Docket Log

REF #Docketed DateDocument TitleToFrom
1501411/19/2024Decision for PG&E 2025 WMP Update
Decision for Pacific Gas and Electric Company 2025 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
1501011/14/2024SCE 2023-2025 Base WMP R3.1
This version incorporates all approved errata, corrections requested by Energy Safety, and reportable updates arising from the 2025 WMP Update. It also includes an update that the R3 version did not include.
 Southern California Edison
1500311/13/20242024-11-13_SDGE_2025_WMP_Update_Change_Order_Letter
 San Diego Gas & Electric
1498411/6/2024SCE 2023-2025 Base WMP R3
 Southern California Edison
1497111/4/2024SCE 2025 WMP Update R1 (November 4, 2024)
 Southern California Edison
1493810/31/2024Decision for SCE 2025 WMP Update
Decision for Southern California Edison Company 2025 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
1493110/30/2024Decision for SDG&E 2025 WMP Update
Decision for San Diego Gas & Electric 2025 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
1491610/21/2024Decision for BVES 2025 WMP Update
Decision for Bear Valley Electric Service, Inc. 2025 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
1488310/9/2024Draft Decision for TBC 2025 WMP Update
Draft Decision for Trans Bay Cable 2025 Wildfire Mitigation Plan Update. Stakeholder comments are due October 29, 2024. Reply comments are due November 8, 2024.
 Office of Energy Infrastructure Safety
1488210/9/2024Draft Decision for HWT 2025 WMP Update
Draft Decision for Horizon West Transmission 2025 Wildfire Mitigation Plan Update. Stakeholder comments are due October 29, 2024. Reply comments are due November 8, 2024.
 Office of Energy Infrastructure Safety
148399/30/2024Public Advocates Office Reply Comments on Draft Decision PGE
Reply Comments on PG&E 2025 WMP Update Draft Decision
 California Public Utilities Commission
148369/30/2024PG&E's Reply Comments to the 2025 Wildfire Mitigation Plan Update Draft Decision
 PG&E
148019/23/2024Public Advocates Office Reply Comments on Draft Decision of SCE 2025 WMP Update
Reply Comments
 California Public Utilities Commission
148009/23/2024SCE Reply Comments Draft Decision SCE 2025 WMP Update
 Southern California Edison
14790-19/20/20242024.09.20_PC_2023-2025_WMP_ Rev 5 (R5) - Clean
 PacifiCorp
14790-29/20/20242024.09.20_PC_2023-2025_WMP_ Rev 5 (R5) – Redline
 PacifiCorp
14790-39/20/20242024.09.20_PC_2025_WMP_Update_Rev 1 (R1) - Clean
 PacifiCorp
14790-49/20/20242024.09.20_PC_2025_WMP_Update_Rev 1 (R1) - Redline
 PacifiCorp
14790-59/20/2024PacifiCorp 2025 WMP Update Resubmission Cover Letter 9-20-24
In accordance with the Office of Energy Infrastructure Safety’s September 6, 2024, Rejection and Order to Resubmit, PacifiCorp provides this revised 2025 WMP Update originally submitted on July 8, 2024.
 PacifiCorp
14790-69/20/20242024.09.20_PC_CA Line Rebuild Data 2023-2025
 PacifiCorp
14790-79/20/20242024.09.20_PC_EFR Outage Summary and 2023 Data Updated 08012024
 PacifiCorp
14790-89/20/20242024.09.20_PC-23-07_Joint_IOU_CC Effectiveness Workstream_2025 WMP Report FINAL
 PacifiCorp
147899/20/20242024-09-20_SDGE_Reply_Comments_on_OEIS_Draft_Decision_on_SDGE_2025_WMP_Update
 San Diego Gas & Electric
147779/18/2024Public Advocates Office Comments on Draft Decision PGE 2025 WMP Update
 California Public Utilities Commission
147769/18/2024GPI Comments on the PG&E 2025 WMP Update
 Green Power Institute
147759/18/2024MGRA Comments on OEIS PGE Draft Decision
 Mussey Grade Road Alliance
147689/18/2024LSPGC 2023-2025 Base WMP R3 Clean
 LS Power
147679/18/2024LSPGC 2023-2025 Base WMP R3 Redline
 LS Power
147669/18/2024LSPGC 2025 WMP Update R1 Clean
 LS Power
147659/18/2024LSPGC 2025 WMP Update R1 Redline
 LS Power
147649/17/2024Application for Confidential Treatment HWT 2023-2025 WMP Base R2
 Horizon West Transmission LLC
147639/17/2024HWT 2023-2025 Base WMP R2 – Clean (Public)
 Horizon West Transmission LLC
147629/17/2024HWT 2023-2025 Base WMP R2 – Redline (Public)
 Horizon West Transmission LLC
147619/17/2024HWT 2023-2025 Base WMP Revision Cover Letter
Horizon West Transmission, LLC provides a revision to its 2023-2025 Base WMP to correct errors identified in the Office of Energy Infrastructure Safety’s Notice on Errata for Horizon West Transmission, LLC, 2023-2025 Base WMP Revision 1 dated September 10, 2024.
 Horizon West Transmission LLC
147609/17/2024Public Advocates Office Errata to Comments SCE 2025 WMP Update
Errata
 California Public Utilities Commission
147409/11/20242025 WMP Update - MGRA Comments on OEIS SCE Draft Decision
 Mussey Grade Road Alliance
147399/11/2024Public Advocates Office Comments on SCE 2025 WMP Update
 California Public Utilities Commission
147389/11/2024GPI Comments on Draft Decision on SCE 2025 WMP Update
 Green Power Institute
147369/11/2024Revised Schedule for Group 2 Electrical Corporation 2025 WMP Updates
Revised Schedule for Group 2 Electrical Corporations’ 2025 Wildfire Mitigation Plan Updates.
 Office of Infrastructure Energy Safety
147359/11/2024GPI Comments on Draft Decision on SDG&E 2025 WMP Update
 Green Power Institute
147289/10/2024Rejection and Order to Resubmit for LS Power 2025 WMP Update
This is a Rejection and Order to Resubmit for LS Power’s 2025 WMP Update. LS Power’s resubmission is due by Sept. 17, 2024. Opening comments on LS Power’s resubmitted 2025 WMP Update are due by Sept. 27 and reply comments are due by Oct. 2, 2024.
 Office of Energy Infrastructure Safety
147279/10/2024WMP-2025 - MGRA Comments on OEIS SDGE Draft Decision
 Mussey Grade Road Alliance
147269/10/2024Public Advocates Office Opening Comments on the SDG&E Draft Decision
Public Advocates Office’s Opening Comments on the Draft Decision Approving San Diego Gas & Electric Company’s 2023-2025 Wildfire Mitigation Plan
 California Public Utilities Commission
147259/10/2024Notice on Errata for HWT 2023-2025 Base WMP R1
Notice on substantive and non-substantive errata for Horizon West Transmission, LLC, 2023-2025 Base WMP R1. Revision due September 17, 2024.
 Office of Energy Infrastructure Safety
147249/10/20242024-09-10_SDGE_Comments_on_OEIS_Draft_Decision_on_SDGE_2025_WMP_Update
 San Diego Gas & Electric
147219/6/2024Rejection and Order to Resubmit for PacifiCorp 2025 WMP Update
Energy Safety rejects PacifiCorp's 2025 WMP Update and orders PacifiCorp to resubmit its 2025 WMP Update, including redlined and clean versions of all required components. Opening comments are due by October 2, 2024. Reply comments are due by October 7, 2024.
 Office of Energy Safety Infrastructure
146959/3/2024Liberty Application_Confidential Treatment of 2023-2025 WMP
 Liberty Utilities
146949/3/20242024-09-03_Liberty_2023_WMP_R6_Clean_Redacted
 Liberty Utilities
146939/3/20242024-09-03_Liberty_2023_WMP_R6_Redline_Redacted
 Liberty Utilities
146929/3/20242024-09-03_Liberty_2025_WMP-Update_R1_Clean
 Liberty Utilities
146919/3/20242024-09-03_Liberty_2025_WMP-Update_R1_Redline
 Liberty Utilities
146909/3/2024Liberty 2025 WMP Update Cover Letter_09032024
 Liberty Utilities
146708/29/2024Draft Decision for PG&E 2025 WMP Update
Draft Decision for Pacific Gas and Electric Company 2025 Wildfire Mitigation Plan Update. Stakeholder comments are due Sept. 18, 2024. Reply comments are due Sept. 30, 2024.
 Office of Energy Infrastructure Safety
146538/27/2024Draft Decision for BVES 2025 WMP Update
Draft Decision for Bear Valley Electric Service, Inc. 2025 Wildfire Mitigation Plan Update. Stakeholder comments due Sept. 16, 2024. Reply comments are due Sept. 26, 2024.
 Office of Energy Infrastructure Safety
146378/22/2024PacifiCorp 2023-2025-WMP Update Reply Comments 8-22-24
 PacifiCorp
146358/22/2024RCRC Reply Comments, Group 2 2025 WMP Update
Reply comments of the Rural County Representatives of California on Group 2 2025 Wildfire Mitigation Plan Updates
Electrical Infrastructure
3 page(s)
Caroline Thomas JacobsRural County Representatives of California
146298/22/2024Draft Decision for SCE 2025 Wildfire Mitigation Plan Update
This is Energy Safety's Draft Decision on SCE's 2025 Wildfire Mitigation Plan Update. Opening comments are due Sept. 11, 2024. Reply comments are due Sept. 23, 2024.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
146268/21/2024Draft Decision for SDG&E 2025 Wildfire Mitigation Plan Update
This is Energy Safety's Draft Decision on SDG&E's 2025 Wildfire Mitigation Plan Update. Opening comments are due Sept. 10, 2024. Reply comments are due Sept. 20, 2024.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
146168/19/20242024.08.19_PC_2025_WMP Update_EFR Outage Summary 2023 Data
 PacifiCorp
146158/19/20242024.08.19_PC_2023-2025_Base_WMP_R4_Redlined_Non-Substantive Errata
 PacifiCorp
146148/19/20242024.08019_PC_2023-2025_Base_WMP_R4 Cover Letter
PacifiCorp submits its non-substantive errata changes to its 2023-2025 Base Wildfire Mitigation Plan submitted on July 8, 2024.
 PacifiCorp
146108/19/2024Rejection and Order to Resubmit for Liberty 2025 WMP Update
This is a Rejection and Order to Resubmit for Liberty Utilities' 2025 WMP Update. Liberty's resubmission is due by Sept. 3, 2024. Opening comments on Liberty’s resubmitted 2025 WMP Update are due by Sept. 13 and reply comments are due by Sept. 20, 2024.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
145828/12/2024Comments of the Public Advocates Office on PacifiCorp’s 2025 Wildfire Mitigation Plan Update
 California Public Utilities Commission
145818/12/2024GPI Comments on Group 2 2025 WMP Updates
 Green Power Institute
145808/12/2024Comments of the Public Advocates Office on Liberty’s 2025 Wildfire Mitigation Plan Update
 California Public Utilities Commission
145798/9/2024CDFW Comments: PacifiCorp 2025 WMP Update

Electrical Infrastructure
 California Department of Fish and Wildlife
145788/9/2024CDFW Comments: Liberty 2025 WMP Update

