter from the Shasta County District Attorney, Stephanie A. Bridgett, expressing personal and community concerns regarding the Draft Decision for PG&E's 2023-2025 WMP. Electrical Infrastructure 2 page(s) | Shannon O'Rourke, Deputy Director | Shasta County District Attorney |
13430 | 12/4/2023 | 2023_12_04_Public Advocates Office OpeningComments OEIS PG&E WMP Draft Decision
| | California Public Utilities Commission |
13429 | 12/4/2023 | 2023_12_04_The Utility Reform Network OpeningComments OEIS PG&E WMP Draft Decision
| | The Utility Reform Network |
13428 | 12/4/2023 | 2023_12_04_PG&E OpeningComments OEIS PG&E WMP Draft Decision
| | PG&E |
13427 | 12/4/2023 | 2023_12_04_Mussey Grade Road Alliance OpeningComments OEIS PG&E WMP Draft Decision
| | Mussey Grade Road Alliance |
13425 | 12/4/2023 | 2025 WMP Update Guidelines Workshop Recording and Slides Recording link and slide deck from November 15, 2023, workshop on Draft 2025 WMP Update Guidelines | | Office of Energy Infrastructure Safety |
13386 | 11/16/2023 | BVES 2023-2025 R2 WMP In accordance with the Office of Energy Infrastructure Safety’s 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines, specifically Section 4.3, Bear Valley Electric Service, Inc. hereby submits an updated version of its 2023-2025 Wildfire Mitigation Plan following Energy Safety's approval of Bear Valley's WMP on 11/6/23. | | Bear Valley Electric Service, Inc. |
13385 | 11/16/2023 | BVES 2023-2025 R2 WMP Non-Substantive Cover Letter In accordance with the Office of Energy Infrastructure Safety’s 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines, specifically Section 4.3, Bear Valley Electric Service, Inc. hereby submits an updated version of its 2023-2025 Wildfire Mitigation Plan following Energy Safety's approval of Bear Valley's WMP on 11/6/23. | | Bear Valley Electric Service, Inc. |
13374 | 11/13/2023 | PG&E's 2023 WMP Draft Decision with cover letter Energy Safety's Draft Decision on PG&E's 2023-2025 Base WMP Electrical Infrastructure 195 page(s) | | Office of Energy Infrastructure Safety |
13372 | 11/9/2023 | PGE_WMP DR-Summary_20231109.pdf
| | PG&E |
13355 | 11/2/2023 | Liberty Application_Confidential Treatment of 2023-2025 WMP
| | Liberty Utilities |
13352 | 11/6/2023 | Bear Valley 2023-2025 Wildfire Mitigation Plan Decision and Cover Letter Office of Energy Infrastructure Safety's Decision and Cover Letter approving BVES's 2023-2025 WMP Electrical Infrastructure | | Office of Energy Infrastructure Safety |
13319 | 11/2/2023 | 2023_11_2_Liberty_Reply Comments_2023-2025 WMP_R2
| | Liberty Utilities |
13298 | 11/1/2023 | 2024 WMP Target Updates (Nov 1, 2023) Pursuant to the 2023-2025 WMP Process and Evaluation Guidelines, SCE respectfully submits updates to its 2024 WMP program targets. SCE does not have any changes to 2023 targets or to performance metric forecasts. | | Southern California Edison |
13295 | 11/1/2023 | 2023-11-01_SDGE_2023_Change Order Report_R0_Attachment A
| | San Diego Gas & Electric |
13294 | 11/1/2023 | 2023-11-01_SDGE_2023_Change Order Report_R0 Energy Safety issued a final decision approving SDG&E’s 2023-2025 Base WMP on October 13, 2023. SDG&E provides the following updates that meet the change order requirements. | | San Diego Gas & Electric |
13290 | 10/30/2023 | Draft 2025 WMP Update Guidelines Draft 2025 Wildfire Mitigation Plan Update Guidelines. A virtual public workshop will be held on November 15, 2023. Comments on the draft will be accepted through December 6, 2023. | | Office of Energy Infrastructure Safety |
13280 | 10/27/2023 | Public Advocates Office Comments on PacifiCorp Revision Notice Response
| | Public Utilities Commission |
13279 | 10/27/2023 | GPI Comments on PacifiCorp Revision Notice Response
| | Green Power Institute |
13273 | 10/26/2023 | 2023-10-26_SCE_2023_WMP_R1 Pursuant to Section 4.3 of the 2023-2025 WMP Process and Evaluation Guidelines, SCE is submitting an updated version of its 2023-2025 Wildfire Mitigation Plan. This version reflects errata and corrections. | | Southern California Edison |
13267 | 10/23/2023 | SDGE_Application_for_Confidential_Treatment_of_WMP_Errata
| | San Diego Gas & Electric |
13266 | 10/25/2023 | 2023-2025 SDGE WMP with Attachments_Errata_10-23-23
| | San Diego Gas & Electric |
13265 | 10/23/2023 | SDGE_2023-2025_WMP_Cover Letter and Non-Substantive_Errata_10-23-23 In accordance with Energy Safety Process Guidelines, SDG&E hereby submits a final version of its 2023-2025 WMP that includes all previously submitted errata. | | San Diego Gas & Electric |
13264 | 10/24/2023 | SCE 2023-2025 WMP Decision and Cover Letter Office of Energy Infrastructure Safety’s Decision approving Southern California Edison Company’s 2023-2025 Wildfire Mitigation Plan. | | Office of Energy Safety Infrastructure |
13263 | 10/23/2023 | Public Advocates Office Comments to Liberty Revision Notice Response The Public Advocates Office submits comments on the revised 2023-2025 Wildfire Mitigation Plan of Liberty Utilities. | | Public Utilities Commission |
13262 | 10/23/2023 | GPI Comments on Liberty Revision Notice Response Comments of the Green Power Institute on the Liberty 2023 Wildfire Mitigation Plan Final Revision Notice Responses. | | Green Power Institute |
13259 | 10/23/2023 | BVES Reply Comments 2023-2025 WMP Draft Decision
1 page(s) | | Bear Valley Electric Service, Inc. |
13251 | 10/20/2023 | PG&E's 2023 WMP Supplemental Revision Notice Response to Comments
| | PG&E |
13242 | 10/18/2023 | 2023-10-18_LSPGC_2023_RNR-R1 LSPGC WMP Revision 1 | | LS Power |
13241 | 10/17/2023 | LSPGC WMP Errata LSPGCA submits updates to section 9.1.2 and 9.2 of our WMP per the substantive errata request received on October 4, 2023. | | LS Power |
13194 | 10/13/2023 | Public Advocates Office Opening Comments on PG&E 2023 WMP SRNR
| | California Public Utilities Commission |
13193 | 10/13/2023 | MGRA Modification of PGE_2305_SRNR_R0_Atch02
| | Mussey Grade Road Alliance |
13192 | 10/13/2023 | Mussey Grade Road Alliance Comments on 2023-2025 Wildfire Mitigation Plan R3 of PG&E and Associated Files
| | Mussey Grade Road Alliance |
13191 | 10/13/2023 | Comments Of The Utility Reform Network On PG&E’s 2023-2025 WMP Supplemental Response To Revision Notice
| | The Utility Reform Network |
13190 | 10/13/2023 | GPI Comments on PG&E Supplemental Revision Notice Response
| | Green Power Institute |
13189 | 10/13/2023 | SDG&E 2023-2025 WMP Decision and Cover Letter This is Energy Safety’s Decision approving the 2023-2025 Wildfire Mitigation Plan (WMP) of San Diego Gas & Electric Company (SDG&E). Electrical Infrastructure | | OEIS |
13188 | 10/13/2023 | Joint Comments on PG&E WMP R3
Electrical Infrastructure 4 page(s) | Caroline Thomas Jacobs, Director | William Abrams, et. al. |
13181 | 10/12/2023 | PacifiCorp’s Revised 2023- 2025 Base WMP – Redline
| | PacifiCorp |
