Docket Log

REF #Docketed DateDocument TitleToFrom
1903711/4/2026EUP-PhI_DR_OEIS_006-Q001.zip
Electrical Undergrounding
 Pacific Gas and Electric Company
1903611/4/2026Updated PG&E EUP Comment Schedule for Second Errata Notice
Electrical Undergrounding
 Office of Energy Infrastructure Safety
1901911/2/2026Yurok Tribe Opening Comments
Comment
Electrical Undergrounding
6 page(s)
Office of Energy Infrastructure SafetyYurok Tribe
1901811/2/2026Buckingham_Opening Comments_PG&E's Proposed 2028–2037 Undergrounding Plan — Montclair Hills
Comments supporting study results of Ziegler/RTSynch Corp on Montclair Hills specific risks, study methodolgy and mitigation requirements/undergrounding.
Electrical Undergrounding
2 page(s)
OEISMontclair Property Owner
1901711/2/2026SO F - OPENING COMMENTS PGE 2028-37  So Family
1901611/2/2026PGE_EUPERR_2026-11-02_R0 Pacific Gas and Electric
1901511/2/2026PGE_EUPERR_2026-11-02_Attachment D_R0 Pacific Gas and Electric
1901411/2/2026PGE_EUPERR_2026-11-02_Tabular Data_R0 Pacific Gas and Electric
1901211/2/2026BernardZeiglerOpeningCommentsExplicit_Decision_Algorithm.docx Title
Recommends an explicit decision algorithm to address the selection of alternatives in undergrounding vs hardening adopting criteria that are necessary to measure risk to human life. Describes an initial propose algorithm to provide a basis for further refinedment.
OEISNeighborhood committee
1901011/2/2026YAMAMOTO_Opening Comments
comments to Ups
Electrical Undergrounding
2 page(s)
California Energy Safety (OEIS)sole proprietor
1900611/2/2026RTSync Corp._Opening Comments2_A Network-Level Life-Safety Decision Algorithm for Undergrounding or Hardening Power Lines
Simulation study: why narrow, windy hillside streets and complex topography require undergrounding utility lines to avoid cascading evacuation delays.
Electrical Undergrounding
OEISNeighborhood committee
1900511/2/2026RTSync Corp._Opening Comments1_Detailed Decision Algorithm
Gives detailed description of proposed Decsion Algorithm for undergrounding for critical community traffic patterns
Electrical Undergrounding
 Neighborhood committee
1900211/2/2026Ramachandran_Opening Comments_Response to 10 year under grounding plan
As the elected representative for Oakland City Council District 4, I want to echo on-going concerns I have heard from constituents throughout Oakland’s Very High Fire Severity Zone. I request that PG&E be required to modify its proposed Electrical Undergrounding Plan to prioritize critical evacuation corridors in Oakland Hills.
Electrical Undergrounding
2 page(s)
OEIS/Ca Energy SafetyOakland City Council District Four
1900011/2/2026OPENING COMMENTS OF PACIFIC BELL TELEPHONE COMPANY D/B/A AT&T CALIFORNIA ON PG&E’S 10-YEAR ELECTRICAL UNDERGROUNDING PLAN
OPENING COMMENTS OF PACIFIC BELL TELEPHONE COMPANY D/B/A AT&T CALIFORNIA ON PACIFIC GAS AND ELECTRIC COMPANY’S (“PG&E’S”) 10-YEAR ELECTRICAL UNDERGROUNDING PLAN
Electrical Undergrounding
32 page(s)
The Office of Energy Infrastructure Safety of the State of CaliforniaAT&T
1899911/2/2026Opening Comments of the Rural County Representatives of California on PG&E’s 10-Year Electrical Undergrounding Plan R0
Opening Comments of the Rural County Representatives of California on PG&E’s 10-Year Electrical Undergrounding Plan R0
Electrical Undergrounding
5 page(s)
 Rural County Representatives of California
1899811/2/2026MGRA Opening PG&E EUP DR Responses Mussey Grade Road Alliance
1899711/2/2026MGRA Opening PG&E EUP Comments only Mussey Grade Road Alliance
1899611/2/2026MBarbera_Opening_Comments_Re 2028_2037_10 year plan