Electrical Infrastructure
 California Department of Fish and Wildlife
145718/9/2024Liberty Application_Confidential Treatment of 2023-2025 WMP
 Liberty Utilities
145708/9/20242024-08-09_Liberty_2023-2025 Base_WMP_R5_Redlined Errata_Redacted
Liberty Utilities provides summarizing non-substantive errata changes to its 2023-2025 Base WMP submission on July 8, 2024
 Liberty Utilities
145698/9/20242024-08-09_Liberty_Cover Letter_2023_WMP_R5
Liberty Utilities provides summarizing non-substantive errata changes to its 2023-2025 Base WMP submission on July 8, 2024
 Liberty Utilities
145598/8/2024Group 2 WMP Workshop Recording and Slides
July 31, 2024, Group 2 Workshop on 2025 Wildfire Mitigation Plan Updates of Liberty Utilities, PacifiCorp, Horizon West Transmission, Trans Bay Cable, & LS Power Grid California
Electrical Infrastructure
 Office of Energy Infrastructure Safety
144897/26/20242024-07-26_Liberty_2023_WMP_R3.1 REDACTED
Liberty is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 Liberty Utilities
144887/29/2024Liberty Application_Confidential Treatment of 2023-2025 WMP
Liberty is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 Liberty Utilities
144877/26/20242023-07-26_Liberty_Cover Letter_2023_WMP_R3.1
Liberty is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 Liberty Utilities
144567/22/20242024-07-22_BVES_2025_WMP_R2_Redline
Submission in response to notice dated July 15, 2024.
 Bear Valley Electric Service, Inc.
144557/22/20242024-07-22_BVES_2025_WMP_R2
Submission in response to notice dated July 15, 2024.
 Bear Valley Electric Service, Inc.
144547/22/20242024-07-22_BVES_2025_WMP-Update_R2
Submission in response to notice dated July 15, 2024.
 Bear Valley Electric Service, Inc.
144537/22/2024GPI Comments on PGE Supplemental Updates
Comments of the Green Power Institute on the errata and supplemental reportable updates for Pacific Gas and Electric Company 2025 Wildfire Mitigation Plan Update
 Green Power Institute
144467/19/2024Public Meeting Notice - Group 2 2025 WMP Update Workshop
Public Meeting Notice - Group 2 2025 WMP Update Workshop
Electrical Infrastructure
3 page(s)
 Office of Energy Infrastructure Safety
144307/9/2024Application for Confidential Treatment HWT 2023-2025 Base WMP R1
 Horizon West Transmission LLC
144297/8/2024Application for Confidential Treatment HWT 2025 WMP Update R0
 Horizon West Transmission LLC
144287/8/2024Application for Confidential Treatment TBC 2023-2025 Base WMP (redlined and clean)
 Trans Bay Cable LLC
144277/15/2024Notice on Errata for BVES 2025 WMP Update
Notice on substantive and non-substantive errata for Bear Valley Electric Service, Inc., 2025 WMP Update. Revision due July 22, 2024. Comments on revised version due August 5, 2024.
 Office of Energy Infrastructure Safety
144027/8/2024Application for Confidential Treatment TBC_2025-WMP-Update
 Trans Bay Cable LLC
144017/8/2024HWT 2023-2025 Base WMP R1 - Redline REDACTED
 Horizon West Transmission LLC
144007/8/2024HWT 2023-2025 Base WMP R1 - Clean REDACTED
 Horizon West Transmission LLC
143997/8/2024HWT 2025 WMP Update R0 REDACTED
 Horizon West Transmission LLC
143987/8/2024HWT 2025 WMP Update Cover Letter
 Horizon West Transmission LLC
143977/8/2024TBC 2023-2025 Base WMP R1 - Redline REDACTED
 Trans Bay Cable LLC
143967/8/2024TBC 2023-2025 Base WMP R1 - Clean REDACTED
 Trans Bay Cable LLC
143957/8/2024TBC 2025 WMP-Update_R0 REDACTED
 Trans Bay Cable LLC
143947/8/2024TBC 2025 WMP Update Cover Letter
 Trans Bay Cable LLC
143937/8/2024LSPGC 2023-2025 Base WMP R2 Redline
 LS Power
143927/8/2024LSPGC 2023-2025 Base WMP R2 Clean
 LS Power
143917/8/20242024-07-08_LSPGC_2025_WMP-Update_R0
 LS Power
143907/8/20242024.07.08_PC_2025_WMP_Redline
 PacifiCorp
143897/8/20242024.07.08_PC_2025_WMP_Clean
 PacifiCorp
143887/8/20242024.07.08_PC_2025_WMP Update_EFR Outage Summary 2023 Data
 PacifiCorp
143877/8/20242024.07.08_PC_2025_WMP-Update_CA Line Rebuild Data2023-2025
See PC-23-15
 PacifiCorp
143867/8/20242024.07.08_PC_2025_WMP-Update R0
 PacifiCorp
143857/8/2024PacifiCorp Cover Letter 2025 WMP Update Submission 7-8-24
 PacifiCorp
143827/5/2024Confidentiality Declaration
 PG&E
143797/5/2024SDG&E 2025 WMP Update Confidentiality Declaration_R5_7.5.24
SDG&E is submitting its redline and clean updated 2023-2025 Base WMP. This version includes approved changes from its 2024 Change Order request, reportable updates requested in the 2025 WMP Update, and corrections and supplemental reportable updates per the letter issued by Energy Safety on 6/20/24
 San Diego Gas & Electric
143767/8/2024Liberty Application_Confidential Treatment of 2023-2025 WMP
 Liberty Utilities
143757/8/20242024_07-08_Liberty_2023_WMP_R4_Redline_Redacted
 Liberty Utilities
143747/8/20242024-07-08_Liberty_2023_WMP_R4_Clean_Redacted
 Liberty Utilities
143737/8/20242024-07-08_Liberty_2025_WMP-Update_R0
 Liberty Utilities
143727/8/2024Liberty 2025 WMP Update Cover Letter
 Liberty Utilities
143667/5/2024Confidentiality Declaration
 PG&E
143657/5/20242024-07-05_PGE_2023_WMP_R6_Appendix D ACI PG&E 22-16_Atch01 REDACTED
 PG&E
143647/5/2024PG&E’s 2023-2025 Wildfire Mitigation Plan Revision 6 – Redline Version
PG&E is submitting its redline and clean updated 2023-2025 Base WMP. This version includes approved changes from its 2024 Change Order request, reportable updates requested in the 2025 WMP Update, and corrections and supplemental reportable updates per the letter issued by Energy Safety on 6/20/24.
 PG&E
143637/5/2024PG&E’s 2023-2025 Wildfire Mitigation Plan Revision 6
PG&E is submitting its redline and clean updated 2023-2025 Base WMP. This version includes approved changes from its 2024 Change Order request, reportable updates requested in the 2025 WMP Update, and corrections and supplemental reportable updates per the letter issued by Energy Safety on 6/20/24.
 PG&E
143627/5/2024PG&E’s 2025 Wildfire Mitigation Plan Update Revision 1 – Redline Version
PG&E is submitting its redline and clean 2025 WMP Update document. This version includes changes made per the letter issued by Energy Safety on 6/20/2024.
 PG&E
143617/5/2024PG&E’s 2025 Wildfire Mitigation Plan Update Revision 1
PG&E is submitting its redline and clean 2025 WMP Update document. This version includes changes made per the letter issued by Energy Safety on 6/20/2024.
 PG&E
143577/5/20242024-07-05_SDGE_2023_WMP_R5_redacted_redline
SDG&E is submitting its redline and clean updated 2023-2025 Base WMP. This version includes approved changes from its 2024 Change Order request, reportable updates requested in the 2025 WMP Update, and corrections and supplemental reportable updates per the letter issued by Energy Safety on 6/20/24.
 San Diego Gas & Electric
143567/5/20242024-07-05_SDGE_2023_WMP_R5_redacted
SDG&E is submitting its redline and clean updated 2023-2025 Base WMP. This version includes approved changes from its 2024 Change Order request, reportable updates requested in the 2025 WMP Update, and corrections and supplemental reportable updates per the letter issued by Energy Safety on 6/20/24.
 San Diego Gas & Electric
143557/5/20242024-07-05_SDGE_2025_WMP-Update_R2_redline
SDG&E is submitting its redline and clean 2025 WMP Update document. This version includes changes made per the letter issued by Energy Safety on 6/20/2024.
 San Diego Gas & Electric
143547/5/20242024-07-05_SDGE_2025_WMP-Update_R2
SDG&E is submitting its redline and clean 2025 WMP Update document. This version includes changes made per the letter issued by Energy Safety on 6/20/2024.
 San Diego Gas & Electric
143537/5/20242024-07-05_SDGE_2025_WMP-Update_R2_Cover_Letter
SDG&E is submitting its redline and clean 2025 WMP Update document. This version includes changes made per the letter issued by Energy Safety on 6/20/2024.
 San Diego Gas & Electric
143367/1/2024Decision on Liberty Change Order Request
Energy Safety's Decision on Liberty's May 28, 2024, Change Order Request
 Office of Energy Infrastructure Safety
142766/21/2024Approval for BVES Request to Amend 2024 Maturity Survey Questions
Energy Safety's response to BVES's request to its amend 2024 Maturity Survey missing responses
 Office of Energy Infrastructure Safety
142746/21/2024Revised Schedule for Group 1 Electrical Corporation 2025 WMP Updates
Revised Schedule for Group 1 Electrical Corporations’ 2025 Wildfire Mitigation Plan Updates.
3 page(s)
 Office of Energy Infrastructure Safety
142606/20/2024Notice on SDG&E Errata and Supplemental Reportable Updates
This notice to SDG&E includes a list of non-substantive errors for SDG&E to correct in its 2025 WMP Update and revised 2023-2025 WMP and mitigation iniatives for which SDG&E may submit supplemental reportable updates for 2025. SDG&E must respond by July 5, 2024.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
142596/20/2024Notice on PG&E Errata and Supplemental Reportable Updates
This notice to PG&E includes a list of non-substantive errors for PG&E to correct in its 2025 WMP Update and revised 2023-2025 WMP and mitigation iniatives for which PG&E may submit supplemental reportable updates for 2025. PG&E must respond by July 5, 2024.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
142496/17/2024BVES 2024 Maturity Survey Amendment Request
Deputy Director Shannon O'RourkeBear Valley Electric Service, Inc.
142486/17/2024Submission Timeframes for Change Order Requests
Submission timeframes for 2024 and 2025 Change Order requests
 Office of Energy Safety Infrastructure
141936/7/20242024-06-07_SDGE_2023_WMP_R2.1 (REDACTED VERSION)
SDG&E is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 San Diego Gas & Electric
141926/7/20242024-06-07_SDGE_2023_WMP_R2.1 Confidentiality Declaration
SDG&E is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 San Diego Gas & Electric
141906/7/20242023-2025 Wildfire Mitigation Plan R4-1 (REDACTED VERSION)
PG&E is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 PG&E
141896/7/2024OEIS Confidentiality Declaration R4-1
 PG&E
141706/4/20242024-06-04_SCE_2023_WMP_R1.1
SCE is submitting its clean updated 2023-2025 Base WMP to include approved changes from its 2024 Change Order request. No other changes have been made.
 Southern California Edison
141525/31/2024Decision on PG&E Change Order Request
Energy Safety's decision on PG&E's January 8, 2024, Change Order Request
 Office of Energy Infrastructure Safety
141515/31/2024Decision on SDG&E Change Order Request
Energy Safety's decision on SDG&E's November 1, 2023, Change Order Request
 Office of Energy Infrastructure Safety
141505/31/2024Decision on SCE Change Order Request
Energy Safety's decision on SCE's November 1, 2023, Change Order Request
 Office of Energy Infrastructure Safety
14142-15/29/20242024-05-29_BVES_2025_WMP-Update_R1
 Bear Valley Electric Service, Inc.
14142-25/29/20242024-05-29_BVES_2025_WMP_R1
 Bear Valley Electric Service, Inc.
14142-35/29/20242024-05-29_BVES_2025_WMP_R1_Redline
 Bear Valley Electric Service, Inc.
141305/28/2024Liberty 2024 WMP Update Change Order Report_05282024
 Liberty Utilities
141135/21/2024Request to Correct Information Provided in PG&E’s 2024 Change Order
 PG&E
141125/21/2024SCE Reply Comments 2025 WMP Update
 Southern California Edison
141115/21/2024PG&E's 2025 Wildfire Mitigation Plan Update Reply Comments
 PG&E
141105/21/2024SDGE_ReplyComments_SDGE_2025_WMP_Update_R0
WMP Update reply comments
 San Diego Gas & Electric
141015/20/2024BVES Response to Stakeholder Comments on 2025 WMP Update
WMP Update Reply Comments
Caroline Thomas Jacobs, DirectorBear Valley Electric Service, Inc.
140915/17/20242025 WMP Update Reply Comments Extended to 5/21/24
Group 1 WMP Update reply comment deadline has been extended from May 17, 2024, to May 21, 2024.
 Office of Energy Infrastructure Safety
140865/14/2024SDG&E 2023-2025 Base WMP R4 Redlined_Non-Substantive Errata
Redacted version
 San Diego Gas & Electric
140855/14/2024SDG&E 2023-2025 Base WMP R4 (Clean Updated)_Non-Substantive Errata
Redacted version
 San Diego Gas & Electric
140845/14/2024SDG&E 2025 WMP Update Non-substantive Errata Confidentiality Declaration
 San Diego Gas & Electric
140835/14/2024SCE 2025 WMP Update Errata (May 14, 2024)
 Southern California Edison
140825/14/2024SDG&E's 2025 Wildfire Mitigation Plan Update Non-Substantive Errata
 San Diego Gas & Electric
140815/14/2024SDG&E's 2025 Wildfire Mitigation Plan Update Non-Substantive Errata Cover Letter
 San Diego Gas & Electric
140805/14/2024PG&E’s 2025 Wildfire Mitigation Plan Update Non-Substantive Errata
 PG&E
140785/14/2024Rejection and Order to Resubmit for BVES 2025 WMP Update
Rejection and Order to Resubmit for Bear Valley Electric Service Inc 2025 WMP Update. BVES resubmit due by May 29, 2024.
 Office of Energy Infrastructure Safety
140335/7/2024Group 1 WMP Workshop Recording and Slides
Notice of Group 1 April 25, 2024, WMP Workshop recording link and associated slides
Electrical Infrastructure
 Office of Energy Infrastructure Safety
140325/7/2024Comments on the Group 1 2025 WMP Updates
 Green Power Institute
140315/7/2024Public Advocates Comments on SCE 2025 WMP Update
Comments of the Public Advocates Office on SCE’s 2025 Wildfire Mitigation Plan Update
 California Public Utilities Commission
140295/7/2024Public Advocates Office Comments on PGEs 2025 WMP Update
 California Public Utilities Commission
140245/7/2024Public Advocates Office Comments on SDGE 2025 WMP Update
 California Public Utilities Commission
140235/7/2024Public Advocates Office Comments on BVES 2025 WMP
 California Public Utilities Commission
140185/7/2024Opening Comments of the Rural County Representatives of California on Group 1 2025 Wildfire Mitigation Plan Updates
Comments from RCRC pertaining to the 2025 Wildfire Mitigation Plan Updates of PG&E and Southern California Edison, dated April 2, 2024.
Electrical Infrastructure
Caroline Thomas JacobsRural County Representatives of California
140175/7/2024MUSSEY GRADE ROAD ALLIANCE COMMENTS ON THE 2025 UPDATE OF THE WILDFIRE MITIGATION PLANS OF PG&E, SCE, AND SDG&E
 Mussey Grade Road Alliance
140095/6/2024CDFW Comments on BVES's 2025 WMP Update
 California Department of Fish and Wildlife
140085/6/2024CDFW Comments on PG&E's 2025 WMP Update
 California Department of Fish and Wildlife
140075/6/2024CDFW Comments on SCE's 2025 WMP Update
 California Department of Fish and Wildlife
140065/6/2024CDFW Comments on SDG&E's 2025 WMP Update
 California Department of Fish and Wildlife
139014/16/20242024-04-16_SCE_2025_WMP_Errata
Submission is SCE's errata to Table 3-1, Table 8-15, and Figure 7-1 to address errors identified and corresponding redline.
 Southern California Edison
138984/15/2024Notice of 2025 WMP Update Workshop - Group 1
The Office of Energy Infrastructure Safety will hold a virtual public workshop on April 25, 2024, on the 2025 Wildfire Mitigation Plan Updates from PG&E, SCE, SDG&E, and Bear Valley (“Group 1”).
 Office of Energy Infrastructure Safety
138814/11/20242023-2025 WMPs SCE 2023 WMP R2 - Redline
SCE is resubmitting its redlined 2023-2025 Base WMP, which was initially submitted on April 2, 2024, to include pages that do not have redlines.
 Southern California Edison
138784/9/2024SDG&E 2023-2025 Base WMP Redlined
SDG&E is resubmitting it's redlined 2023-2025 Base WMP, which was initially submitted on April 2, 2024, to include all the appendices that were not previously included and correct certain erroneous confidentiality/redacted markings.
 San Diego Gas & Electric
138774/9/2024SDG&E 2023-2025 Base WMP (Clean Updated)
SDG&E is resubmitting it's clean updated 2023-2025 Base WMP, which was initially submitted on April 2, 2024, to correct certain erroneous confidentiality/redacted markings.
 San Diego Gas & Electric
138764/11/2024SDG&E 2025 WMP Update Confidentiality Declaration
SDG&E is resubmitting it's confidential redlined and clean updated 2023-2025 Base WMP, which was initially submitted on April 2, 2024, to include all the appendices that were not previously included and correct certain erroneous confidentiality/redacted markings.
 San Diego Gas & Electric
138604/5/20242024-04-02_BVES_2025_WMP_R0
BVES is resubmitting its 2023-2025 WMP to include the appendices. No other content changes since the April 2 submission.
 Bear Valley Electric Service, Inc.
138594/5/20242024-04-02_BVES_2025_WMP_R0_Redline
BVES is resubmitting its 2023-2025 WMP to include the appendices. No other content changes since the April 2 submission.
 Bear Valley Electric Service, Inc.
138514/4/2024SDG&E 2025 Wildfire Mitigation Plan Update
SDG&E is resubmitting its 2025 WMP due to PDF errors identified in which the letter combination “ti” is changed to a symbol when copy and pasted. No other changes have been made to what was submitted on April 2.
 San Diego Gas & Electric
138284/2/20242025 WMP Update ACI SCE-23-18 calibration tracker
 Southern California Edison
138274/2/20242025 WMP Update ACI SCE-23-15 Fast Curve Outages 2023
 Southern California Edison
138264/2/20242025 WMP Update ACI SCE-23-10 splice findings
 Southern California Edison
138254/2/20242025 WMP Update ACI SCE-23-09 Item 2
 Southern California Edison
138244/2/20242025 WMP Update ACI SCE-23-09 IWMS
 Southern California Edison
138234/2/20242025 WMP Update ACI SCE-23-08 location list
 Southern California Edison
138224/2/20242025 WMP Update Chapter 1 Tables 1-1 and 1-2
 Southern California Edison
138214/2/20242024-04-02_SCE_2023_WMP_R2- Redline
 Southern California Edison
138204/2/20242024-04-02_SCE_2023_WMP_R2- Clean
 Southern California Edison
138194/2/20242024-04-02_SCE_2025_WMP-Update_R0
 Southern California Edison
138184/2/2024SCE 2025 WMP Update Cover Letter
 Southern California Edison
138174/2/2024SDG&E 2025 WMP Update Confidentiality Declaration
 San Diego Gas & Electric
138164/2/2024SDG&E 2023-2025 Base WMP R3 Redlined
 San Diego Gas & Electric
138154/2/2024SDG&E 2023-2025 Base WMP R3 (Clean Updated)
 San Diego Gas & Electric
138144/2/2024SDG&E 2025 Wildfire Mitigation Plan Update
 San Diego Gas & Electric
138134/2/2024SDG&E 2025 WMP Update Cover Letter
 San Diego Gas & Electric
138124/2/2024DRU11407.002_OEIS Confidentiality Declaration R5
 PG&E
138114/2/2024DRU13121_OEIS Confidentiality Declaration
For confidential attachments respective to PG&E's 2025 WMP Update.
 PG&E
138104/2/20242024-04-02_PGE_2025_WMP-Update_R0_ACI-23-26_Atch01_Redacted.xlsx
 PG&E
138094/2/20242024-04-02_PGE_2025_WMP-Update_R0_ACI-23-20_Atch01_Redacted.pdf
 PG&E
138084/2/20242024-04-02_PGE_2025_WMP-Update_R0_ACI-23-15_Atch01.pdf
 PG&E
138074/2/20242024-04-02_PGE_2025_WMP-Update_R0_ACI-23-07_Atch02.xlsx
 PG&E
138064/2/20242024-04-02_PGE_2025_WMP-Update_R0_ACI-23-07_Atch01.xlsx
 PG&E
138054/2/2024PG&E's 2023-2025 Wildfire Mitigation Plan Revision 5 - Redlined
 PG&E
138044/2/2024PG&E's 2023-2025 Wildfire Mitigation Plan Revision 5
Clean/public.
 PG&E
138034/2/2024PG&E's 2025 Wildfire Mitigation Plan Update
 PG&E
138024/1/20242025 Update Attachment to BVES-23-15 BVES 2023 Outage Log
 Bear Valley Electric Service, Inc.
138014/1/2024Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan - Redline
 Bear Valley Electric Service, Inc.
138004/1/2024Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan
Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan - 2025 Revision 0
 Bear Valley Electric Service, Inc.
137994/1/2024Bear Valley Electric Service 2025 Wildfire Mitigation Plan Update
 Bear Valley Electric Service, Inc.
137392/22/20242023-2025 Wildfire Mitigation Plan Submission Cover Letter
 PacifiCorp
137382/22/20242023-2025 Wildfire Mitigation Plan
PacifiCorp submits this final version of its 2023-2025 Wildfire Mitigation Plan to the ‘2023- 2025-WMP docket which includes its previously submitted errata, changes resulting from the Revision Notice, as well as the corrections for the errata listed in Appendix A of Energy Safety’s letter dated February 12, 2024.
 PacifiCorp
137362/22/20242025 WMP Updated Letter and Schedule
2025 WMP update of schedule originally posted on January 26, 2024.
Electrical Infrastructure
2 page(s)
 Office of Energy Infrastructure Safety
137302/15/2024Liberty Application_Confidential Treatment of 2023-2025 WMP
 Liberty Utilities
137292/15/20242024-02-15_Liberty_2023_WMP_R3
This version of Liberty's 2023 WMP is submitted in accordance with Section 4.2 of the WMP Process Guidelines and Energy Safety’s Non-Substantive Errata Request.
 Liberty Utilities
137282/16/2024PG&E's GM-07 2024 WMP EPSS Cover Letter and Supporting Narrative
 PG&E
137252/15/2024GM-07 2024 Supporting Narrative
 PG&E
137242/15/2024GM-07 2024 WMP EPSS Reliability Dataset
 PG&E
137232/15/2024PG&E's Cover Letter ACI 22-32
 PG&E
137222/15/2024LSPGC_2023_WMP_Errata
 LS Power - California
137212/15/2024LSPGC_2023-20205 Base WMP R1
LS Power 2023-2025 approved WMP is identical to that submitted on 10/18/23.
 LS Power - California
137202/15/2024LSPGC_2023-2025_WMP_R1_Cover_Letter
 LS Power - California
137172/14/2024Request for LSP Final WMP
 Office of Energy Infrastructure Safety
137122/12/2024Request for PacifiCorp Final 2023-2025 WMP
Energy Safety's request for PacifiCorp's Final 2023-2025 WMP.
 Office of Energy Infrastructure Safety
137112/12/2024PacifiCorp 2023-2025 Base WMP Decision
Energy Safety's Decision on PacifiCorp's 2023-2025 Wildfire Mitigation Plan.
 Office of Energy Infrastructure Safety
137082/9/2024Revised 2023-2025 Maturity Survey
Revised 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey adopted January 31, 2024; and cover letter explaining corrections.
 Office of Energy Infrastructure Safety
136832/5/2024Non-Substantive Request for Liberty 2023-2025 WMP
Energy Safety request for non-substantive errata for Liberty Utilities' 2023-2025 WMP.
 Office of Energy Infrastructure Safety
136782/5/2024Liberty 2023-2025 WMP Decision
Energy Safety's decision on Liberty Utilities' 2023-2025 Wildfire Mitigation Plan
 Office of Energy Infrastructure Safety
136672/2/20242025 WMP Update Guidelines Adoption Meeting Recording and Slides
Recording link and slide deck from January 31, 2024, adoption meeting for 2025 Wildfire Mitigation Plan Update Guidelines documents.
 Office of Energy Infrastructure Safety
136582/1/2024Revised 2023-2025 Maturity Model
Revised 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Model adopted January 31, 2024.
 Office of Energy Infrastructure Safety
136572/1/2024Revised 2023-2025 WMP Process Guidelines
Revised 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines adopted January 31, 2024.
 Office of Energy Infrastructure Safety
136562/1/20242025 WMP Update Guidelines
2025 Wildfire Mitigation Plan Update Guidelines adopted January 31, 2024.
 Office of Energy Infrastructure Safety
136552/1/2024FInal 2025 Update Guidelines Cover Letter
Cover letter for final 2025 Wildfire Mitigation Plan Guidelines documents. The final documents were adopted at the January 31, 2024, adoption meeting.
 Office of Energy Infrastructure Safety
136311/30/2024LS Power Grid 2023-2025 WMP Decision and Cover Letter
Energy Safety's Decision on LS Power Grid California's 2023-2025 WMP with cover letter and appendices
Electrical Infrastructure
 Office of Energy Infrastructure Safety
136301/30/2024Horizon West Transmission 2023-2025 WMP Decision and Cover Letter
Energy Safety's Decision on Horizon West Transmission 2023-2025 WMP with cover letter and appendices
Electrical Infrastructure
 Office of Energy Infrastructure Safety
136291/30/2024Trans Bay Cable 2023-2025 WMP Decision and Cover Letter
Energy Safety's Decision on Trans Bay Cable's 2023-2025 WMP with cover letter and appendices
Electrical Infrastructure
 Office of Energy Infrastructure Safety
136281/30/2024Proposed Final Revisions to 2023-2025 Maturity Model and Survey
The proposed final is set to be considered for adoption at the January 31, 2024, adoption meeting.
 Office of Energy Infrastructure Safety
136271/30/2024Proposed Final Revisions to 2023-2025 WMP Process Guidelines
The proposed final is set to be considered for adoption at the January 31, 2024, adoption meeting.
 Office of Energy Infrastructure Safety
136261/30/2024Proposed Final 2025 WMP Update Guidelines
The proposed final is set to be considered for adoption at the January 31, 2024, adoption meeting.
 Office of Energy Infrastructure Safety
136151/26/20242025 WMP Update Schedule
Schedule for 2025 Wildfire Mitigation Plan Updates
 Office of Energy Infrastructure Safety
135911/21/2024GPI Comments on Draft Decision on Liberty WMP
 Green Power Institute
135901/22/2024MGRA Comments on 2025 Guideline Revision
 Mussey Grade Road Alliance
135891/22/2024Joint Utility Comments on Draft Revisions to 2025 WMP Updates
 San Diego Gas & Electric
135881/22/2024Public Advocates Office Comments on 2025 WMP Updates
 California Public Utilities Commission
135851/21/2024GPI Comments on Draft Revisions to the 2025 WMP Updates
 Green Power Institute
135801/19/2024Notice of 2025 WMP Update Guidelines Adoption Meeting
Energy Safety will hold a public meeting on January 31, 2024 , to consider adoption of the 2025 Wildfire Mitigation Plan Update Guidelines and associated revised 2023-2025 WMP documents.
 Office of Energy Infrastructure Safety
135691/17/2024GPI Comments on Draft Decision on PacifiCorp WMP
The Green Power Institute (GPI), the renewable energy program of the Pacific Institute for Studies in Development, Environment, and Security, provides these Comments of the Green Power Institute on the Draft Decision on PacifiCorp’s Wildfire Mitigation Plan.
 Green Power Institute
135611/8/2024DRU11407.002_OEIS Confidentiality Declaration R4
 PG&E
135581/11/20242024_01_11_Liberty_Comments_2023 WMP-Liberty Draft Decision
 Liberty Utilities
135551/8/2024PG&E's 2023-2025 WMP Change Order Attachment A
 PG&E
135541/8/2024PG&E's 2023-2025 WMP Change Order
 PG&E
135531/8/2024PG&E's 2023-2025 Wildfire Mitigation Plan R4 Cover Letter
 PG&E
135521/8/2024PG&E's 2023-2025 Wildfire Mitigation Plan R4 Redline Version
 PG&E
135511/8/2024PG&E's 2023-2025 Wildfire Mitigation Plan R4
 PG&E
1354012/29/2023PG&E's 2023 WMP Decision with cover letter
Energy Safety's Decision on PG&E's 2023 - 2025 WMP
Electrical Infrastructure
196 page(s)
 Office of Energy Infrastructure Safety
1353512/28/2023PacifiCorp 2023 WMP Draft Decision with cover letter
Energy Safety's Draft Decision on PacifiCorp’s 2023-2025 WMP. Opening comments due January 17, 2024, and reply comments due January 29, 2023.
 Office of Energy Infrastructure Safety
1349612/22/20232023 WMP Liberty Draft Decision
Energy Safety's Draft Decision on Liberty Utilities' 2023-2025 WMP. Opening comments due January 11, 2024, and reply comments due January 22, 2023.
 Office of Energy Infrastructure Safety
1349412/22/2023Energy Safety's Response to the WSAB's 2023 Recs for WMP Guidelines and SCA Process
Office of Energy Infrastructure Safety’s response to the Wildfire Safety Advisory Board’s June 13, 2023, recommendations for the Wildfire Mitigation Plan Guidelines and Safety Culture Assessment process.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1349212/22/2023Draft Revisions to 2023-2025 Process Guidelines, Maturity Model, and Maturity Survey
Draft revisions to the 2023-2025 Process Guidelines, 2023-2025 Maturity Model, and 2023-2025 Maturity Survey. Comments on the draft revisions will be accepted through January 22, 2024.
 Office of Energy Infrastructure Safety
13485-112/19/20232023-12-19_SDGE_2023_Change Order Report_R1
 San Diego Gas & Electric
13485-212/19/20232023-12-19_SDGE_2023_Change Order Report_R1_Attachment A
 San Diego Gas & Electric
1347612/14/2023Energy Safety Response to SDG&E's Request to Resubmit its Change Order Request
This is a letter approving SDG&E’s request to revise and resubmit its November 1, 2023, Change Order Request by December 19, 2023. Stakeholder comments on SDG&E’s revised Change Order Request must be submitted within 20 days of the date SDG&E submits the revised Change Order Request.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1347512/14/2023Reply Comments on the Draft Decision Approving Pacific Gas and Electric Company’s 2023-2025 Wildfire Mitigation Plan
 PG&E
1347412/14/2023Public Advocates Office Reply Comments on PGE 2023-2025 WMP
 California Public Utilities Commission
1347312/14/2023MGRA Reply Comments re PG&E Draft Decision
 Mussey Grade Road Alliance
1345412/8/2023TBC 2023 WMP Draft Decision with cover letter
Energy Safety's Draft Decision of TBC's 2023-2025 Wildfire Mitigation Plan with cover letter and appendices.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1345312/8/2023HWT 2023 WMP Draft Decision with cover letter
Energy Safety's Draft Decision of HWT 2023-2025 Wildfire Mitigation Plan with cover letter and appendices.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1345212/8/2023LS Power 2023 WMP Draft Decision with cover letter
Energy Safety's Draft Decision on LS Power's 2023-2025 Wildfire Mitigation Plan with cover letter and appendices.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1343712/6/20232023.12.06_Joint IOU Comments on Draft 2025 WMP Update Guidelines
 Southern California Edison
1343612/6/20232023 12-06 Public Advocates Office Comments on Draft 2025 WMP Update Guidelines
 California Public Utilities Commission
1343112/4/20232023_12_04_Shasta County DA Stephanie A. Bridgett OpeningComments OEIS PG&E WMP Draft Decision
A letter from the Shasta County District Attorney, Stephanie A. Bridgett, expressing personal and community concerns regarding the Draft Decision for PG&E's 2023-2025 WMP.
Electrical Infrastructure
2 page(s)
Shannon O'Rourke, Deputy DirectorShasta County District Attorney
1343012/4/20232023_12_04_Public Advocates Office OpeningComments OEIS PG&E WMP Draft Decision
 California Public Utilities Commission
1342912/4/20232023_12_04_The Utility Reform Network OpeningComments OEIS PG&E WMP Draft Decision
 The Utility Reform Network
1342812/4/20232023_12_04_PG&E OpeningComments OEIS PG&E WMP Draft Decision
 PG&E
1342712/4/20232023_12_04_Mussey Grade Road Alliance OpeningComments OEIS PG&E WMP Draft Decision
 Mussey Grade Road Alliance
1342512/4/20232025 WMP Update Guidelines Workshop Recording and Slides
Recording link and slide deck from November 15, 2023, workshop on Draft 2025 WMP Update Guidelines
 Office of Energy Infrastructure Safety
1338611/16/2023BVES 2023-2025 R2 WMP
In accordance with the Office of Energy Infrastructure Safety’s 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines, specifically Section 4.3, Bear Valley Electric Service, Inc. hereby submits an updated version of its 2023-2025 Wildfire Mitigation Plan following Energy Safety's approval of Bear Valley's WMP on 11/6/23.
 Bear Valley Electric Service, Inc.
1338511/16/2023BVES 2023-2025 R2 WMP Non-Substantive Cover Letter
In accordance with the Office of Energy Infrastructure Safety’s 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines, specifically Section 4.3, Bear Valley Electric Service, Inc. hereby submits an updated version of its 2023-2025 Wildfire Mitigation Plan following Energy Safety's approval of Bear Valley's WMP on 11/6/23.
 Bear Valley Electric Service, Inc.
1337411/13/2023PG&E's 2023 WMP Draft Decision with cover letter
Energy Safety's Draft Decision on PG&E's 2023-2025 Base WMP
Electrical Infrastructure
195 page(s)
 Office of Energy Infrastructure Safety
1337211/9/2023PGE_WMP DR-Summary_20231109.pdf
 PG&E
1335511/2/2023Liberty Application_Confidential Treatment of 2023-2025 WMP
 Liberty Utilities
1335211/6/2023Bear Valley 2023-2025 Wildfire Mitigation Plan Decision and Cover Letter
Office of Energy Infrastructure Safety's Decision and Cover Letter approving BVES's 2023-2025 WMP
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1331911/2/20232023_11_2_Liberty_Reply Comments_2023-2025 WMP_R2
 Liberty Utilities
1329811/1/20232024 WMP Target Updates (Nov 1, 2023)
Pursuant to the 2023-2025 WMP Process and Evaluation Guidelines, SCE respectfully submits updates to its 2024 WMP program targets. SCE does not have any changes to 2023 targets or to performance metric forecasts.
 Southern California Edison
1329511/1/20232023-11-01_SDGE_2023_Change Order Report_R0_Attachment A
 San Diego Gas & Electric
1329411/1/20232023-11-01_SDGE_2023_Change Order Report_R0
Energy Safety issued a final decision approving SDG&E’s 2023-2025 Base WMP on October 13, 2023. SDG&E provides the following updates that meet the change order requirements.
 San Diego Gas & Electric
1329010/30/2023Draft 2025 WMP Update Guidelines
Draft 2025 Wildfire Mitigation Plan Update Guidelines. A virtual public workshop will be held on November 15, 2023. Comments on the draft will be accepted through December 6, 2023.
 Office of Energy Infrastructure Safety
1328010/27/2023Public Advocates Office Comments on PacifiCorp Revision Notice Response
 Public Utilities Commission
1327910/27/2023GPI Comments on PacifiCorp Revision Notice Response
 Green Power Institute
1327310/26/20232023-10-26_SCE_2023_WMP_R1
Pursuant to Section 4.3 of the 2023-2025 WMP Process and Evaluation Guidelines, SCE is submitting an updated version of its 2023-2025 Wildfire Mitigation Plan. This version reflects errata and corrections.
 Southern California Edison
1326710/23/2023SDGE_Application_for_Confidential_Treatment_of_WMP_Errata
 San Diego Gas & Electric
1326610/25/20232023-2025 SDGE WMP R2 with Attachments_Errata_10-23-23
 San Diego Gas & Electric
1326510/23/2023SDGE_2023-2025_WMP_R2_Cover Letter and Non-Substantive_Errata_10-23-23
In accordance with Energy Safety Process Guidelines, SDG&E hereby submits a final version of its 2023-2025 WMP that includes all previously submitted errata.
 San Diego Gas & Electric
1326410/24/2023SCE 2023-2025 WMP Decision and Cover Letter
Office of Energy Infrastructure Safety’s Decision approving Southern California Edison Company’s 2023-2025 Wildfire Mitigation Plan.
 Office of Energy Safety Infrastructure
1326310/23/2023Public Advocates Office Comments to Liberty Revision Notice Response
The Public Advocates Office submits comments on the revised 2023-2025 Wildfire Mitigation Plan of Liberty Utilities.
 California Public Utilities Commission
1326210/23/2023GPI Comments on Liberty Revision Notice Response
Comments of the Green Power Institute on the Liberty 2023 Wildfire Mitigation Plan Final Revision Notice Responses.
 Green Power Institute
1325910/23/2023BVES Reply Comments 2023-2025 WMP Draft Decision