13180 | 10/12/2023 | PacifiCorp’s Revised 2023-2025 Base WMP – Clean
| | PacifiCorp |
13179 | 10/12/2023 | Revised 2023 WMP Submission Cover Letter
| | PacifiCorp |
13178 | 10/12/2023 | Revision Notice Response
| | PacifiCorp |
13175 | 10/10/2023 | GPI Comments on Draft Decision of BVES WMP
| | Green Power Institute |
13174 | 10/6/2023 | Liberty Application for Confidential Treatment of 2023-2025 WMP
| | Liberty Utilities |
13173-1 | 10/6/2023 | 2023-10-06_Liberty_Cover Letter_2023_WMP_R2
| | Liberty Utilities |
13173-2 | 10/6/2023 | 2023-10-06_Liberty_2023_WMP_R2
| | Liberty Utilities |
13173-3 | 10/6/2023 | 2023-10-06_Liberty_2023_WMP_R2_Redlined
| | Liberty Utilities |
13172 | 10/6/2023 | PG&E Supplemental Response to Revision Notice Comment Period Extension Energy Safety extending the opening and reply comment period for PG&E's supplemental response to revision notice. Electrical Infrastructure 1 page(s) | | Office of Energy Infrastructure Safety |
13169 | 10/6/2023 | 2023 - 2025 BVES WMP Non-Substantive Errata Request Office of Energy Infrastructure Safety Non-Substantive Errata Request for Bear Valley Electric Service Company, Inc.’s 2023-2025 Wildfire Mitigation Plan | | Office of Energy Infrastructure Safety |
13161 | 10/5/2023 | Request for Extension to Respond to PG&E 2023-2025 WMP Supplemental Response to the Revision Notice
| | The Utility Reform Network |
13160 | 10/4/2023 | 2023 WMP LS Power Substantive Errata Request Energy Safety requests that LS Power address substantive errata Electrical Infrastructure 1 page(s) | LS Power | Office of Energy Infrastructure Safety |
13158 | 9/29/2023 | 2023-09-29 SCE Reply Comments 2023 2025WMP Draft Decision
| | Southern California Edison |
13157 | 9/29/2023 | SDGE_Reply Comments_on_Draft_Decision_on_SDGE_2023-2025_WMP
| | San Diego Gas & Electric |
13154 | 9/29/2023 | Reply Comments Of The Utility Reform Network On The Draft Decision On Southern California Edison Company’s 2023-2025 WMP
| | The Utility Reform Network |
13153 | 9/29/2023 | Reply Comments Of The Utility Reform Network On The Draft Decision On San Diego Gas And Electric Company’s 2023-2025 WMP
| | The Utility Reform Network |
13124 | 9/29/2023 | MGRA Reply Comments on SCE and SDG&E Draft Decisions
| | Mussey Grade Road Alliance |
13067 | 9/28/2023 | Energy Safety Non-Substantive Errata Request for SCE 2023-2025 WMP
Electrical Infrastructure | | Office of Energy Infrastructure Safety |
13054 | 9/27/2023 | PG&E’s 2023-2025 Wildfire Mitigation Plan R3 - Redline
| | PG&E |
13053 | 9/27/2023 | PG&E’s 2023-2025 Wildfire Mitigation Plan R3
| | PG&E |
13052 | 9/27/2023 | 2023-09-27_PGE_23-05_SRNR_R0_Atch03_Redacted.xlsx
| | PG&E |
13051 | 9/27/2023 | 2023-09-27_PGE_23-05_SRNR_R0_Atch02.xlsx
| | PG&E |
13050 | 9/27/2023 | 2023-09-27_PGE_23-05_SRNR_R0_Atch01_Redacted.xlsx
| | PG&E |
13049 | 9/27/2023 | 2023-09-27_PGE_23_SRNR_R1_Tables 1-47
| | PG&E |
13048 | 9/27/2023 | PG&E’s 2023-2025 Wildfire Mitigation Plan Supplemental Response to Revision Notice - Redline
| | PG&E |
13047 | 9/27/2023 | PG&E’s 2023-2025 Wildfire Mitigation Plan Supplemental Response to Revision Notice
| | PG&E |
13046 | 9/27/2023 | Confidentiality Declaration for PG&E's WMP R3 and SRNR Attachments Confidentiality Declaration for 2023-09-27_PGE_23-05_SRNR_R0_Atch01_CONF.xlsx and 2023-09-27_PGE_23-05_SRNR_R0_Atch03_CONF.xlsx. | | PG&E |
13045 | 9/27/2023 | Confidentiality Declaration for PG&E's Wildfire Mitigation Plan Revision 3 Confidentiality Declaration for 2023-09-27_PGE_23_WMP_R3_CONF.pdf and 2023-09-27_PGE_23_WMP_R3_Redline_CONF.pdf. | | PG&E |
13037 | 9/21/2023 | 2023 WMP Bear Valley Electric Service Draft Decision with cover letter
Electrical Infrastructure | | Office of Energy Infrastructure Safety |
13025 | 9/19/2023 | Public Advocates Office Comments on Draft Decision SCE 2023-2025 WMP
| | California Public Utilities Commission |
13024 | 9/19/2023 | Public Advocates Office Comments on Draft Decision SDGE 2023-2025 WMP
| | California Public Utilities Commission |
13023 | 9/19/2023 | GPI Comments on Decision on SCE and SDG&E 2023-2025 WMPs
| | Green Power Institute |
13022 | 9/19/2023 | SCE_Comments_on_OEIS_Draft_Decision_on_SCE_2023_2025WMP
| | Southern California Edison |
13021 | 9/19/2023 | SDGE_Comments_on_OEIS_Draft_Decision_on_SDGE_2023-2025_WMP
| | San Diego Gas & Electric |
13020 | 9/19/2023 | Opening Comments Of The Utility Reform Network On The Draft Decision On SCE’s 2023-2025 WMP
| | The Utility Reform Network |
13019 | 9/19/2023 | Opening Comments Of The Utility Reform Network On The Draft Decision On SDG&E’s 2023-2025 WMP
| | The Utility Reform Network |
13018 | 9/19/2023 | MGRA APPENDIX A - WMP 2023-2025 - TAIL RISK WHITEPAPER
| | Mussey Grade Road Alliance |
13017 | 9/19/2023 | MUSSEY GRADE ROAD ALLIANCE COMMENTS ON OEIS DRAFT DECISIONS ON SCE AND SDG&E 2023-2025 WMPS
| | Mussey Grade Road Alliance |
13008 | 9/13/2023 | Corrected Energy Safety Response to PG&E’s Request for Supplemental Response to Revision Notice Correction to decision dates published in September 12, 2023, Energy Safety Response letter. Corrections are shown in redline. | | Office of Energy Infrastructure Safety |
13007 | 9/12/2023 | Energy Safety Response to PG&E’s Request for Supplemental Response to Revision Notice Response to PG&E’s September 11, 2023, request to submit a supplemental response to Energy Safety’s Revision Notice. The request is approved. PG&E’s supplemental response is due September 27, 2023. Stakeholders may submit comments on PG&E’s supplemental response. | | Office of Energy Infrastructure Safety |
12999 | 9/11/2023 | Pacific Gas and Electric Company’s Request to Supplement its 2023-2025 Wildfire Mitigation Plan Submission
| | PG&E |
12998 | 9/11/2023 | 2023 PacifiCorp Erratum Letter indicating an erratum that PacifiCorp must correct in its 2023-2025 WMP. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12997 | 9/11/2023 | 2023 PacifiCorp Revision Notice Revision Notice for PacifiCorp’s 2023-2025 Wildfire Mitigation Plan. Response is due October 11, 2023. Opening comments on PacifiCorp’s Revision Notice Response due October 26, 2023, and reply comments due November 6, 2023. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12981 | 9/6/2023 | 2023 Liberty Revision Notice Revision Notice for Liberty Utilities' 2023-2025 Wildfire Mitigation Plan. Response is due October 6, 2023. | | Office of Energy Infrastructure Safety |
12976 | 9/1/2023 | 2023-09-01_PGE_2023_RNRReplyComments_R0
| | PG&E |
12965 | 8/30/2023 | 2023 SCE Draft Decision with cover letter This is Energy Safety's Draft Decision on SCE's 2023-2025 WMP, submitted for public comment with opening comments due September 19, 2023, and reply comments due September 29, 2023. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12964 | 8/30/2023 | 2023 SDG&E Draft Decision with cover letter This is Energy Safety's Draft Decision on SDG&E's 2023-2025 WMP, submitted for public comment with opening comments due September 19, 2023, and reply comments due September 29, 2023. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12942 | 8/22/2023 | 2023-08-22_BVES_WMP_Substantive Erratum.pdf
