15498 | 3/20/2025 | Electrical Corporation Wildfire Mitigation Maturity Survey The adopted Electrical Corporation Wildfire Mitigation Maturity Survey. See the separate E-filing "Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines" for the Guidelines that accompany this spreadsheet. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
15497 | 3/20/2025 | Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines The adopted Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines (formerly known as WMP Guidelines - Package 2). See the separate E-filing "Electrical Corporation Wildfire Mitigation Maturity Survey" for the Excel file that accompanies these Guidelines. Electrical Infrastructure 181 page(s) | | Office of Energy Infrastructure Safety |
15496 | 3/20/2025 | Materials from Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines Adoption Meeting Notice of availability of the materials from the March 19, 2025, Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines adoption meeting. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
15479-1 | 3/19/2025 | Proposed Final Electrical Corporation Wildfire Mitigation Maturity Survey Proposed Final Electrical Corporation Wildfire Mitigation Maturity Survey Excel file to accompany the Proposed Final Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines. Electrical Infrastructure 364 page(s) | | Office of Energy Infrastructure Safety |
15479-2 | 3/19/2025 | Proposed Final Electrical Corporation Wildfire Mitigation Maturity Survey (Redline) Redline of the Proposed Final Electrical Corporation Wildfire Mitigation Maturity Survey Excel file to accompany the Proposed Final Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines. | | Office of Energy Infrastructure Safety |
15478 | 3/19/2025 | Proposed Final Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines The Proposed Final Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines (formerly known as WMP Guidelines - Package 2). Please see the separate E-filing "Proposed Final - Electrical Corporation Wildfire Mitigation Maturity Survey" for the Excel file that accompanies these Guidelines. Electrical Infrastructure 364 page(s) | | Office of Energy Infrastructure Safety |
15453 | 3/12/2025 | Materials from Question and Answer session for Draft Wildfire Mitigation Maturity Model and Survey Guidelines Link to the recording and PowerPoint presentation slides for the March 11, 2025, Question and Answer (Q&A) session for the Draft Wildfire Mitigation Maturity Model and Survey Guidelines. | | Office of Energy Infrastructure Safety |
15447 | 3/7/2025 | Public Meeting for Draft Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines Adoption The Office of Energy Infrastructure Safety (Energy Safety) will hold a public meeting (via Teams) on March 19 at 10 a.m. for adoption of the Draft Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines (Maturity Model and Survey Guidelines). | | Office of Energy Infrastructure Safety |
15428 | 3/3/2025 | Joint Utility Comments on the Draft WMP Guidelines Package 2 San Diego Gas & Electric Company, Southern California Edison and Pacific Gas & Electric Company’s Comments on Draft 2026-2028 WMP Guidelines Package 2 (Maturity Model) | | San Diego Gas and Electric |
15422 | 2/28/2025 | Question-and-Answer Session for the Draft Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines The Office of Energy Infrastructure Safety (Energy Safety) will hold a public meeting on March 11th at 10:30 a.m. for a Question-and-Answer (Q&A) session regarding the Draft Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines (Maturity Model and Survey Guidelines) and the Draft Maturity Survey. | | The Office of Energy Infrastructure Safety |
15406 | 2/24/2025 | Wildfire Mitigation Plan Guidelines Final Wildfire Mitigation Plan (WMP) Guidelines | | Office of Energy Infrastructure Safety |
15405 | 2/24/2025 | Energy Safety Policy Division Process Guidelines Final Energy Safety Policy Division (ESPD) Process Guidelines | | Office of Energy Infrastructure Safety |
15400 | 2/24/2025 | Materials from Energy Safety Policy Division Process Guidelines Adoption Meeting Notice of availability of the materials from Energy Safety Policy Division Process Guidelines adoption meeting. Electrical Infrastructure 17 page(s) | | Office of Energy Infrastructure Safety |
15399 | 2/24/2025 | Materials from Wildfire Mitigation Plan Guidelines Adoption Meeting Notice of availability of the meeting slides and recording from the Wildfire Mitigation Plan Guidelines Adoption Meeting Electrical Infrastructure 24 page(s) | | Office of Energy Infrastructure Safety |
15381-1 | 2/20/2025 | Proposed Final Wildfire Mitigation Plan Guidelines Enclosed is the Office of Energy Infrastructure Safety’s (Energy Safety’s) proposed final Wildfire Mitigation Plan (WMP) Guidelines. Included are a clean version and a redlined version that show changes from the January 17, 2025, revised draft. These Guidelines are being considered for Adoption on February 21st, 2025. Electrical Infrastructure 509 page(s) | | Office of Energy Infrastructure Safety |
15381-2 | 2/20/2025 | Proposed Final Energy Safety Policy Division Process Guidelines Proposed Final Energy Safety Policy Division Process Guidelines | | The Office of Energy Infrastructure Safety |
15354 | 2/11/2025 | Notice of Public Meeting to Discuss Adoption of the ESPD Process Guidelines Notice of Public Meeting to Discuss Adoption of the ESPD Process Guidelines on February 21, 2025. | | Office of Energy Infrastructure Safety |
15353 | 2/11/2025 | Notice of Public Meeting to Discuss Adoption of the WMP Guidelines Notice of Public Meeting to Discuss Adoption of the WMP Guidelines on February 21, 2025. | | Office of Energy Infrastructure Safety |
15344-1 | 2/10/2025 | Draft WMP Guidelines - Package 2 (Maturity Model and Survey Guidelines) The "Draft Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines" is Package 2 of the WMP Guidelines suite of documents. Please see the separate E-filing "Draft WMP Guidelines - Package 2 (Maturity Survey)" for the Excel file that accompanies these Guidelines.