1 page(s)
 Bear Valley Electric Service, Inc.
1325110/20/2023PG&E's 2023 WMP Supplemental Revision Notice Response to Comments
 PG&E
1324210/18/20232023-10-18_LSPGC_2023-2025 Base WMP R1
LSPGC WMP Revision 1
 LS Power
1324110/17/2023LSPGC WMP Errata
LSPGCA submits updates to section 9.1.2 and 9.2 of our WMP per the substantive errata request received on October 4, 2023.
 LS Power
1319410/13/2023Public Advocates Office Opening Comments on PG&E 2023 WMP SRNR
 California Public Utilities Commission
1319310/13/2023MGRA Modification of PGE_2305_SRNR_R0_Atch02
 Mussey Grade Road Alliance
1319210/13/2023Mussey Grade Road Alliance Comments on 2023-2025 Wildfire Mitigation Plan R3 of PG&E and Associated Files
 Mussey Grade Road Alliance
1319110/13/2023Comments Of The Utility Reform Network On PG&E’s 2023-2025 WMP Supplemental Response To Revision Notice
 The Utility Reform Network
1319010/13/2023GPI Comments on PG&E Supplemental Revision Notice Response
 Green Power Institute
1318910/13/2023SDG&E 2023-2025 WMP Decision and Cover Letter
This is Energy Safety’s Decision approving the 2023-2025 Wildfire Mitigation Plan (WMP) of San Diego Gas & Electric Company (SDG&E).
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1318810/13/2023Joint Comments on PG&E WMP R3