| | Bear Valley Electric Service, Inc. |
12941 | 8/22/2023 | Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan 2023 Revision 1 Redlined
| | Bear Valley Electric Service, Inc. |
12940 | 8/22/2023 | Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan 2023 Revision 1
| | Bear Valley Electric Service, Inc. |
12939 | 8/22/2023 | BVES Response to the Office of Energy Infrastructure Safety Issuance of Revision Notice for Bear Valley Electric Service Company
| | Bear Valley Electric Service, Inc. |
12938 | 8/20/2023 | 2023_08_20_So_OpeningComments_PGE_2023_RNR_R0 Attachment
| | Brenda So |
12937 | 8/20/2023 | 2023_08_20_So_OpeningComments_PGE_2023_RNR_R0
| | Brenda So |
12936 | 8/19/2023 | 2023_08_19_Curran Mechem Family_OpeningComments_PGE_2023_RNR_R0
| | Curran Mechem Family |
12935 | 8/20/2023 | 2023_08_20_Klinedinst_OpeningComments_PGE_2023_RNR_R0 Letter Responding to PG&E Final Revision Electrical Infrastructure 2 page(s) | Melissa Semcer Deputy Director | Charles Klinedinst |
12934 | 8/21/2023 | 2023_08_21_Tonus_OpeningComments_PGE_2023_RNR_R0
| | Susan Tonus |
12933 | 8/21/2023 | 2023_08_21_Harman_OpeningComments_PGE_2023_RNR_R0 Document refutes PG&E's latest plan and calls for action from OEIS Electrical Infrastructure 2 page(s) | OEIS | Douglas Harman |
12932 | 8/22/2023 | 2023_08_22_Abrams_OpeningComments_PGE_2023_RNR_R0
Electrical Infrastructure 6 page(s) | | William Abrams |
12931 | 8/22/2023 | 2023_08_22_Anonymous_OpeningComments_PGE_2023_RNR_R0
| | Residence in Montclair |
12930 | 8/22/2023 | 2023_08_22_Collins_OpeningComments_PGE_2023_RNR_R0 Public Comment Electrical Infrastructure 3 page(s) | Office of Energy Infrastructure Safety | Kevin Collins |
12929 | 8/22/2023 | 2023_08_22_Holmes_OpeningComments_PGE_2023_RNR_R0 A comment on your proceeding | | Joseph Holmes |
12927 | 8/22/2023 | 2023_08_22_GPI_OpeningComments_PGE_2023_RNR_R0
| | Green Power Institute |
12926 | 8/22/2023 | 2023_08_22_TURN_OpeningComments_PGE_2023_RNR_R0
| | The Utility Reform Network |
12925 | 8/22/2023 | 2023_08_22_Joint CCA_OpeningComments_PGE_2023_RNR_R0 OPENING COMMENTS OF MARIN CLEAN ENERGY, SONOMA CLEAN POWER AUTHORITY, PIONEER COMMINITY ENERGY, AND EAST BAY COMMUNITY ENERGY ON PG&E’S 2023 WILDFIRE MITIGATION PLAN REVISION NOTICE RESPONSE Electrical Infrastructure | | Law Office of David Peffer |
12924 | 8/22/2023 | 2023_08_22_CalAdvocates_OpeningComments_PGE_2023_RNR_R0
| | CPUC |
12922 | 8/22/2023 | 2023_08_22_MGRA_OpeningComments_PGE_2023_RNR_R0
| | Mussey Grade Road Alliance |
12921 | 8/22/2023 | 2023_08_22_RCRC_OpeningComments_PGE_2023_RNR_R0 Comments on PG&E’s Revised 2023-2025 Wildfire Mitigation Plan submitted on August 7, 2023. 5 page(s) | Caroline Thomas Jacobs | Rural County Representatives of California |
12918 | 8/18/2023 | 2023_08_18_CalAdvocates Comments_2025WMPGuidelines
| | California Public Utilities Commission |
12916 | 8/18/2023 | 2023_08_18_Joint IOU Comments_2025WMPGuidelines
| | Southern California Edison |
12915 | 8/18/2023 | 2023_08_18_GPI_Comments_2025WMPGuidelines
| | Green Power Institute |
12912 | 8/17/2023 | 2023_08_17_Falk_OpeningComments_PGE_2023_RNR_R0
| | Allison and Ryan Falk |
12906 | 8/17/2023 | 2023_08_17_Cohen_OpeningComments_PGE_2023_RNR_R0 Request for undergrounding Oakland Hills Electrical Infrastructure 1 page(s) | Office of Energy Infrastructure Safety | Andrew Cohen |
12905 | 8/16/2023 | 2023_08_16_Bereny_OpeningComments_PGE_2023_RNR_R0
| | Amanda Bereny |
12902 | 8/14/2023 | 2023-08-14_SCE_2023_WMP_Errata
| | Southern California Edison |
12892 | 8/11/2023 | Revised 2023 PG&E Wildfire Mitigation Plan (WMP) Draft Decision Schedule
1 page(s) | | Office of Energy Infrastructure Safety |
12878 | 8/8/2023 | 2023 BVES Revision Notice Revision Notice for Bear
Valley Electric Service Company’s 2023-2025 Wildfire Mitigation Plan. Response Due August 23, 2023 Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12877 | 8/8/2023 | BVES Erratum Letter August 2023 Letter indicating an erratum that BVES must correct in its 2023-2025 WMP Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12867 | 8/7/2023 | 2023-08-07_PGE_23-07_RNR_R0_Atch01
| | PG&E |
12866 | 8/7/2023 | 2023-08-07_PGE_23-05_RNR_R0_Atch01
| | PG&E |
12865 | 8/7/2023 | 2023-08-07_PGE_23-04_RNR_R0_Atch01
| | PG&E |
12864 | 8/7/2023 | 2023-08-07_PGE_2023_RNR_R0
| | PG&E |
12863 | 8/7/2023 | 2023-08-07_PGE_2023_WMP_R2_Redlined
| | PG&E |
12862 | 8/7/2023 | 2023-08-07_PGE_2023_WMP_R2
| | PG&E |
12861 | 8/7/2023 | DRU11407.002_OEIS Confidentiality Declaration R2
| | PG&E |
12829 | 7/31/2023 | Climate Change Scoping Meeting Comment Solicitation, Meeting and Recording Meeting slides and recording from July 25, 2023, Climate Change Scoping Meeting. Written comments are due on September 5, 2023. | | Office of Energy Infrastructure Safety |
12787 | 7/20/2023 | 2025 WMP Update Guidelines Workshop Slides and Recording Recording link and slides from July 19, 2023, workshop on the development of the 2025 Wildfire Mitigation Plan Update Guidelines. | | Office of Energy Infrastructure Safety |
12786 | 7/20/2023 | Notice of Scoping Meeting: Climate Change and Fire Risk-Consequence Modeling Updated Event Flyer and Agenda for the Climate Change Scoping Meeting Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12747 | 7/13/2023 | Notice of Scoping Meeting: Climate Change and Fire Risk-Consequence Modeling Scoping meeting on Climate Change on July 25, 2023 Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12726 | 7/10/2023 | 2023_07_10_Liberty_ReplyComments_2023-2025WMP_R0
| | Liberty Utilities |
12713 | 7/10/2023 | 2023 07-10 BVES ReplyComments 2023-2025WMP R0
15 page(s) | | Bear Valley Electric Service, Inc. |
12674 | 6/29/2023 | 2023 06_29 GPI OpeningComments 2023_2025WMP R0 Comments on SMJU WMPs | | Green Power Institute |
12673 | 6/29/2023 | 2023 06_29 Public Advocates Office OpeningComments Liberty 2023_2025WMP R0
| | California Public Utilities Commission |
12672 | 6/29/2023 | 2023 06_29 Public Advocates Office OpeningComments BVES 2023_2025WMP R0
| | California Public Utilities |
12671 | 6/29/2023 | 2023 06_29 Public Advocates Office OpeningComments PacifiCorp 2023_2025WMP R0
| | California Public Utilities |
12621 | 6/28/2023 | 2023_06_28_RCRC_OpeningComments_2023_2025WMP_R0 Opening Comments to SMJU Wildfire Mitigation Plans 2 page(s) | | Rural County Representatives of California |
