1. Update progress on WMP Initiatives on "Initiatives" sheet by populating columns A through AB. Progress currently filled in is an example. Yellow cells indicate information that needs to be filled out or confirmed by utility. WMP initiatives that are not already listed
|
Quarterly Submission Guide
Yes No <-- for dropdowns
Wildfire Safety Division Attachment 2.3
Wildifire Mitigation Plan Quarterly report - non-spatial data template
Resolution WSD-011 Attachment 2.3
Instructions for use Relevant options for mitigations table: Table 12
1. Fill out the tan cells (color represented here) starting with the cell below (D17: Utility). Th
|
Microsoft Word - Program_Efficacy_Report_20201214.docx
CONFIDENTIAL: ATTORNEY WORK PRODUCT
Liberty Utilities
Vegetation Management Program Efficacy
December 2020
Prepared by
Novembri Consulting, LLC
Vegetation Management Program Efficacy
CONFIDENTIAL: ATTORNEY WORK PRODUCT
1
At the direction of counsel, the following docu
|
Microsoft Word - Liberty WMP Risk Modeling Workplan
Liberty Risk Model Workplan October 2021
1
In accordance with the OEIS Wildfire Risk Modeling Working Group Workplan Guidelines, Liberty provides
the follow information concerning its Wildfire Risk Modeling.
I. Data used, broken down by model
Liberty uses various data sources in its wildfi
|
Inspection Correction Notice
PROJECT NAME: ___________________________________________ DATE: ___________________
JOB#: ______________________________________________
INSPECTOR: _________________________________________ CORRECTION NOTICE # _________
CONTRACTOR: ______________________________________
CONTRACTOR ACKN
|
PowerPoint Presentation
1
2
❑ ~49,000 customers
❑ ~724 miles of overhead distribution
and transmission lines (>90% HFTD)
❑ ~24,700 utility poles
❑ 15 substations
❑ Connected to Nevada Balancing
Authority (not CAISO)
❑ 125 employees
3
❑ Liberty utilized varying modeling tools to assess wildfire risk at the system level and at the
circuit level
❑ Reax f
|
Covered Conductor
Prepared by Apparatus & Standards Engineering Group
T&D Engineering
October 8, 2018
Covered Conductor - Everything You Need To Know
(Compendium)
Purpose
• There has been a vast amount of literature search, testing, calculation,
benchmarking and standards development by T&D Engineering for the
deployment of Covered Conductor
• As a resu
|
PACIFIC GAS AND ELECTRIC COMPANY
QUARTERLY REPORT ON 2020 WILDFIRE MITIGATION PLAN
FOR THIRD QUARTER 2021
NOVEMEBER 1, 2021
CONDITION GUIDANCE-10
DATA ISSUES – GENERAL
-1-
Introduction
Pursuant to Ordering Paragraph (OP) 8 of California Public Utilities Commission
(Commission or
|
2021 WILDFIRE MITIGATION PLAN
CHANGE ORDER DECISION
Utility 2021 Wildfire Mitigation Plan Change Order Determinations
REPORT TITLE GOES
HERE
Change Order Decision – Utility 2021 Wildfire Mitigation Plan Change Order Results
TABLE OF CONTENTS
Executive Summary ........................................................................
|
Quarterly Submission Guide
Yes No <-- for dropdowns
Wildfire Safety Division Attachment 2.3
Wildifire Mitigation Plan Quarterly report - non-spatial data template
Resolution WSD-011 Attachment 2.3
Instructions for use
1. Fill out the tan cells (color represented here) starting with the cell below (D17: Utility). The Utility name will populate the Table ta
|
|