Electrical Infrastructure
4 page(s)
Caroline Thomas Jacobs, DirectorWilliam Abrams, et. al.
1318110/12/2023PacifiCorp’s Revised 2023- 2025 Base WMP – Redline
 PacifiCorp
1318010/12/2023PacifiCorp’s Revised 2023-2025 Base WMP – Clean
 PacifiCorp
1317910/12/2023Revised 2023 WMP Submission Cover Letter
 PacifiCorp
1317810/12/2023Revision Notice Response
 PacifiCorp
1317510/10/2023GPI Comments on Draft Decision of BVES WMP
 Green Power Institute
1317410/6/2023Liberty Application for Confidential Treatment of 2023-2025 WMP
 Liberty Utilities
13173-110/6/20232023-10-06_Liberty_Cover Letter_2023_WMP_R2
 Liberty Utilities
13173-210/6/20232023-10-06_Liberty_2023_WMP_R2
 Liberty Utilities
13173-310/6/20232023-10-06_Liberty_2023_WMP_R2_Redlined
 Liberty Utilities
1317210/6/2023PG&E Supplemental Response to Revision Notice Comment Period Extension
Energy Safety extending the opening and reply comment period for PG&E's supplemental response to revision notice.
Electrical Infrastructure
1 page(s)
 Office of Energy Infrastructure Safety
1316910/6/20232023 - 2025 BVES WMP Non-Substantive Errata Request
Office of Energy Infrastructure Safety Non-Substantive Errata Request for Bear Valley Electric Service Company, Inc.’s 2023-2025 Wildfire Mitigation Plan
 Office of Energy Infrastructure Safety
1316110/5/2023Request for Extension to Respond to PG&E 2023-2025 WMP Supplemental Response to the Revision Notice
 The Utility Reform Network
1316010/4/20232023 WMP LS Power Substantive Errata Request
Energy Safety requests that LS Power address substantive errata
Electrical Infrastructure
1 page(s)
LS PowerOffice of Energy Infrastructure Safety
131589/29/20232023-09-29 SCE Reply Comments 2023 2025WMP Draft Decision
 Southern California Edison
131579/29/2023SDGE_Reply Comments_on_Draft_Decision_on_SDGE_2023-2025_WMP
 San Diego Gas & Electric
131549/29/2023Reply Comments Of The Utility Reform Network On The Draft Decision On Southern California Edison Company’s 2023-2025 WMP
 The Utility Reform Network
131539/29/2023Reply Comments Of The Utility Reform Network On The Draft Decision On San Diego Gas And Electric Company’s 2023-2025 WMP
 The Utility Reform Network
131249/29/2023MGRA Reply Comments on SCE and SDG&E Draft Decisions
 Mussey Grade Road Alliance
130679/28/2023Energy Safety Non-Substantive Errata Request for SCE 2023-2025 WMP