12608 | 6/23/2023 | Small WMP Workshop Slides PowerPoint slides from the June 16, 2023, Small and Multi-Jurisdiction WMP Public Workshop. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12607 | 6/23/2023 | Small WMP Workshop Recording Notice Notice for the YouTube link for the June 16, 2023, Small and Multi-Jurisdiction WMP Public Workshop. Electrical Infrastructure 1 page(s) | | Office of Energy Infrastructure Safety |
12604 | 6/22/2023 | 2023_06_22_CDFW_OpeningComments_PacifiCorp_2023_2025WMP_R0
Electrical Infrastructure | | California Department of Fish and Wildlife |
12603 | 6/22/2023 | 2023_06_22_CDFW_OpeningComments_Liberty_2023_2025WMP_R0
Electrical Infrastructure | | California Department of Fish and Wildlife |
12602 | 6/22/2023 | 2023_06_22_CDFW_OpeningComments_BVES_2023_2025WMP_R0
Electrical Infrastructure | | California Department of Fish and Wildlife |
12595 | 6/22/2023 | Revision Notice for PG&E's 2023-2025 WMP Enclosed is a Revision Notice the Office of Energy Infrastructure Safety (Energy Safety) is
issuing in conjunction with its review of Pacific Gas and Electric Company’s (PG&E) 2023-2025
WMP (Base WMP). | | Office of Energy Infrastructure Safety |
12586 | 6/21/2023 | Notice of 2025 WMP Update Guidelines Workshop Notice of a public workshop on the development of the 2025 Wildfire Mitigation Plan Update Guidelines to be held on July 19, 2023. Included in the document are Energy Safety's preliminary proposals. | | Office of Energy Infrastructure Safety |
12485 | 6/15/2023 | Risk Modeling Working Group Summary Report, Phase I In October 2021, Energy Safety began hosting a series of RMWG sessions. The sessions were split into two phases. Phase I prioritized information sharing related to wildfire risk modeling. This report summarizes Phase I and establishes a foundation for Phase II work. | | Office of Energy Safety Infrastructure |
12455 | 6/9/2023 | Energy Safety Response to PacifiCorp Request for Extension Energy Safety response to PacifiCorp’s request to extend Cal Advocates' comment deadline for PacifiCorp’s 2023-2025 WMP. | | Office of Energy Infrastructure Safety |
12451 | 6/8/2023 | Regulatory Recommendations Workshop Notice and Agenda
Electrical Infrastructure | | Energy Safety |
12446 | 6/8/2023 | Revised 2023 Wildfire Mitigation Plan Schedule Energy Safety is hereby extending the 2023 WMP schedule. This includes a delay to the SMJU public workshop, to the publication dates for the Large Investor-Owned Utilities (IOUs) Revision Notices (where necessary) and draft Decisions, and to the publication dates for the SMJU and ITO Revision Notices (where necessary) and draft Decisions. 2 page(s) | Wildfire Mitigation Plan Stakeholders | Office of Energy Infrastructure Safety |
12438 | 6/7/2023 | Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan with non-substantive errata changes 411 page(s) | | Bear Valley Electric Service, Inc. |
12437 | 6/7/2023 | BVES Errata to 2023-2025 Wildfire Mitigation Plan Non-substantive errata 2 page(s) | Caroline Thomas Jacobs Director | Bear Valley Electric Service, Inc. |
12436 | 6/6/2023 | 2023_06_06_SDG&E_ReplyComments_2023_2025WMP_R0
| | San Diego Gas & Electric |
12435 | 6/6/2023 | 2023_06_06_SCE_ReplyComments_2023-2025WMP_R0
| | Southern California Edison |
12433 | 6/6/2023 | 2023 06-06 PG&E ReplyComments 2023-2025WMP R0
| | PG&E |
12432 | 6/6/2023 | 2023 06-06 RCRC ReplyComments 2023-2025WMP R0 Reply Comments to Large IOUs 3 page(s) | | Rural County Representatives of California |
12431 | 6/6/2023 | 2023 06-06 Mussey Grade Road Alliance ReplyComments 2023-2025WMP R0 REPLY COMMENTS ON 2023-2025 WILDFIRE MITIGATION PLANS OF PG&E, SCE, AND SDG&E | | Mussey Grade Road Alliance |
12429 | 6/5/2023 | PacifiCorp 2023 WMP Comment Extension Request (6-5-23)
| | PacifiCorp |
12403 | 6/1/2023 | 2023 SMJU ITO WMP Workshop Agenda Description and agenda for Friday, June 16, 2023, workshop Electrical Infrastructure | | Energy Safety |
12390 | 5/28/2023 | 2023_05_28_Troy_OpeningComments_PGE_2023_2025WMP_R0
| | Montclair Hills, Oakland Resident |
12389 | 5/27/2023 | 2023_05_27_Christenson_OpeningComments_PGE_2023_2025WMP_R0 Personal experience with 1991 Oakland Hills firestorm Electrical Infrastructure | | Montclair Hills, Oakland Resident |
12388 | 5/26/2023 | 2023_05_26_Ramachandran_OpeningComments_PGE_2023_2025WMP_R0 Letter from Councilmember Ramachandran 1 page(s) | | Oakland City Council D4 |
12387 | 5/26/2023 | 2023_05_26_Anonymous_OpeningComments_PGE_2023_2025WMP_R0
| | Montclair Resident |
12386 | 5/26/2023 | 2023_05_26_Buckingham_OpeningComments_PGE_2023_2025WMP_R0 Comment on Risk Factors and Concern of Montclair for improved risk assessment and mitigation. Electrical Infrastructure 3 page(s) | Office of Energy Infrastructure Safety | Montclair Property Owner |
12385 | 5/26/2023 | 2023_05_26_Green_Power_Institute_OpeningComments_2023_2025WMP_R0 Comments to PG&E, SCE, and SDG&E WMP filings | | Green Power Institute |
12384 | 5/26/2023 | 2023_05_26_The_Utility_Reform_Network_OpeningComments_SCE_2023_2025WMP_R0
| | The Utility Reform Network |
12383 | 5/26/2023 | 2023_05_26_The_Utility_Reform_Network_Appendices_SDGE_2023_2025WMP_R0
| | The Utility Reform Network |
12382 | 5/26/2023 | 2023_05_26_The_Utility_Reform_Network_OpeningComments_SDGE_2023_2025WMP_R0
| | The Utility Reform Network |
12381 | 5/26/2023 | 2023_05_26_The_Utility_Reform_Network_Appendices_PGE_2023_2025WMP_R0
| | The Utility Reform Network |
12380 | 5/26/2023 | 2023_05_26_The_Utility_Reform_Network_OpeningComments_PGE_2023_2025WMP_R0
| | The Utility Reform Network |
12379 | 5/26/2023 | 2023_05_26_Joint_CCAs_OpeningComments_PGE_2023_2025WMP_R0 Opening Comments of Marin Clean Energy, Sonoma Clean Power Authority, Pioneer Community Energy, and East Bay Community Energy on PG&E's 2023 to 2025 Wildfire Mitigation Plan Electrical Infrastructure 36 page(s) | Office of Energy Infrastructure Safety | Law Office of David Peffer |
12378 | 5/26/2023 | 2023_05_26_CalAdvocates_OpeningComments_2023_2025WMP_R0 Comments to PG&E, SCE, and SDG&E WMP filings | | California Public Utilities Commission - Public Advocates Office |
12377 | 5/26/2023 | 2023_05_26_So_OpeningComments_PGE_2023_2025WMP_R0
| | Individual |
12376 | 5/26/2023 | 2023_05_26_Isola_OpeningComments_PGE_2023_2025WMP_R0 Comments | | Montclair, Oakland resident |
12375 | 5/26/2023 | 2023_05_26_RCRC_OpeningComments_2023_2025WMP_R0 Comments to PG&E and SCE WMP filings 8 page(s) | | Rural County Representatives of California |
12374 | 5/26/2023 | 2023_05_26_City_of_Oakland_OpeningComments_PGE_2023_2025WMP_R0
| | City of Oakland |
12369 | 5/26/2023 | 2023_05_26_Mechem_OpeningComments_PGE_2023_2025WMP_R0 Comments about why Montclair should be in the PGE WMP Electrical Infrastructure 3 page(s) | Energy Safety | Curran Mechem Family |
12368 | 5/26/2023 | 2023_05_25_CDFW_OpeningComments_SDGE_2023_2025WMP_R0
Electrical Infrastructure | | California Department of Fish and Wildlife |
12367 | 5/26/2023 | 2023_05_25_CDFW_OpeningComments_SCE_2023_2025WMP_R0