Opening comments are due by March 3, 2025, and reply comments are due by March 12, 2025. Electrical Infrastructure 182 page(s) | | Office of Energy Infrastructure Safety |
15344-2 | 2/10/2025 | Draft WMP Guidelines - Package 2 (Maturity Survey) The "Draft Electrical Corporation Wildfire Mitigation Maturity Survey" (Maturity Survey) is the Excel file that accompanies the "Draft Electrical Corporation Wildfire Mitigation Maturity Model and Survey Guidelines." Please see the separate E-filing "Draft WMP Guidelines - Package 2 (Maturity Model and Survey Guidelines)" to view these Guidelines. Opening comments are due by March 3, 2025, and reply comments are due by March 12, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
15327 | 2/6/2025 | GPI Comments on the Policy Division Process Guidelines
| | Green Power Institute |
15326 | 2/6/2025 | GPI Comments on revised draft WMP Guidelines
| | Green Power Institute |
15325 | 2/6/2025 | Pacific Gas and Electric Company Comments on the Revised Draft WMP Guidelines
| | PG&E |
15198 | 1/17/2025 | Draft Energy Safety Policy Division Process Guidelines Draft Energy Safety Policy Division Process Guidelines Electrical Infrastructure 18 page(s) | | Office of Energy Infrastructure Safety |
15197 | 1/17/2025 | Revised Draft WMP Guidelines - Package 1 Revised Draft WMP Guidelines - Package 1 Electrical Infrastructure 526 page(s) | | Office of Energy Infrastructure Safety |
15154 | 12/23/2024 | SCE Additional Comments to the Draft WMP Guidelines-Package1
| | Southern California Edison |
15112 | 12/12/2024 | GPI Reply Comments on WMP Guidelines Update
| | Green Power Institute |
15111 | 12/12/2024 | Reply Comments of the Public Advocates Office on Draft WMP Guidelines
| | California Public Utilities Commission |
15108 | 12/12/2024 | SCE Reply Comments to the Draft WMP Guidelines - Package 1
| | Southern California Edison |
15107 | 12/12/2024 | SDGE – Reply Comments on Draft WMP Guidelines – Package 1
| | San Diego Gas & Electric |
15106 | 12/12/2024 | Pacific Gas and Electric Company’s Reply Comments on the Draft WMP Guidelines – Package 1
| | PG&E |
15090 | 12/11/2024 | Materials from Package 1 Draft WMP Guidelines Workshop Link to recording and PowerPoint presentation slides from the November 26, 2024, workshop for Package 1 of the Draft Wildfire Mitigation Plan Guidelines. | | Office of Energy Infrastructure Safety |
15080 | 12/6/2024 | GPI Comments on WMP Guidelines Update
| | Green Power Institute |
15079 | 12/6/2024 | SCE Comments on the Draft WMP Guidelines - Package 1
| | Southern California Edison |
15078 | 12/6/2024 | SDGE – Comments on the Draft WMP Guidelines – Package 1
| | San Diego Gas & Electric |
15077 | 12/6/2024 | Public Advocates Office Comments on Draft WMP Guidelines (Package 1)
| | California Public Utilities Commission |
15074 | 12/6/2024 | Pacific Gas and Electric Company’s Comments on the Draft WMP Guidelines – Package 1
| | PG&E |
15011 | 11/15/2024 | Workshop Notice for Draft WMP Guidelines Workshop Notice and Agenda for Draft WMP Guidelines Electrical Infrastructure 1 page(s) | | Office of Energy Infrastructure Safety |
15002 | 11/12/2024 | Draft WMP Guidelines - Package 1 Package 1 of the Draft WMP Guidelines. Opening comments due December 6, 2024. Reply Comments due December 12, 2024. Electrical Infrastructure 228 page(s) | | Office of Energy Infrastructure Safety |
13865 | 4/8/2024 | Joint IOU Comments on 2026-2028 WMP Guidelines
| | Southern California Edison |
13864 | 4/8/2024 | Public Advocates Office Input for Next Iteration of WMP Guidelines
| | California Public Utilities Commission |
13863 | 4/8/2024 | Comments of The Utility Reform Network on the Next Iteration of Wildfire Mitigation Plan Guidelines
| | The Utility Reform Network |
13862 | 4/8/2024 | Mussey Grade Road Alliance Comments on the 2026-2028 Guidelines
Electrical Infrastructure | | Mussey Grade Road Alliance |
13861 | 4/5/2024 | GPI Comments on Next Iteration of WMP Guidelines
| | Green Power Institute |
13747 | 3/4/2024 | 2026-2028 WMP Guidelines Comment Solicitation Energy Safety is seeking stakeholder comments for the next iteration of WMP guidelines. Comments are due April 8, 2024. | | Office of Energy Infrastructure Safety |