Electrical Infrastructure
 Office of Energy Infrastructure Safety
130549/27/2023PG&E’s 2023-2025 Wildfire Mitigation Plan R3 - Redline
 PG&E
130539/27/2023PG&E’s 2023-2025 Wildfire Mitigation Plan R3
 PG&E
130529/27/20232023-09-27_PGE_23-05_SRNR_R0_Atch03_Redacted.xlsx
 PG&E
130519/27/20232023-09-27_PGE_23-05_SRNR_R0_Atch02.xlsx
 PG&E
130509/27/20232023-09-27_PGE_23-05_SRNR_R0_Atch01_Redacted.xlsx
 PG&E
130499/27/20232023-09-27_PGE_23_SRNR_R1_Tables 1-47
 PG&E
130489/27/2023PG&E’s 2023-2025 Wildfire Mitigation Plan Supplemental Response to Revision Notice - Redline
 PG&E
130479/27/2023PG&E’s 2023-2025 Wildfire Mitigation Plan Supplemental Response to Revision Notice
 PG&E
130469/27/2023Confidentiality Declaration for PG&E's WMP R3 and SRNR Attachments
Confidentiality Declaration for 2023-09-27_PGE_23-05_SRNR_R0_Atch01_CONF.xlsx and 2023-09-27_PGE_23-05_SRNR_R0_Atch03_CONF.xlsx.
 PG&E
130459/27/2023Confidentiality Declaration for PG&E's Wildfire Mitigation Plan Revision 3
Confidentiality Declaration for 2023-09-27_PGE_23_WMP_R3_CONF.pdf and 2023-09-27_PGE_23_WMP_R3_Redline_CONF.pdf.
 PG&E
130379/21/20232023 WMP Bear Valley Electric Service Draft Decision with cover letter

Electrical Infrastructure
 Office of Energy Infrastructure Safety
130259/19/2023Public Advocates Office Comments on Draft Decision SCE 2023-2025 WMP
 California Public Utilities Commission
130249/19/2023Public Advocates Office Comments on Draft Decision SDGE 2023-2025 WMP
 California Public Utilities Commission
130239/19/2023GPI Comments on Decision on SCE and SDG&E 2023-2025 WMPs
 Green Power Institute
130229/19/2023SCE_Comments_on_OEIS_Draft_Decision_on_SCE_2023_2025WMP
 Southern California Edison
130219/19/2023SDGE_Comments_on_OEIS_Draft_Decision_on_SDGE_2023-2025_WMP
 San Diego Gas & Electric
130209/19/2023Opening Comments Of The Utility Reform Network On The Draft Decision On SCE’s 2023-2025 WMP
 The Utility Reform Network
130199/19/2023Opening Comments Of The Utility Reform Network On The Draft Decision On SDG&E’s 2023-2025 WMP
 The Utility Reform Network
130189/19/2023MGRA APPENDIX A - WMP 2023-2025 - TAIL RISK WHITEPAPER
 Mussey Grade Road Alliance
130179/19/2023MUSSEY GRADE ROAD ALLIANCE COMMENTS ON OEIS DRAFT DECISIONS ON SCE AND SDG&E 2023-2025 WMPS
 Mussey Grade Road Alliance
130089/13/2023Corrected Energy Safety Response to PG&E’s Request for Supplemental Response to Revision Notice
Correction to decision dates published in September 12, 2023, Energy Safety Response letter. Corrections are shown in redline.
 Office of Energy Infrastructure Safety
130079/12/2023Energy Safety Response to PG&E’s Request for Supplemental Response to Revision Notice
Response to PG&E’s September 11, 2023, request to submit a supplemental response to Energy Safety’s Revision Notice. The request is approved. PG&E’s supplemental response is due September 27, 2023. Stakeholders may submit comments on PG&E’s supplemental response.
 Office of Energy Infrastructure Safety
129999/11/2023Pacific Gas and Electric Company’s Request to Supplement its 2023-2025 Wildfire Mitigation Plan Submission
 PG&E
129989/11/20232023 PacifiCorp Erratum
Letter indicating an erratum that PacifiCorp must correct in its 2023-2025 WMP.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
129979/11/20232023 PacifiCorp Revision Notice
Revision Notice for PacifiCorp’s 2023-2025 Wildfire Mitigation Plan. Response is due October 11, 2023. Opening comments on PacifiCorp’s Revision Notice Response due October 26, 2023, and reply comments due November 6, 2023.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
129819/6/20232023 Liberty Revision Notice
Revision Notice for Liberty Utilities' 2023-2025 Wildfire Mitigation Plan. Response is due October 6, 2023.
 Office of Energy Infrastructure Safety
129769/1/20232023-09-01_PGE_2023_RNRReplyComments_R0
 PG&E
129658/30/20232023 SCE Draft Decision with cover letter
This is Energy Safety's Draft Decision on SCE's 2023-2025 WMP, submitted for public comment with opening comments due September 19, 2023, and reply comments due September 29, 2023.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
129648/30/20232023 SDG&E Draft Decision with cover letter
This is Energy Safety's Draft Decision on SDG&E's 2023-2025 WMP, submitted for public comment with opening comments due September 19, 2023, and reply comments due September 29, 2023.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
129428/22/20232023-08-22_BVES_WMP_Substantive Erratum.pdf
 Bear Valley Electric Service, Inc.
129418/22/2023Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan 2023 Revision 1 Redlined
 Bear Valley Electric Service, Inc.
129408/22/2023Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan 2023 Revision 1
 Bear Valley Electric Service, Inc.
129398/22/2023BVES Response to the Office of Energy Infrastructure Safety Issuance of Revision Notice for Bear Valley Electric Service Company
 Bear Valley Electric Service, Inc.
129388/20/20232023_08_20_So_OpeningComments_PGE_2023_RNR_R0 Attachment
 Brenda So
129378/20/20232023_08_20_So_OpeningComments_PGE_2023_RNR_R0
 Brenda So
129368/19/20232023_08_19_Curran Mechem Family_OpeningComments_PGE_2023_RNR_R0
 Curran Mechem Family
129358/20/20232023_08_20_Klinedinst_OpeningComments_PGE_2023_RNR_R0
Letter Responding to PG&E Final Revision
Electrical Infrastructure
2 page(s)
Melissa Semcer Deputy DirectorCharles Klinedinst
129348/21/20232023_08_21_Tonus_OpeningComments_PGE_2023_RNR_R0
 Susan Tonus
129338/21/20232023_08_21_Harman_OpeningComments_PGE_2023_RNR_R0
Document refutes PG&E's latest plan and calls for action from OEIS
Electrical Infrastructure
2 page(s)
OEISDouglas Harman
129328/22/20232023_08_22_Abrams_OpeningComments_PGE_2023_RNR_R0

Electrical Infrastructure
6 page(s)
 William Abrams
129318/22/20232023_08_22_Anonymous_OpeningComments_PGE_2023_RNR_R0
 Residence in Montclair
129308/22/20232023_08_22_Collins_OpeningComments_PGE_2023_RNR_R0
Public Comment
Electrical Infrastructure
3 page(s)
Office of Energy Infrastructure SafetyKevin Collins
129298/22/20232023_08_22_Holmes_OpeningComments_PGE_2023_RNR_R0
A comment on your proceeding
 Joseph Holmes
129288/22/20232023_08_22_Nichols_OpeningComments_PGE_2023_RNR_R0
 Elizabeth Nichols
129278/22/20232023_08_22_GPI_OpeningComments_PGE_2023_RNR_R0
 Green Power Institute
129268/22/20232023_08_22_TURN_OpeningComments_PGE_2023_RNR_R0
 The Utility Reform Network
129258/22/20232023_08_22_Joint CCA_OpeningComments_PGE_2023_RNR_R0
OPENING COMMENTS OF MARIN CLEAN ENERGY, SONOMA CLEAN POWER AUTHORITY, PIONEER COMMINITY ENERGY, AND EAST BAY COMMUNITY ENERGY ON PG&E’S 2023 WILDFIRE MITIGATION PLAN REVISION NOTICE RESPONSE
Electrical Infrastructure
 Law Office of David Peffer
129248/22/20232023_08_22_CalAdvocates_OpeningComments_PGE_2023_RNR_R0
 California Public Utilities Commission
129228/22/20232023_08_22_MGRA_OpeningComments_PGE_2023_RNR_R0
 Mussey Grade Road Alliance
129218/22/20232023_08_22_RCRC_OpeningComments_PGE_2023_RNR_R0
Comments on PG&E’s Revised 2023-2025 Wildfire Mitigation Plan submitted on August 7, 2023.
5 page(s)
Caroline Thomas JacobsRural County Representatives of California
129188/18/20232023_08_18_CalAdvocates Comments_2025WMPGuidelines
 California Public Utilities Commission
129168/18/20232023_08_18_Joint IOU Comments_2025WMPGuidelines
 Southern California Edison
129158/18/20232023_08_18_GPI_Comments_2025WMPGuidelines
 Green Power Institute
129128/17/20232023_08_17_Falk_OpeningComments_PGE_2023_RNR_R0
 Allison and Ryan Falk
129068/17/20232023_08_17_Cohen_OpeningComments_PGE_2023_RNR_R0
Request for undergrounding Oakland Hills
Electrical Infrastructure
1 page(s)
Office of Energy Infrastructure SafetyAndrew Cohen
129058/16/20232023_08_16_Bereny_OpeningComments_PGE_2023_RNR_R0
 Amanda Bereny
129028/14/20232023-08-14_SCE_2023_WMP_Errata
 Southern California Edison
128928/11/2023Revised 2023 PG&E Wildfire Mitigation Plan (WMP) Draft Decision Schedule