Electrical Infrastructure | | California Department of Fish and Wildlife |
12366 | 5/26/2023 | 2023_05_25_CDFW_OpeningComments_PGE_2023_2025WMP_R0
Electrical Infrastructure | | California Department of Fish and Wildlife |
12365 | 5/26/2023 | 2023_05_26_Joint_Local_Governments_OpeningComments_PGE_2023_2025WMP_R0
| | Downey Brand LLP |
12364 | 5/26/2023 | 2023_05_26_City_of_Moorpark_OpeningComments_SCE_2023_2025WMP_R0
| | Downey Brand LLP |
12363 | 5/26/2023 | 2023_05_26_MGRA_OpeningComments_2023_2025WMP_R0 Mussey Grade Road Alliance Comments on 2023-2025 Wildfire Mitigation Plans of PG&E, SCE, and SDG&E | | Mussey Grade Road Alliance |
12362 | 5/25/2023 | 2023_05_25_Southard_OpeningComments_PGE_2023_2025WMP_R0
| | Undergrounding Montclair |
12341 | 5/22/2023 | 2023_05_22_Allenby_OpeningComments_PGE_2023_2025WMP_R0
| | Montclair, Oakland resident |
12340 | 5/19/2023 | 2023_05_19_Barbera_OpeningComments_PGE_2023_2025WMP_R0
Electrical Infrastructure | | Montclair Hills, Oakland California resident |
12336 | 5/19/2023 | 2023-05-19_Liberty_2023_WMP_R1
| | Liberty Utilities |
12335 | 5/19/2023 | 2023-05-19_Liberty_Cover Letter_2023_WMP_R1
| | Liberty Utilities |
12332 | 5/19/2023 | Liberty Application for Confidential Treatment of 2023 WMP
| | Liberty Utilities |
12319 | 5/18/2023 | BVES Wildfire Mitigation Plan Errata 05-18-2023 BVES Errata to 2023-2025 Wildfire Mitigation Plan Electrical Infrastructure 2 page(s) | Caroline Thomas Jacobs | Bear Valley Electric Service, Inc. |
12303 | 5/17/2023 | Large IOU WMP Reply Comment Extension Reply Comment Deadline for Large IOU WMP has been extended to Tuesday, June 6, 2023. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12290 | 5/15/2023 | 2023-2025-WMPs_SCE_Request to Change Reply Comments Deadline
| | Southern California Edison |
12289 | 5/12/2023 | Energy Safety Community Vulnerability Scoping Meeting Slide Deck PowerPoint Presentation Scoping Meeting: Community Vulnerability in Wildfire Mitigation Planning May 10, 2023 | | Office of Energy Infrastructure Safety |
12229 | 5/8/2023 | 2023-05-08_PC_2023_WMP_R0.pdf
| | PacifiCorp |
12228 | 5/8/2023 | PacifiCorp 2023 WMP Submission Cover Letter - May 8 2023.pdf
| | PacifiCorp |
12227 | 5/8/2023 | 2023-05-08_LSPGC_2023_WMP_R0
| | LS Power |
12226 | 5/8/2023 | LSPGC WMP Cover Letter
| | LS Power |
12225 | 5/8/2023 | Trans Bay Cable 2023 WMP
| | Trans Bay Cable LLC |
12224 | 5/8/2023 | Trans Bay Cable WMP Cover Letter
| | Trans Bay Cable LLC |
12223 | 5/8/2023 | Horizon West Transmission 2023 WMP
| | Horizon West Transmission LLC |
12222 | 5/8/2023 | Horizon West Transmission 2023 WMP Cover Letter
| | Horizon West Transmission LLC |
12221 | 5/8/2023 | Horizon West Transmission Application for Confidential Treatment
| | Horizon West Transmission LLC |
12220 | 5/8/2023 | Bear Valley Electric Service, Inc. 2023-2025 WMP Appendices
| | Bear Valley Electric Service, Inc. |
12219 | 5/8/2023 | Bear Valley Electric Service, Inc. 2023-2025 Wildfire Mitigation Plan
| | Bear Valley Electric Service, Inc. |
12218 | 5/8/2023 | Liberty Application for Confidential Treatment of WMP
| | Liberty Utilities |
12217 | 5/5/2023 | 2023-05-05_Liberty_2023_WMP_R0
| | Liberty Utilities |
12216 | 5/5/2023 | Liberty_Cover Letter_2023 WMP Update
| | Liberty Utilities |
12215 | 5/8/2023 | Trans Bay Cable Application for Confidential Treatment
| | Trans Bay Cable LLC |
12191 | 5/3/2023 | Large IOU WMP Workshop Slides and Recording Recording link and slides from the April 27 and 28, 2023, workshop on the Wildfire Mitigation Plans of PG&E, SCE, and SDG&E. | | Office of Energy Infrastructure Safety |
12124 | 4/26/2023 | SDG&E 2023-2025 Wildfire Mitigation Plan Non-Substantive Errata
| | San Diego Gas & Electric |
12123 | 4/26/2023 | SDG&E Application for Confidential Treatment of WMP Errata
| | San Diego Gas & Electric |
12122 | 4/26/2023 | SCE Non-Substantive Errata for the 2023-2025 WMP
| | Southern California Edison |
12121 | 4/26/2023 | PG&E's 2023-2025 Wildfire Mitigation Plan Non-Substantive Errata
| | PG&E |
12120 | 4/26/2023 | 2023-04-06_PGE_2023_WMP_R2_Section 6.4.2_Atch01
| | PG&E |
12119 | 4/26/2023 | Revised 2023 Maturity Survey Adoption Meeting Materials Recording link and slides from the April 24, 2023, public meeting where the Revised 2023 Electrical Corporation Wildfire Mitigation Maturity Survey was adopted. | | Office of Energy Infrastructure Safety |
12118 | 4/26/2023 | Revised 2023 Maturity Survey Revised 2023 Electrical Corporation Wildfire Mitigation Maturity Survey adopted at the April 24, 2023, public meeting. | | Office of Energy Infrastructure Safety |
12080 | 4/21/2023 | Revised 2023 WMP Workshop Agenda Meeting details and agenda for WMP Workshop April 27-28, 2023. Meeting links have been revised. | | Office of Energy Infrastructure Safety |
12066 | 4/19/2023 | Proposed Final Revisions to 2023 Maturity Survey Proposed final revisions to the 2023 Electrical Corporation Wildfire Mitigation Maturity Survey to be considered for adoption at the April 24, 2023, adoption meeting. | | Office of Energy Infrastructure Safety |
12043 | 4/14/2023 | Adoption Meeting Notice for Revised 2023 Maturity Survey. Energy Safety will hold a public meeting on April 24, 2023, to consider the adoption of the Revised 2023 Electrical Corporation Wildfire Mitigation Maturity Survey. | | Office of Energy Infrastructure Safety |
12038 | 4/13/2023 | SCOPING MEETING Community Vulnerability in Wildfire Mitigation Planning Scoping Meeting Flyer & Agenda @caenergysafety SCOPING MEETING Community Vulnerability in Wildfire Mitigation Planning An Opportunity to Share Your Expertise FEATURED SPEAKERS: WEDNESDAY May 10, 2023 10 a.m. - 12:30 p.m. | | Office of Energy Infrastructure Safety |
12033 | 4/7/2023 | Workshop Notice - Large IOU WMPs Notice of April 27 - 28, 2023, public workshop on 2023-2025 Wildfire Mitigation Plan submissions of PG&E, SCE, and SDG&E. | | Office of Energy Infrastructure Safety |
12031 | 4/6/2023 | PG&E's 2023-2025 WMP Errata Confidentiality Declaration
| | PG&E |
12026 | 4/6/2023 | PG&E's 2023-2025 Wildfire Mitigation Plan Errata
| | PG&E |
12025 | 4/6/2023 | 2023-04-06_PGE_2023_WMP_R1_Section 6.4.2_Atch01 Errata attachment to 2023-2025 WMP | | PG&E |
12024 | 4/6/2023 | PG&E's 2023-2025 Wildfire Mitigation Plan Errata Cover Letter
| | PG&E |
12023 | 4/6/2023 | 2023-04-06_SCE_2023_WMP_Errata
| | Southern California Edison |
12019 | 4/5/2023 | SH-12 PSPS MICROGRID SITE REVIEW Redacted
| | Southern California Edison |
12018 | 4/5/2023 | OEIS Declaration of Confidentiality 2023 WMP April 4 2023
| | Southern California Edison |
12010 | 4/3/2023 | SDG&E Comments_Substantive Revision to 2023 Maturity Survey
| | San Diego Gas & Electric |
12009 | 4/3/2023 | SCE Comments re OEIS Notice Substantive Rev Maturity Survey
| | Southern California Edison |
12008 | 4/3/2023 | PG&E's Comments on Substantive Revision to 2023 Maturity Survey