1 page(s)
 Office of Energy Infrastructure Safety
128788/8/20232023 BVES Revision Notice
Revision Notice for Bear Valley Electric Service Company’s 2023-2025 Wildfire Mitigation Plan. Response Due August 23, 2023
Electrical Infrastructure
 Office of Energy Infrastructure Safety
128778/8/2023BVES Erratum Letter August 2023
Letter indicating an erratum that BVES must correct in its 2023-2025 WMP
Electrical Infrastructure
 Office of Energy Infrastructure Safety
128678/7/20232023-08-07_PGE_23-07_RNR_R0_Atch01
 PG&E
128668/7/20232023-08-07_PGE_23-05_RNR_R0_Atch01
 PG&E
128658/7/20232023-08-07_PGE_23-04_RNR_R0_Atch01
 PG&E
128648/7/20232023-08-07_PGE_2023_RNR_R0
 PG&E
128638/7/20232023-08-07_PGE_2023_WMP_R2_Redlined
 PG&E
128628/7/20232023-08-07_PGE_2023_WMP_R2
 PG&E
128618/7/2023DRU11407.002_OEIS Confidentiality Declaration R2
 PG&E
128297/31/2023Climate Change Scoping Meeting Comment Solicitation, Meeting and Recording
Meeting slides and recording from July 25, 2023, Climate Change Scoping Meeting. Written comments are due on September 5, 2023.
 Office of Energy Infrastructure Safety
127877/20/20232025 WMP Update Guidelines Workshop Slides and Recording
Recording link and slides from July 19, 2023, workshop on the development of the 2025 Wildfire Mitigation Plan Update Guidelines.
 Office of Energy Infrastructure Safety
127867/20/2023Notice of Scoping Meeting: Climate Change and Fire Risk-Consequence Modeling
Updated Event Flyer and Agenda for the Climate Change Scoping Meeting
Electrical Infrastructure
 Office of Energy Infrastructure Safety
127477/13/2023Notice of Scoping Meeting: Climate Change and Fire Risk-Consequence Modeling
Scoping meeting on Climate Change on July 25, 2023
Electrical Infrastructure
 Office of Energy Infrastructure Safety
127267/10/20232023_07_10_Liberty_ReplyComments_2023-2025WMP_R0
 Liberty Utilities
127137/10/20232023 07-10 BVES ReplyComments 2023-2025WMP R0

15 page(s)
 Bear Valley Electric Service, Inc.
126746/29/20232023 06_29 GPI OpeningComments 2023_2025WMP R0
Comments on SMJU WMPs
 Green Power Institute
126736/29/20232023 06_29 Public Advocates Office OpeningComments Liberty 2023_2025WMP R0
 California Public Utilities Commission
126726/29/20232023 06_29 Public Advocates Office OpeningComments BVES 2023_2025WMP R0
 California Public Utilities
126716/29/20232023 06_29 Public Advocates Office OpeningComments PacifiCorp 2023_2025WMP R0
 California Public Utilities
126216/28/20232023_06_28_RCRC_OpeningComments_2023_2025WMP_R0
Opening Comments to SMJU Wildfire Mitigation Plans
2 page(s)
 Rural County Representatives of California
126086/23/2023Small WMP Workshop Slides
PowerPoint slides from the June 16, 2023, Small and Multi-Jurisdiction WMP Public Workshop.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
126076/23/2023Small WMP Workshop Recording Notice
Notice for the YouTube link for the June 16, 2023, Small and Multi-Jurisdiction WMP Public Workshop.
Electrical Infrastructure
1 page(s)
 Office of Energy Infrastructure Safety
126046/22/20232023_06_22_CDFW_OpeningComments_PacifiCorp_2023_2025WMP_R0

Electrical Infrastructure
 California Department of Fish and Wildlife
126036/22/20232023_06_22_CDFW_OpeningComments_Liberty_2023_2025WMP_R0

Electrical Infrastructure
 California Department of Fish and Wildlife
126026/22/20232023_06_22_CDFW_OpeningComments_BVES_2023_2025WMP_R0

Electrical Infrastructure
 California Department of Fish and Wildlife
125956/22/2023Revision Notice for PG&E's 2023-2025 WMP
Enclosed is a Revision Notice the Office of Energy Infrastructure Safety (Energy Safety) is issuing in conjunction with its review of Pacific Gas and Electric Company’s (PG&E) 2023-2025 WMP (Base WMP).
 Office of Energy Infrastructure Safety
125866/21/2023Notice of 2025 WMP Update Guidelines Workshop
Notice of a public workshop on the development of the 2025 Wildfire Mitigation Plan Update Guidelines to be held on July 19, 2023. Included in the document are Energy Safety's preliminary proposals.
 Office of Energy Infrastructure Safety
124856/15/2023Risk Modeling Working Group Summary Report, Phase I
In October 2021, Energy Safety began hosting a series of RMWG sessions. The sessions were split into two phases. Phase I prioritized information sharing related to wildfire risk modeling. This report summarizes Phase I and establishes a foundation for Phase II work.
 Office of Energy Safety Infrastructure
124556/9/2023Energy Safety Response to PacifiCorp Request for Extension
Energy Safety response to PacifiCorp’s request to extend Cal Advocates' comment deadline for PacifiCorp’s 2023-2025 WMP.
 Office of Energy Infrastructure Safety
124516/8/2023Regulatory Recommendations Workshop Notice and Agenda

Electrical Infrastructure
 Office of Energy Infrastructure Safety
124466/8/2023Revised 2023 Wildfire Mitigation Plan Schedule
Energy Safety is hereby extending the 2023 WMP schedule. This includes a delay to the SMJU public workshop, to the publication dates for the Large Investor-Owned Utilities (IOUs) Revision Notices (where necessary) and draft Decisions, and to the publication dates for the SMJU and ITO Revision Notices (where necessary) and draft Decisions.
2 page(s)
Wildfire Mitigation Plan StakeholdersOffice of Energy Infrastructure Safety
124386/7/2023Bear Valley Electric Service 2023-2025 Wildfire Mitigation Plan
with non-substantive errata changes
411 page(s)
 Bear Valley Electric Service, Inc.
124376/7/2023BVES Errata to 2023-2025 Wildfire Mitigation Plan
Non-substantive errata
2 page(s)
Caroline Thomas Jacobs DirectorBear Valley Electric Service, Inc.
124366/6/20232023_06_06_SDG&E_ReplyComments_2023_2025WMP_R0
 San Diego Gas & Electric
124356/6/20232023_06_06_SCE_ReplyComments_2023-2025WMP_R0
 Southern California Edison
124336/6/20232023 06-06 PG&E ReplyComments 2023-2025WMP R0
 PG&E
124326/6/20232023 06-06 RCRC ReplyComments 2023-2025WMP R0
Reply Comments to Large IOUs
3 page(s)
 Rural County Representatives of California
124316/6/20232023 06-06 Mussey Grade Road Alliance ReplyComments 2023-2025WMP R0
REPLY COMMENTS ON 2023-2025 WILDFIRE MITIGATION PLANS OF PG&E, SCE, AND SDG&E
 Mussey Grade Road Alliance
124296/5/2023PacifiCorp 2023 WMP Comment Extension Request (6-5-23)
 PacifiCorp
124036/1/20232023 SMJU ITO WMP Workshop Agenda
Description and agenda for Friday, June 16, 2023, workshop
Electrical Infrastructure
 Office of Energy Infrastructure Safety
123905/28/20232023_05_28_Troy_OpeningComments_PGE_2023_2025WMP_R0
 Montclair Hills, Oakland Resident
123895/27/20232023_05_27_Christenson_OpeningComments_PGE_2023_2025WMP_R0
Personal experience with 1991 Oakland Hills firestorm
Electrical Infrastructure
 Montclair Hills, Oakland Resident
123885/26/20232023_05_26_Ramachandran_OpeningComments_PGE_2023_2025WMP_R0
Letter from Councilmember Ramachandran
1 page(s)
 Oakland City Council D4
123875/26/20232023_05_26_Anonymous_OpeningComments_PGE_2023_2025WMP_R0
 Montclair Resident
123865/26/20232023_05_26_Buckingham_OpeningComments_PGE_2023_2025WMP_R0
Comment on Risk Factors and Concern of Montclair for improved risk assessment and mitigation.
Electrical Infrastructure
3 page(s)
Office of Energy Infrastructure SafetyMontclair Property Owner
123855/26/20232023_05_26_Green_Power_Institute_OpeningComments_2023_2025WMP_R0
Comments to PG&E, SCE, and SDG&E WMP filings
 Green Power Institute
123845/26/20232023_05_26_The_Utility_Reform_Network_OpeningComments_SCE_2023_2025WMP_R0
 The Utility Reform Network
123835/26/20232023_05_26_The_Utility_Reform_Network_Appendices_SDGE_2023_2025WMP_R0
 The Utility Reform Network
123825/26/20232023_05_26_The_Utility_Reform_Network_OpeningComments_SDGE_2023_2025WMP_R0
 The Utility Reform Network
123815/26/20232023_05_26_The_Utility_Reform_Network_Appendices_PGE_2023_2025WMP_R0
 The Utility Reform Network
123805/26/20232023_05_26_The_Utility_Reform_Network_OpeningComments_PGE_2023_2025WMP_R0
 The Utility Reform Network
123795/26/20232023_05_26_Joint_CCAs_OpeningComments_PGE_2023_2025WMP_R0
Opening Comments of Marin Clean Energy, Sonoma Clean Power Authority, Pioneer Community Energy, and East Bay Community Energy on PG&E's 2023 to 2025 Wildfire Mitigation Plan
Electrical Infrastructure
36 page(s)
Office of Energy Infrastructure SafetyLaw Office of David Peffer
123785/26/20232023_05_26_CalAdvocates_OpeningComments_2023_2025WMP_R0
Comments to PG&E, SCE, and SDG&E WMP filings
 California Public Utilities Commission
123775/26/20232023_05_26_So_OpeningComments_PGE_2023_2025WMP_R0
 Individual
123765/26/20232023_05_26_Isola_OpeningComments_PGE_2023_2025WMP_R0
Comments
 Montclair, Oakland resident
123755/26/20232023_05_26_RCRC_OpeningComments_2023_2025WMP_R0
Comments to PG&E and SCE WMP filings
8 page(s)
 Rural County Representatives of California
123745/26/20232023_05_26_City_of_Oakland_OpeningComments_PGE_2023_2025WMP_R0
 City of Oakland
123695/26/20232023_05_26_Mechem_OpeningComments_PGE_2023_2025WMP_R0
Comments about why Montclair should be in the PGE WMP
Electrical Infrastructure
3 page(s)
Energy Safety Curran Mechem Family
123685/26/20232023_05_25_CDFW_OpeningComments_SDGE_2023_2025WMP_R0

Electrical Infrastructure
 California Department of Fish and Wildlife
123675/26/20232023_05_25_CDFW_OpeningComments_SCE_2023_2025WMP_R0

Electrical Infrastructure
 California Department of Fish and Wildlife
123665/26/20232023_05_25_CDFW_OpeningComments_PGE_2023_2025WMP_R0

Electrical Infrastructure
 California Department of Fish and Wildlife
123655/26/20232023_05_26_Joint_Local_Governments_OpeningComments_PGE_2023_2025WMP_R0
 Downey Brand LLP
123645/26/20232023_05_26_City_of_Moorpark_OpeningComments_SCE_2023_2025WMP_R0
 Downey Brand LLP
123635/26/20232023_05_26_MGRA_OpeningComments_2023_2025WMP_R0
Mussey Grade Road Alliance Comments on 2023-2025 Wildfire Mitigation Plans of PG&E, SCE, and SDG&E
 Mussey Grade Road Alliance
123625/25/20232023_05_25_Southard_OpeningComments_PGE_2023_2025WMP_R0
 Undergrounding Montclair
123415/22/20232023_05_22_Allenby_OpeningComments_PGE_2023_2025WMP_R0
 Montclair, Oakland resident
123405/19/20232023_05_19_Barbera_OpeningComments_PGE_2023_2025WMP_R0