| | PG&E |
11994 | 3/30/2023 | PG&E's 2023 WMP Discovery Tracker – March 30, 2023
| | PG&E |
11987 | 3/28/2023 | Limitations of E-Filing System with PG&E's 2023-2025 WMP
| | PG&E |
11986 | 3/28/2023 | 2023-03-27_SDGE_2023_WMP_Cover_Letter_R0
| | San Diego Gas & Electric |
11965-1 | 3/27/2023 | PG&E's 2023-2025 Wildfire Mitigation Plan
| | PG&E |
11965-2 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Appendix D ACI PG&E-22-11_Atch01
| | PG&E |
11965-3 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Appendix D ACI PG&E-22-11_Atch02
| | PG&E |
11965-4 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Section 6.4.2_Atch01
| | PG&E |
11965-5 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Section 10_Atch01
| | PG&E |
11965-6 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Section 10_Atch02_Redacted
| | PG&E |
11965-7 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Section 6.6.1_Atch01
| | PG&E |
11965-8 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Section 8.2.3_Atch01_Redacted
| | PG&E |
11965-9 | 3/27/2023 | 2023-03-27_PGE_2023_WMP_R0_Section 8.3.3_Atch01
| | PG&E |
11964-1 | 3/27/2023 | CAISO Standards for Reliability Safety Emergencies Disasters
| | Southern California Edison |
11964-2 | 3/27/2023 | GO 128 Rules - Const UG Electric Supply Comm Systems 01.06
| | Southern California Edison |
11964-3 | 3/27/2023 | GO 166 Stdrs Op Reliability Safety During ER and Disasters
| | Southern California Edison |
11964-4 | 3/27/2023 | Joint IOU CC Testing Cumulative Report 12-22-22_Redacted
| | Southern California Edison |
11964-5 | 3/27/2023 | Quant and Qual Factors for PSPS Decision Making
| | Southern California Edison |
11964-6 | 3/27/2023 | REFCL Projects at Southern California Edison
| | Southern California Edison |
11964-7 | 3/27/2023 | SCE Fast Curve Protection Philosophy Review_Redacted
| | Southern California Edison |
11963 | 3/27/2023 | PG&E's 2023-2025 Wildfire Mitigation Plan Confidentiality Declaration
| | PG&E |
11962-1 | 3/27/2023 | PSPS Decision-making Technical Paper
| | Southern California Edison |
11962-2 | 3/27/2023 | PSPS OIR Phase 1 D.19-05-042
| | Southern California Edison |
11962-3 | 3/27/2023 | PSPS OIR Phase 2 D.20-05-051
| | Southern California Edison |
11962-4 | 3/27/2023 | PSPS OIR Phase 3 D.21-06-034
| | Southern California Edison |
11962-5 | 3/27/2023 | PSPS Order Instituting Investigation (OII) (D.21-06-014)
| | Southern California Edison |
11962-6 | 3/27/2023 | Public Safety Power Shutoff_ Decision-Making
| | Southern California Edison |
11962-7 | 3/27/2023 | REFCL_2014 Analysis of resonant earthed networks
| | Southern California Edison |
11962-8 | 3/27/2023 | SB901 Sep2017
| | Southern California Edison |
11962-9 | 3/27/2023 | SCE VM-3_Program Guide
| | Southern California Edison |
11962-10 | 3/27/2023 | SH-12 PSPS MICROGRID SITE REVIEW_Redacted
| | Southern California Edison |
11962-11 | 3/27/2023 | Southern California Edison All-Hazards Plan_Redacted
| | Southern California Edison |
11962-12 | 3/27/2023 | Transmission Detail QC Inspection Process_Redacted
| | Southern California Edison |
11962-13 | 3/27/2023 | Transmission Inspection and Maintenance Program (TIMP)
| | Southern California Edison |
11962-14 | 3/27/2023 | UVM-01 (Utility Vegetation Management Program Manual)
| | Southern California Edison |
11962-15 | 3/27/2023 | UVM-02 (Transmission Vegetation Management Program (TVMP))
| | Southern California Edison |
11962-16 | 3/27/2023 | UVM-03 (Distribution Vegetation Management Program (DVMP))
| | Southern California Edison |
11962-17 | 3/27/2023 | UVM-04 (Hazard Tree Management Program (HTMP))
| | Southern California Edison |
11962-18 | 3/27/2023 | UVM-05 (Integrated Vegetation Management Plan (IVMP))
| | Southern California Edison |
11962-19 | 3/27/2023 | UVM-06 (LiDAR Schedule Reference Guide)
| | Southern California Edison |
11962-20 | 3/27/2023 | UVM-07 (Post Work Verification and UVM Program Oversight)
| | Southern California Edison |
11962-21 | 3/27/2023 | UVM-08 (Managing Vegetation Threats)
| | Southern California Edison |
11962-22 | 3/27/2023 | UVM-18 (Assessment and Removal of Dead and Dying Trees)
| | Southern California Edison |
11962-23 | 3/27/2023 | Vegetation Management - Operations IMT Storm Manual
| | Southern California Edison |
11962-24 | 3/27/2023 | WRF User Guide
| | Southern California Edison |
11961 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11960 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11959 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11958 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11957 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11956 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11955 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11954 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11953 | 3/27/2023 | OEIS_Confidentiality_Application_2023_WMP executed
| | Southern California Edison |
11952-1 | 3/27/2023 | 2023-03-27_SCE_2023_WMP_Cover_Letter_R0
| | Southern California Edison |
11952-2 | 3/27/2023 | 2023-03-27_SCE_2023_WMP_R0
| | Southern California Edison |
11952-3 | 3/27/2023 | AFN Plan
| | Southern California Edison |
11952-4 | 3/27/2023 | 2023 WMP SCE Table 8-59 List of Community Partners
| | Southern California Edison |
11952-5 | 3/27/2023 | 2023 WMP SCE Sections 8-4 and 8-5 Large Tables – REDACTED
| | Southern California Edison |
11952-6 | 3/27/2023 | Covered Conductor Compendium
| | Southern California Edison |
11952-7 | 3/27/2023 | Distribution Inspection and Maintenance Program (DIMP)
| | Southern California Edison |
11952-8 | 3/27/2023 | Energy Release Component (ERC) Fact Sheet
| | Southern California Edison |
11952-9 | 3/27/2023 | ESRB-8 Resolution Extending De-Energization Reasonableness, Notification, Mitigation, and Reporting Requirements in Decision 12-
| | Southern California Edison |
11952-10 | 3/27/2023 | Generation QC Inspection Process
| | Southern California Edison |
11952-11 | 3/27/2023 | GO 95 Rules for Electric Overhead Line Construction Jan2020
| | Southern California Edison |
11952-12 | 3/27/2023 | Maintenance and Inspection Manual - Appendix A
| | Southern California Edison |
11952-13 | 3/27/2023 | Materials Specification 454
| | Southern California Edison |
11952-14 | 3/27/2023 | Overhead Detailed QC Inspection Process_Redacted
| | Southern California Edison |
11952-15 | 3/27/2023 | PGE_ACI_Covered_Conductor_Testing_Redacted
| | Southern California Edison |
11949 | 3/27/2023 | Application for CONFIDENTIAL Treatment
| | San Diego Gas & Electric Company |
11948 | 3/27/2023 | 2023-2025 SDGE WMP with Attachments
| | San Diego Gas & Electric Company |
11939 | 3/21/2023 | Revised WMP Schedule for SMJUs and ITOs Revised WMP schedule for Small Multi-Jurisdictional Utilities and Independent Transmission Operators. The SMJUs and ITOs will submit their 2023-2025 WMPs on May 8, 2023. | | Office of Energy Infrastructure Safety |