Electrical Infrastructure
 Montclair Hills, Oakland California resident
123365/19/20232023-05-19_Liberty_2023_WMP_R1
 Liberty Utilities
123355/19/20232023-05-19_Liberty_Cover Letter_2023_WMP_R1
 Liberty Utilities
123325/19/2023Liberty Application for Confidential Treatment of 2023 WMP
 Liberty Utilities
123195/18/2023BVES Wildfire Mitigation Plan Errata 05-18-2023
BVES Errata to 2023-2025 Wildfire Mitigation Plan
Electrical Infrastructure
2 page(s)
Caroline Thomas JacobsBear Valley Electric Service, Inc.
123035/17/2023Large IOU WMP Reply Comment Extension
Reply Comment Deadline for Large IOU WMP has been extended to Tuesday, June 6, 2023.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
122905/15/20232023-2025-WMPs_SCE_Request to Change Reply Comments Deadline
 Southern California Edison
122895/12/2023Energy Safety Community Vulnerability Scoping Meeting Slide Deck
PowerPoint Presentation Scoping Meeting: Community Vulnerability in Wildfire Mitigation Planning May 10, 2023
 Office of Energy Infrastructure Safety
122295/8/20232023-05-08_PC_2023_WMP_R0.pdf
 PacifiCorp
122285/8/2023PacifiCorp 2023 WMP Submission Cover Letter - May 8 2023.pdf
 PacifiCorp
122275/8/20232023-05-08 LSPGC 2023-2025 Base WMP R0
 LS Power
122265/8/2023LSPGC 2023-2025 Base WMP Cover Letter
 LS Power
122255/8/2023Trans Bay Cable 2023-2025 Base WMP R0
 Trans Bay Cable LLC
122245/8/2023Trans Bay Cable 2023-2025 Base WMP Cover Letter
 Trans Bay Cable LLC
122235/8/2023Horizon West Transmission 2023-2025 Base WMP R0
 Horizon West Transmission LLC
122225/8/2023Horizon West Transmission 2023-2025 Base WMP Cover Letter
 Horizon West Transmission LLC
122215/8/2023Horizon West Transmission Application for Confidential Treatment
 Horizon West Transmission LLC
122205/8/2023Bear Valley Electric Service, Inc. 2023-2025 WMP Appendices
 Bear Valley Electric Service, Inc.
122195/8/2023Bear Valley Electric Service, Inc. 2023-2025 Wildfire Mitigation Plan
 Bear Valley Electric Service, Inc.
122185/8/2023Liberty Application for Confidential Treatment of WMP
 Liberty Utilities
122175/5/20232023-05-05_Liberty_2023_WMP_R0
 Liberty Utilities
122165/5/2023Liberty_Cover Letter_2023 WMP Update
 Liberty Utilities
122155/8/2023Trans Bay Cable Application for Confidential Treatment
 Trans Bay Cable LLC
121915/3/2023Large IOU WMP Workshop Slides and Recording
Recording link and slides from the April 27 and 28, 2023, workshop on the Wildfire Mitigation Plans of PG&E, SCE, and SDG&E.
 Office of Energy Infrastructure Safety
121244/26/2023SDG&E 2023-2025 Wildfire Mitigation Plan R1 Non-Substantive Errata
 San Diego Gas & Electric
121234/26/2023SDG&E Application for Confidential Treatment of WMP Errata
 San Diego Gas & Electric
121224/26/2023SCE Non-Substantive Errata for the 2023-2025 WMP
 Southern California Edison
121214/26/2023PG&E's 2023-2025 Wildfire Mitigation Plan Non-Substantive Errata
 PG&E
121204/26/20232023-04-06_PGE_2023_WMP_R2_Section 6.4.2_Atch01
 PG&E
121194/26/2023Revised 2023 Maturity Survey Adoption Meeting Materials
Recording link and slides from the April 24, 2023, public meeting where the Revised 2023 Electrical Corporation Wildfire Mitigation Maturity Survey was adopted.
 Office of Energy Infrastructure Safety
121184/26/2023Revised 2023 Maturity Survey
Revised 2023 Electrical Corporation Wildfire Mitigation Maturity Survey adopted at the April 24, 2023, public meeting.
 Office of Energy Infrastructure Safety
120804/21/2023Revised 2023 WMP Workshop Agenda
Meeting details and agenda for WMP Workshop April 27-28, 2023. Meeting links have been revised.
 Office of Energy Infrastructure Safety
120664/19/2023Proposed Final Revisions to 2023 Maturity Survey
Proposed final revisions to the 2023 Electrical Corporation Wildfire Mitigation Maturity Survey to be considered for adoption at the April 24, 2023, adoption meeting.
 Office of Energy Infrastructure Safety
120434/14/2023Adoption Meeting Notice for Revised 2023 Maturity Survey.
Energy Safety will hold a public meeting on April 24, 2023, to consider the adoption of the Revised 2023 Electrical Corporation Wildfire Mitigation Maturity Survey.
 Office of Energy Infrastructure Safety
120384/13/2023SCOPING MEETING Community Vulnerability in Wildfire Mitigation Planning
Scoping Meeting Flyer & Agenda @caenergysafety SCOPING MEETING Community Vulnerability in Wildfire Mitigation Planning An Opportunity to Share Your Expertise FEATURED SPEAKERS: WEDNESDAY May 10, 2023 10 a.m. - 12:30 p.m.
 Office of Energy Infrastructure Safety
120334/7/2023Workshop Notice - Large IOU WMPs
Notice of April 27 - 28, 2023, public workshop on 2023-2025 Wildfire Mitigation Plan submissions of PG&E, SCE, and SDG&E.
 Office of Energy Infrastructure Safety
120314/6/2023PG&E's 2023-2025 WMP Errata Confidentiality Declaration
 PG&E
120264/6/2023PG&E's 2023-2025 Wildfire Mitigation Plan Errata
 PG&E
120254/6/20232023-04-06_PGE_2023_WMP_R1_Section 6.4.2_Atch01
Errata attachment to 2023-2025 WMP
 PG&E
120244/6/2023PG&E's 2023-2025 Wildfire Mitigation Plan Errata Cover Letter
 PG&E
120234/6/20232023-04-06_SCE_2023_WMP_Errata
 Southern California Edison
120194/5/2023SH-12 PSPS MICROGRID SITE REVIEW Redacted
 Southern California Edison
120184/5/2023OEIS Declaration of Confidentiality 2023 WMP April 4 2023
 Southern California Edison
120104/3/2023SDG&E Comments_Substantive Revision to 2023 Maturity Survey
 San Diego Gas & Electric
120094/3/2023SCE Comments re OEIS Notice Substantive Rev Maturity Survey
 Southern California Edison
120084/3/2023PG&E's Comments on Substantive Revision to 2023 Maturity Survey
 PG&E
119943/30/2023PG&E's 2023 WMP Discovery Tracker – March 30, 2023
 PG&E
119873/28/2023Limitations of E-Filing System with PG&E's 2023-2025 WMP
 PG&E
119863/28/20232023-03-27_SDGE_2023_WMP_Cover_Letter_R0
 San Diego Gas & Electric
11965-13/27/2023PG&E's 2023-2025 Wildfire Mitigation Plan
 PG&E
11965-23/27/20232023-03-27_PGE_2023_WMP_R0_Appendix D ACI PG&E-22-11_Atch01
 PG&E
11965-33/27/20232023-03-27_PGE_2023_WMP_R0_Appendix D ACI PG&E-22-11_Atch02
 PG&E
11965-43/27/20232023-03-27_PGE_2023_WMP_R0_Section 6.4.2_Atch01
 PG&E
11965-53/27/20232023-03-27_PGE_2023_WMP_R0_Section 10_Atch01
 PG&E
11965-63/27/20232023-03-27_PGE_2023_WMP_R0_Section 10_Atch02_Redacted
 PG&E
11965-73/27/20232023-03-27_PGE_2023_WMP_R0_Section 6.6.1_Atch01
 PG&E
11965-83/27/20232023-03-27_PGE_2023_WMP_R0_Section 8.2.3_Atch01_Redacted
 PG&E
11965-93/27/20232023-03-27_PGE_2023_WMP_R0_Section 8.3.3_Atch01
 PG&E
11964-13/27/2023CAISO Standards for Reliability Safety Emergencies Disasters
 Southern California Edison
11964-23/27/2023GO 128 Rules - Const UG Electric Supply Comm Systems 01.06
 Southern California Edison
11964-33/27/2023GO 166 Stdrs Op Reliability Safety During ER and Disasters
 Southern California Edison
11964-43/27/2023Joint IOU CC Testing Cumulative Report 12-22-22_Redacted
 Southern California Edison
11964-53/27/2023Quant and Qual Factors for PSPS Decision Making
 Southern California Edison
11964-63/27/2023REFCL Projects at Southern California Edison
 Southern California Edison
11964-73/27/2023SCE Fast Curve Protection Philosophy Review_Redacted
 Southern California Edison
119633/27/2023PG&E's 2023-2025 Wildfire Mitigation Plan Confidentiality Declaration
 PG&E
11962-13/27/2023PSPS Decision-making Technical Paper
 Southern California Edison
11962-23/27/2023PSPS OIR Phase 1 D.19-05-042
 Southern California Edison
11962-33/27/2023PSPS OIR Phase 2 D.20-05-051
 Southern California Edison
11962-43/27/2023PSPS OIR Phase 3 D.21-06-034
 Southern California Edison
11962-53/27/2023PSPS Order Instituting Investigation (OII) (D.21-06-014)
 Southern California Edison
11962-63/27/2023Public Safety Power Shutoff_ Decision-Making
 Southern California Edison
11962-73/27/2023REFCL_2014 Analysis of resonant earthed networks
 Southern California Edison
11962-83/27/2023SB901 Sep2017
 Southern California Edison
11962-93/27/2023SCE VM-3_Program Guide
 Southern California Edison
11962-103/27/2023SH-12 PSPS MICROGRID SITE REVIEW_Redacted
 Southern California Edison
11962-113/27/2023Southern California Edison All-Hazards Plan_Redacted
 Southern California Edison
11962-123/27/2023Transmission Detail QC Inspection Process_Redacted
 Southern California Edison
11962-133/27/2023Transmission Inspection and Maintenance Program (TIMP)
 Southern California Edison
11962-143/27/2023UVM-01 (Utility Vegetation Management Program Manual)
 Southern California Edison
11962-153/27/2023UVM-02 (Transmission Vegetation Management Program (TVMP))
 Southern California Edison
11962-163/27/2023UVM-03 (Distribution Vegetation Management Program (DVMP))
 Southern California Edison
11962-173/27/2023UVM-04 (Hazard Tree Management Program (HTMP))
 Southern California Edison
11962-183/27/2023UVM-05 (Integrated Vegetation Management Plan (IVMP))
 Southern California Edison
11962-193/27/2023UVM-06 (LiDAR Schedule Reference Guide)
 Southern California Edison
11962-203/27/2023UVM-07 (Post Work Verification and UVM Program Oversight)
 Southern California Edison
11962-213/27/2023UVM-08 (Managing Vegetation Threats)
 Southern California Edison
11962-223/27/2023UVM-18 (Assessment and Removal of Dead and Dying Trees)
 Southern California Edison
11962-233/27/2023Vegetation Management - Operations IMT Storm Manual
 Southern California Edison
11962-243/27/2023WRF User Guide
 Southern California Edison
119613/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119603/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119593/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119583/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119573/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119563/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119553/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119543/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
119533/27/2023OEIS_Confidentiality_Application_2023_WMP executed
 Southern California Edison
11952-13/27/20232023-03-27_SCE_2023_WMP_Cover_Letter_R0
 Southern California Edison
11952-23/27/20232023-03-27_SCE_2023_WMP_R0
 Southern California Edison
11952-33/27/2023AFN Plan
 Southern California Edison
11952-43/27/20232023 WMP SCE Table 8-59 List of Community Partners
 Southern California Edison
11952-53/27/20232023 WMP SCE Sections 8-4 and 8-5 Large Tables – REDACTED
 Southern California Edison
11952-63/27/2023Covered Conductor Compendium
 Southern California Edison
11952-73/27/2023Distribution Inspection and Maintenance Program (DIMP)
 Southern California Edison
11952-83/27/2023Energy Release Component (ERC) Fact Sheet
 Southern California Edison
11952-93/27/2023ESRB-8 Resolution Extending De-Energization Reasonableness, Notification, Mitigation, and Reporting Requirements in Decision 12-
 Southern California Edison
11952-103/27/2023Generation QC Inspection Process
 Southern California Edison
11952-113/27/2023GO 95 Rules for Electric Overhead Line Construction Jan2020
 Southern California Edison
11952-123/27/2023Maintenance and Inspection Manual - Appendix A
 Southern California Edison
11952-133/27/2023Materials Specification 454
 Southern California Edison
11952-143/27/2023Overhead Detailed QC Inspection Process_Redacted
 Southern California Edison
11952-153/27/2023PGE_ACI_Covered_Conductor_Testing_Redacted
 Southern California Edison
119493/27/2023Application for CONFIDENTIAL Treatment
 San Diego Gas & Electric Company
119483/27/20232023-2025 SDGE WMP R0 with Attachments
 San Diego Gas & Electric Company
119393/21/2023Revised WMP Schedule for SMJUs and ITOs
Revised WMP schedule for Small Multi-Jurisdictional Utilities and Independent Transmission Operators. The SMJUs and ITOs will submit their 2023-2025 WMPs on May 8, 2023.
 Office of Energy Infrastructure Safety
118813/3/2023Substantive Revisions to Maturity Survey for Public Comment
Proposed substantive revisions to 2023 Electrical Corporation Wildfire Mitigation Maturity Survey. Comments will be accepted through April 3, 2023.
 Office of Energy Infrastructure Safety
118662/24/2023Data Request Stakeholder Designation
RCRC Data Request Stakeholder Designation for all electrical corporations
Electrical Infrastructure
2 page(s)
 Rural County Representatives of California
11851-12/21/2023Second Revised Maturity Model
 Office of Energy Infrastructure Safety
11851-22/21/2023Second Revised Maturity Survey
 Office of Energy Infrastructure Safety
118502/21/2023Second Revised Maturity Model and Survey Letter
Non-substantive edits to the Maturity Model and Maturity Survey. Clean versions of the Maturity Model and Maturity Survey will be filed immediately following the publication of this letter.
 Office of Energy Infrastructure Safety
118452/16/2023Request to become stakeholder
 Green Power Institute
118442/16/2023Request for Data Request Stakeholder Designation
Requests Data Request Stakeholder designation for 2023-2025 WMP docket
Electrical Infrastructure
2 page(s)
Caroline Thomas JacobsThe Utility Reform Network
118412/10/2023Energy Safety Utility Vegetation Management Best Practices Scoping Meeting Slide Deck
This slide deck was presented during Energy Safety's scoping meeting on Utility Vegetation Management for Wildfire Safety, February 10, 2023. The slides include the results of the live polls, a link to the recording of the meeting, and a link to the post-meeting survey.
 Office of Energy Infrastructure Safety
118112/1/2023MGRA Request for Stakeholder Designation
 Mussey Grade Road Alliance
118091/31/2023Public Advocates Office Request for Data Request Stakeholder Designation 2023-2025-WMPs
 California Public Utilities Commission
118071/24/2023SCOPING MEETING Utility Vegetation Management Best Practices for Wildfire Safety
Energy Safety is hosting an initial scoping meeting for stakeholders, relevant state agencies, and California’s electrical corporations to share ideas and discuss best practices for utility vegetation management (UVM) for wildfire safety. This meeting will be on Friday, February 10 from 9am to 12:30pm PST.
2 page(s)
 Office of Energy Infrastructure Safety
118061/23/2023QDR Table 10 Projections Expectations
Expectations for Projections in Quarterly Data Report Table 10: Recent use of Public Safety Power Shutoffs (PSPS) and other PSPS metrics
 Office of Energy Infrastructure Safety
117981/10/2023QDR Table 2 Projections Expectations
Letter of expectations regarding projections of Performance Metrics in Table 2 of the Quarterly Data Report
 Office of Energy Infrastructure Safety
117951/6/2023Revised Final Electrical Corporation Wildfire Mitigation Maturity Survey and Model
Final versions of the Electrical Corporation Wildfire Mitigation Maturity Survey and Model including non-substantive edits to correct typos and errors in numbering.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1178312/23/2022Letter Soliciting Input in Review of Electrical Infrastructure Safety Requirements
Energy Safety letter soliciting public input in its review of electrical infrastructure safety requirements. Energy Safety's review, pursuant to Public Utilites Code section 326(a)(7), will focus on, ". . . safety requirements for electrical transmission and distribution infrastructure and infrastructure and equipment attached to that electrical infrastructure. . ."
 Office of Energy Infrastructure Safety
1175312/8/2022Adoption Meeting Slides and Recording
Presentation slides and recording link from December 6, 2022, public adoption meeting for 2023-2025 Wildfire Mitigation Plan Guidelines.
 Office of Energy Infrastructure Safety
1175012/7/20222023 WMP Schedule
Schedule for 2023 Wildfire Mitigation Plan submission and evaluation
 Office of Energy Infrastructure Safety
1174912/7/20222023-2025 ITO Supplement
Final 2023-2025 Independent Transmission Operator Supplement to the Technical Guidelines
 Office of Energy Infrastructure Safety
1174812/7/20222023-2025 Wildfire Mitigation Maturity Model
Final 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Model
 Office of Energy Infrastructure Safety
1174712/7/20222023 Wildfire Mitigation Maturity Survey
Final 2023 Electrical Corporation Wildfire Mitigation Maturity Survey
 Office of Energy Infrastructure Safety
1174612/7/20222023-2025 WMP Process Guidelines
Final 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines
 Office of Energy Infrastructure Safety
1174512/7/20222023-2025 WMP Technical Guidelines
Final 2023-2025 Wildfire Mitigation Plan Technical Guidelines
 Office of Energy Infrastructure Safety
1174412/7/2022Final 2023-2025 WMP Guidelines Cover Letter
Cover letter for Final 2023-2025 Wildfire Mitigation Plan Guidelines documents. The final documents were adopted at the December 6, 2022, adoption meeting.
 Office of Energy Infrastructure Safety
1174112/5/2022Proposed Final 2023-2025 ITO Supplement
Proposed Final 2023-2025 Independent Transmission Operator Supplement to the Wildfire Mitigation Plan Technical Guidelines. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting.
 Office of Energy Infrastructure Safety
1173812/5/2022Proposed Final 2023-2025 WMP Technical Guidelines
Proposed Final 2023-2025 Wildfire Mitigation Plan Technical Guidelines. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting.
 Office of Energy Infrastructure Safety
1173712/5/2022Proposed Final 2023-2025 WMP Process Guidelines
Proposed Final 2023-2025 Wildfire Mitigation Plan Process and Evaluation Guidelines. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting.
 Office of Energy Infrastructure Safety
1173612/5/2022Proposed Final 2023 Maturity Survey
Proposed Final 2023 Electrical Corporation Wildfire Mitigation Maturity Survey. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting.
 Office of Energy Infrastructure Safety
1173512/5/2022Proposed Final 2023-2025 Maturity Model
Proposed Final 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Model. The proposed final is set to be considered for adoption at the December 6, 2022, adoption meeting.
 Office of Energy Infrastructure Safety
1173412/2/2022Letter on 2023 WMP Submission Template
Letter providing an update on the 2023 Wildfire Mitigation Plan Submission Template.
 Office of Energy Infrastructure Safety
1171611/23/2022Notice of Adoption Meeting for 2023-2025 WMP Guidelines
Public meeting announcement for 2023-2025 Wildfire Mitigation Plan Guidelines Adoption Meeting to take place December 6, 2022.
 Office of Energy Infrastructure Safety
1171511/23/2022Energy Safety Response to WSAB Recommendations on WMP Guidelines
Office of Energy Infrastructure Safety's response to Wildfire Safety Advisory Board's April 26, 2022, recommendations on Wildfire Mitigation Plan Guidelines
 Office of Energy Infrastructure Safety
1160710/27/2022Pacific Gas and Electric Company’s Comments on the Office of Energy Infrastructure Safety’s Draft 2023-2025 WMP Schedule
 PG&E
1160410/26/2022Nancy B Macy Comments on OEIS Draft 2023-2025 Wildfire Mitigation Plan Guidelines Package 1
Comments on OEIS Draft 2023 Wildfire Mitigation Plan Guidelines
Electrical Infrastructure
2 page(s)
OEIS Valley Women's Club Environmental Committee for San Lorenzo Valley
1160310/26/2022GPI Comments on the Draft 2023 WMP Guidelines
 Green Power Institute
1160110/26/2022SDGE Comments to Draft 2023-2025 Wildfire Mitigation Plan Guidelines - Package 1
 San Diego Gas & Electric
1160010/26/2022SDG&E Comments to Draft 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey
 San Diego Gas & Electric
1159810/26/2022LS Power Comments on the Draft 2023 WMP Schedule
 LS Power
1159710/26/2022SCE Comments on the Draft 2023-2025 Wildfire Mitigation Plan Guidelines - Package 1
 Southern California Edison
1159610/26/2022SCE Comments on the Draft 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey
 Southern California Edison
1159510/26/2022Public Advocates Office Comments on 2023 WMP Guidelines
 California Public Utilities Commission
1159410/26/2022Joint Local Governments' Comments on 2023-2025 WMP Guidelines

Electrical Infrastructure
 Downey Brand LLP
1159310/26/2022California Association of Small and Multi-Jurisdictional Utilities (“CASMU”) Comments on the Draft 2023-2025 Wildfire Mitigation

Electrical Infrastructure
13 page(s)
Office of Energy Infrastructure SafetyDowney Brand LLP
1159110/26/2022Pacific Gas and Electric Company’s Comments on the Office of Energy Infrastructure Safety’s Draft 2023-2025 WMP Guidelines
 PG&E
1159010/26/2022Pacific Gas & Electric Company’s Comments on the Draft 2023-2025 Electrical Corporation Wildfire Mitigation Maturity Survey
 PG&E
1158810/26/2022California Association of Small and Multi-Jurisdictional Utilities (“CASMU”) Comments on the Draft 2023 WMP Schedule

Electrical Infrastructure
4 page(s)
Office of Energy Infrastructure SafetyDowney Brand LLP
1158610/26/2022Comments of Kevin Collins addressing 2023 WMP guidelines
Letter to OEIS as comment upon the 2023 - 2025 guidelines for wildfire mitigation plans.
Electrical Infrastructure
9 page(s)
Office of Energy Infrastructure SafetyKevin Collins
1158510/26/2022MUSSEY GRADE ROAD ALLIANCE COMMENTS ON WILDFIRE MITIGATION PLAN GUIDELINES FOR 2023-2025

Electrical Infrastructure
 Mussey Grade Road Alliance
1158410/25/2022Robert A. Johnston Comments on the Draft 2023-25 WMP Guidelines
Comments
Electrical Infrastructure
4 page(s)
OEISUC Davis, retired
1157710/21/2022Draft 2023-2025 WMP Guidelines Workshop Slides and Recording
Presentation slides and recording link from October 17, 2022, public workshop.
 Office of Energy Infrastructure Safety
1156310/14/2022Draft 2023 WMP Schedule
Draft 2023 Wildfire Mitigation Plan Schedule published for public comment. Comments will be accepted through October 26, 2022.
 Office of Energy Infrastructure Safety
1155610/7/2022Draft Independent Transmission Operator Supplement to the 2023-2025 Wildfire Mitigation Plan Technical Guidelines
This supplement presents the modified reporting requirements for ITOs, intended to inform the preparation and submission of their 2023–2025 comprehensive WMPs.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1154410/4/2022Public Meeting Notice: Workshop on Draft 2023-2025 WMP Guidelines
The Office of Energy Safety will host a public workshop on October 17, 2022, to take public comments on documents related to the Draft 2023-2025 Wildfire Mitigation Plan Guidelines.
 Office of Energy Infrastructure Safety
114959/21/20222023-2025 Wildfire Mitigation Plans Maturity Survey
Maturity Survey 2022 09-21
 Office of Energy Infrastructure Safety
114919/19/2022Draft 2023-2025 Wildfire Mitigation Plan Guidelines
Draft 2023-2025 Wildfire Mitigation Plan Guidelines package for public review and comment. Public comment will be accepted through October 26,2022. This package includes: 1) Draft 2023-2025 WMP Technical Guidelines (including Maturity Model) and 2) Draft 2023-2025 WMP Process and Evaluation Guidelines
 Office of Energy Infrastructure Safety
108795/6/2022Comments of Kevin Collins addressing 2023 WMP guidelines
WMP comment filing
Electrical Infrastructure
5 page(s)
Office of Energy Infrastructure SafetyKevin Collins
108725/6/2022#2023-WMPs Comments--Valley Women's Club
#2023-WMPs Comments--Valley Women's Club
Electrical Infrastructure
3 page(s)
Melissa Spencer, Deputy Director Electrical Infrastructure Directorate California Office of Infrastructure SafetyValley Women's Club
108705/6/2022Abrams 2023 WMP Proposed Guidelines and Comments
 Self
108685/6/2022Cal Advocates Comments on 2023 WMP Guidelines
 California Public Utilities Commission
108675/6/20222022-05-06_SCE_2022_Comments-Re-Workshop- 2023-WMP-Guideline-Development_R0
 Southern California Edison
10866-15/6/2022MUSSEY GRADE ROAD ALLIANCE COMMENTS ON THE 2023 WILDFIRE MITIGATION PLAN GUIDELINES WORKSHOP

Electrical Infrastructure
 Mussey Grade Road Alliance
10866-25/6/2022SDG&E Comments to 2023 WMP Guidelines Workshop

7 page(s)
 San Diego Gas & Electric
10866-35/6/2022PGE Comments on 2023 WMP Guidelines Workshop
Comments of Pacific Gas and Electric Company on the 2023 Wildfire Mitigation Plan Guidelines Workshop Docket: 2023-WMPs
 PG&E
10866-45/6/2022Comments of the Green Power Institute on the 2023 WMP Guidelines and April 22 Workshop

Electrical Infrastructure
32 page(s)
 Green Power Institute
108194/26/20222023 WMP Guidelines Workshop Slides and Recording
Presentation slides and recording link from April 22, 2022, public workshop.
 Office of Energy Infrastructure Safety
107954/19/20222023 WMP Guidelines Pre-Workshop Material
Pre-workshop material for April 22, 2022, public workshop. Overview of preliminary proposals for 2023 Wildfire Mitigation Plan Guidelines.
 Office of Energy Infrastructure Safety
107554/8/20222023 WMP Guidelines Workshop Announcement
Public Meeting Announcement - April 22, 2022: Workshop on 2023 Wildfire Mitigation Plan Guideline Development. Written comments accepted through May 6, 2022.
 Office of Energy Infrastructure Safety