11881 | 3/3/2023 | Substantive Revisions to Maturity Survey for Public Comment Proposed substantive revisions to 2023 Electrical Corporation Wildfire Mitigation Maturity Survey. Comments will be accepted through April 3, 2023. | | Office of Energy Infrastructure Safety |
11866 | 2/24/2023 | Data Request Stakeholder Designation RCRC Data Request Stakeholder Designation for all electrical corporations Electrical Infrastructure 2 page(s) | | Rural County Representatives of California |
11851-1 | 2/21/2023 | Second Revised Maturity Model
| | Office of Energy Infrastructure Safety |
11851-2 | 2/21/2023 | Second Revised Maturity Survey
| | Office of Energy Infrastructure Safety |
11850 | 2/21/2023 | Second Revised Maturity Model and Survey Letter Non-substantive edits to the Maturity Model and Maturity Survey. Clean versions of the Maturity Model and Maturity Survey will be filed immediately following the publication of this letter. | | Office of Energy Infrastructure Safety |
11845 | 2/16/2023 | Request to become stakeholder
| | Green Power Institute |
11844 | 2/16/2023 | Request for Data Request Stakeholder Designation Requests Data Request Stakeholder designation for 2023-2025 WMP docket Electrical Infrastructure 2 page(s) | Caroline Thomas Jacobs | TURN |
11841 | 2/10/2023 | Energy Safety Utility Vegetation Management Best Practices Scoping Meeting Slide Deck This slide deck was presented during Energy Safety's scoping meeting on Utility Vegetation Management for Wildfire Safety, February 10, 2023. The slides include the results of the live polls, a link to the recording of the meeting, and a link to the post-meeting survey. | | Office of Energy Infrastructure Safety |
11811 | 2/1/2023 | MGRA Request for Stakeholder Designation
| | Mussey Grade Road Alliance |
11809 | 1/31/2023 | Public Advocates Office Request for Data Request Stakeholder Designation 2023-2025-WMPs
| | CPUC |
11807 | 1/24/2023 | SCOPING MEETING Utility Vegetation Management Best Practices for Wildfire Safety Energy Safety is hosting an initial scoping meeting for stakeholders, relevant state agencies, and California’s electrical corporations to share ideas and discuss best practices for utility vegetation management (UVM) for wildfire safety. This meeting will be on Friday, February 10 from 9am to 12:30pm PST. 2 page(s) | | Office of Energy Infrastructure Safety |
11806 | 1/23/2023 | QDR Table 10 Projections Expectations Expectations for Projections in Quarterly Data Report Table 10: Recent use of Public Safety Power Shutoffs (PSPS) and other PSPS metrics | | Office of Energy Infrastructure Safety |
11798 | 1/10/2023 | QDR Table 2 Projections Expectations Letter of expectations regarding projections of Performance Metrics in Table 2 of the Quarterly Data Report | | Office of Energy Infrastructure Safety |
11795 | 1/6/2023 | Revised Final Electrical Corporation Wildfire Mitigation Maturity Survey and Model Final versions of the Electrical Corporation Wildfire Mitigation Maturity Survey and Model including non-substantive edits to correct typos and errors in numbering. Electrical Infrastructure | | OEIS |
11783 | 12/23/2022 | Letter Soliciting Input in Review of Electrical Infrastructure Safety Requirements Energy Safety letter soliciting public input in its review of electrical infrastructure safety requirements. Energy Safety's review, pursuant to Public Utilites Code section 326(a)(7), will focus on, ". . . safety requirements for electrical transmission and distribution infrastructure and infrastructure and equipment attached to that electrical infrastructure. . ." | | Office of Energy Infrastructure Safety |
11753 | 12/8/2022 | Adoption Meeting Slides and Recording Presentation slides and recording link from December 6, 2022, public adoption meeting for 2023-2025 Wildfire Mitigation Plan Guidelines. | | Office of Energy Infrastructure Safety |
11750 | 12/7/2022 | 2023 WMP Schedule Schedule for 2023 Wildfire Mitigation Plan submission and evaluation | | Office of Energy Infrastructure Safety |
11749 | 12/7/2022 | 2023-2025 ITO Supplement Final 2023-2025 Independent Transmission Operator Supplement to the Technical Guidelines | | Office of Energy Infrastructure Safety |
11748 | 12/7/2022 | 2023-2025 Wildfire Mitigation Maturity Model Final 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Model | | Office of Energy Infrastructure Safety |
11747 | 12/7/2022 | 2023 Wildfire Mitigation Maturity Survey Final 2023 Electrical Corporation Wildfire Mitigation Maturity Survey | | Office of Energy Infrastructure Safety |
11746 | 12/7/2022 | 2023-2025 WMP Process Guidelines Final 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines | | Office of Energy Infrastructure Safety |
11745 | 12/7/2022 | 2023-2025 WMP Technical Guidelines Final 2023-2025 Wildfire Mitigation Plan Technical Guidelines | | Office of Energy Infrastructure Safety |
11744 | 12/7/2022 | Final 2023-2025 WMP Guidelines Cover Letter Cover letter for Final 2023-2025 Wildfire Mitigation Plan Guidelines documents. The final documents were adopted at the December 6, 2022, adoption meeting. | | Office of Energy Infrastructure Safety |
11741 | 12/5/2022 | Proposed Final 2023-2025 ITO Supplement Proposed Final 2023-2025 Independent Transmission Operator Supplement to the Wildfire Mitigation Plan Technical Guidelines. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting. | | Office of Energy Infrastructure Safety |
11738 | 12/5/2022 | Proposed Final 2023-2025 WMP Technical Guidelines Proposed Final 2023-2025 Wildfire Mitigation Plan Technical Guidelines. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting. | | Office of Energy Infrastructure Safety |
11737 | 12/5/2022 | Proposed Final 2023-2025 WMP Process Guidelines Proposed Final 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting. | | Office of Energy Infrastructure Safety |
11736 | 12/5/2022 | Proposed Final 2023 Maturity Survey Proposed Final 2023 Electrical Corporation Wildfire Mitigation Maturity Survey. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting. | | Office of Energy Infrastructure Safety |
11735 | 12/5/2022 | Proposed Final 2023-2025 Maturity Model Proposed Final 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Model. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting. | | Office of Energy Infrastructure Safety |
11734 | 12/2/2022 | Letter on 2023 WMP Submission Template Letter providing an update on the 2023 Wildfire Mitigation Plan Submission Template. | | Office of Energy Infrastructure Safety |
11716 | 11/23/2022 | Notice of Adoption Meeting for 2023-2025 WMP Guidelines Public meeting announcement for 2023-2025 Wildfire Mitigation Plan Guidelines Adoption Meeting to take place December 6, 2022. | | Office of Energy Infrastructure Safety |
11715 | 11/23/2022 | Energy Safety Response to WSAB Recommendations on WMP Guidelines Office of Energy Infrastructure Safety's response to Wildfire Safety Advisory Board's April 26, 2022, recommendations on Wildfire Mitigation Plan Guidelines | | Office of Energy Infrastructure Safety |
11607 | 10/27/2022 | Pacific Gas and Electric Company’s Comments on the Office of Energy Infrastructure Safety’s Draft 2023-2025 WMP Schedule
| | PG&E |
11604 | 10/26/2022 | Nancy B Macy Comments on OEIS Draft 2023-2025 Wildfire Mitigation Plan Guidelines Package 1 Comments on OEIS Draft 2023 Wildfire Mitigation Plan Guidelines Electrical Infrastructure 2 page(s) | OEIS | Valley Women's Club Environmental Committee for San Lorenzo Valley |
11603 | 10/26/2022 | GPI Comments on the Draft 2023 WMP Guidelines
| | Green Power Institute |
11601 | 10/26/2022 | SDGE Comments to Draft 2023-2025 Wildfire Mitigation Plan Guidelines - Package 1
| | San Diego Gas & Electric |
11600 | 10/26/2022 | SDG&E Comments to Draft 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey
| | San Diego Gas & Electric |
11598 | 10/26/2022 | LS Power Comments on the Draft 2023 WMP Schedule
| | LS Power |
11597 | 10/26/2022 | SCE Comments on the Draft 2023-2025 Wildfire Mitigation Plan Guidelines - Package 1
| | Southern California Edison |
11596 | 10/26/2022 | SCE Comments on the Draft 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey
| | Southern California Edison |
11595 | 10/26/2022 | Public Advocates Office Comments on 2023 WMP Guidelines
| | CPUC |
11594 | 10/26/2022 | Joint Local Governments' Comments on 2023-2025 WMP Guidelines
Electrical Infrastructure | | Downey Brand LLP |
11593 | 10/26/2022 | California Association of Small and Multi-Jurisdictional Utilities (“CASMU”) Comments on the Draft 2023-2025 Wildfire Mitigation
Electrical Infrastructure 13 page(s) | Office of Energy Infrastructure Safety | Downey Brand LLP |
11591 | 10/26/2022 | Pacific Gas and Electric Company’s Comments on the Office of Energy Infrastructure Safety’s Draft 2023-2025 WMP Guidelines
| | PG&E |
11590 | 10/26/2022 | Pacific Gas & Electric Company’s Comments on the Draft 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey
| | PG&E |
11588 | 10/26/2022 | California Association of Small and Multi-Jurisdictional Utilities (“CASMU”) Comments on the Draft 2023 WMP Schedule
Electrical Infrastructure 4 page(s) | Office of Energy Infrastructure Safety | Downey Brand LLP |
11586 | 10/26/2022 | Comments of Kevin Collins addressing 2023 WMP guidelines Letter to OEIS as comment upon the 2023 - 2025 guidelines for wildfire mitigation plans. Electrical Infrastructure 9 page(s) | Office of Energy Infrastructure Safety | Kevin Collins |
11585 | 10/26/2022 | MUSSEY GRADE ROAD ALLIANCE COMMENTS ON WILDFIRE MITIGATION PLAN GUIDELINES FOR 2023-2025
Electrical Infrastructure | | Mussey Grade Road Alliance |
11584 | 10/25/2022 | Robert A. Johnston Comments on the Draft 2023-25 WMP Guidelines Comments Electrical Infrastructure 4 page(s) | OEIS | UC Davis, retired |
11577 | 10/21/2022 | Draft 2023-2025 WMP Guidelines Workshop Slides and Recording Presentation slides and recording link from October 17, 2022, public workshop. | | Office of Energy Infrastructure Safety |
11563 | 10/14/2022 | Draft 2023 WMP Schedule Draft 2023 Wildfire Mitigation Plan Schedule published for public comment. Comments will be accepted through October 26, 2022. | | Office of Energy Infrastructure Safety |
11556 | 10/7/2022 | Draft Independent Transmission Operator Supplement to the 2023-2025 Wildfire Mitigation Plan Technical Guidelines This supplement presents the modified reporting requirements for ITOs, intended to inform the preparation and submission of their 2023–2025 comprehensive WMPs. Electrical Infrastructure | | OEIS |
11544 | 10/4/2022 | Public Meeting Notice: Workshop on Draft 2023-2025 WMP Guidelines The Office of Energy Safety will host a public workshop on October 17, 2022, to take public comments on documents related to the Draft 2023-2025 Wildfire Mitigation Plan Guidelines. | | Office of Energy Infrastructure Safety |
11495 | 9/21/2022 | 2023-2025 Wildfire Mitigation Plans Maturity Survey Maturity Survey 20220921 Electrical Infrastructure 471 page(s) | Shareholder / Public | Office of Energy Infrastructure Safety |
11491 | 9/19/2022 | Draft 2023-2025 Wildfire Mitigation Plan Guidelines Draft 2023-2025 Wildfire Mitigation Plan Guidelines package for public review and comment. Public comment will be accepted through October 26,2022. This package includes: 1) Draft 2023-2025 WMP Technical Guidelines (including Maturity Model) and 2) Draft 2023-2025 WMP Process and Evaluation Guidelines | | Office of Energy Infrastructure Safety |
10879 | 5/6/2022 | Comments of Kevin Collins addressing 2023 WMP guidelines WMP comment filing Electrical Infrastructure 5 page(s) | Office of Energy Infrastructure Safety | Kevin Collins |
10872 | 5/6/2022 | #2023-WMPs Comments--Valley Women's Club #2023-WMPs Comments--Valley Women's Club Electrical Infrastructure 3 page(s) | Melissa Spencer, Deputy Director Electrical Infrastructure Directorate California Office of Infrastructure Safety | Valley Women's Club |
10870 | 5/6/2022 | Abrams 2023 WMP Proposed Guidelines and Comments
| | Self |
10868 | 5/6/2022 | Cal Advocates Comments on 2023 WMP Guidelines
| | California Public Utilities Commission |
10867 | 5/6/2022 | 2022-05-06_SCE_2022_Comments-Re-Workshop- 2023-WMP-Guideline-Development_R0
| | Southern California Edison |
10866-1 | 5/6/2022 | MUSSEY GRADE ROAD ALLIANCE COMMENTS ON THE 2023 WILDFIRE MITIGATION PLAN GUIDELINES WORKSHOP
Electrical Infrastructure | | Mussey Grade Road Alliance |
10866-2 | 5/6/2022 | SDG&E Comments to 2023 WMP Guidelines Workshop
7 page(s) | | San Diego Gas & Electric |
10866-3 | 5/6/2022 | PGE Comments on 2023 WMP Guidelines Workshop Comments of Pacific Gas and Electric Company on the 2023 Wildfire Mitigation Plan Guidelines Workshop Docket: 2023-WMPs | | PG&E |
10866-4 | 5/6/2022 | Comments of the Green Power Institute on the 2023 WMP Guidelines and April 22 Workshop
Electrical Infrastructure 32 page(s) | | Green Power Institute |
10819 | 4/26/2022 | 2023 WMP Guidelines Workshop Slides and Recording Presentation slides and recording link from April 22, 2022, public workshop. | | Office of Energy Infrastructure Safety |
10795 | 4/19/2022 | 2023 WMP Guidelines Pre-Workshop Material Pre-workshop material for April 22, 2022, public workshop. Overview of preliminary proposals for 2023 Wildfire Mitigation Plan Guidelines. | | Office of Energy Infrastructure Safety |
10755 | 4/8/2022 | 2023 WMP Guidelines Workshop Announcement Public Meeting Announcement - April 22, 2022: Workshop on 2023 Wildfire Mitigation Plan Guideline Development.
Written comments accepted through May 6, 2022. | | Office of Energy Infrastructure Safety |