Electrical Undergrounding
1 page(s)
 Michael Barbera
1899511/2/202611-1-26 EUP-PGE uhlig opening comments
Electrical Undergrounding
 Homeowner
1899411/2/2026Goldsby_Opening Comments_Urgent Concerns Regarding PG&E's Proposed 2028–2037 Undergrounding Plan — Montclair Hills
Comments against adoption of 10 year plan
Electrical Undergrounding
1 page(s)
Office of Energy Infrastructure SafetyOakland Firesafe Council
1899311/2/2026sachs_opening comments_PGE Undergrounding Plans
letter requesting montclair district be added to undergrounding PG&E plans
Electrical Undergrounding
1 page(s)
OEISMontclair Hills Neighborhood
1899211/2/2026DeMartini_Opening Comments_Letter re Undergrounding PG&E Power lines
resident letter to underground power lines in Montclair Hills, Oakland CA
Electrical Undergrounding
1 page(s)
 Resident
1899111/2/2026Terapan_Opening Comments1_Public comment and request
I am writing as a resident of Montclair Hills, Oakland, to express serious concern about PG&E's proposed 2028–2037 Electrical Undergrounding Plan and its implications for the safety of our community.
Electrical Undergrounding
Planning committeeResidential
1899011/2/2026Terapan_Opening Comments2_Public comment
I am writing as a resident of Montclair Hills, Oakland, to express serious concern about PG&E's proposed 2028–2037 Electrical Undergrounding Plan and its implications for the safety of our community.
Electrical Undergrounding
2 page(s)
Planning Residential
1898911/2/2026Wallis_Opening Comments - Montclair Power Line Undergrouding
Electrical Undergrounding
 Montclair Hills
1898811/2/2026Cunningham_Opening Comments_Electrical: Undergrounding Plans (UPs)
Electrical: Undergrounding Plans (UPs)
Electrical Undergrounding
1 page(s)
Office of Energy Infrastructure SafetyN/a
1898711/2/2026Bromley_Opening Comments_Include Montclair in Undergrounding Plan
Public comment, from a concerned resident of Montclair Hills
 Nicole Dalton Consulting LLC
1898511/2/2026Rouch_Opening Comments_Safeguarding Human Life in Montclair Hills - PG&E's Proposed Undergrounding Plan
Electrical Undergrounding
 Homeowner
1898411/2/2026Gunderman_Opening Comments_Undergrounding letter
Electrical Undergrounding
2 page(s)
 Resident
1898311/2/2026Gardia_Opening Comments_Protecting Human Life in Montclair Hills — PG&E's Proposed Undergrounding Plan
Electrical Undergrounding
 Retired
1898211/2/2026Grassi_Opening Comments_20261030 Lucas Grassi undergrounding
Electrical Undergrounding
 Self
1898111/2/2026Mazurek_Opening Comments_Undergrounding letter
Why Montclair should be included in the undergrounding plan.
Electrical Undergrounding
1 page(s)
 Montclair neighborhood
1897911/2/2026Zeigler_Opening Comments_Why undergrounding is essential
Comments on why undergrounding is essential to ameliorate wildfire risk in the Oakland Hills based on preliminary simulation study
Electrical Undergrounding
1 page(s)
OEISNeighborhood committee
1897810/26/2026DeLashmutt_Opening Comments_Letter - PGE Undergrounding Montclair Hills
1897711/2/2026Cynthia H Barbera - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills
Electrical Undergrounding
14 page(s)
 Montclair Hills, Oakland California resident
1897611/2/2026OPENING COMMENTS OF TURN ON PG&E's 10-YEAR (2028-2037) EUP The Utility Reform Network
1897110/31/2026Scott Beaver - Opening Comments
Scott Beaver - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills
Electrical Undergrounding
 Oakland Montclair Resident
1897010/31/2026Anne Thys - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills
2 page(s)
 Anne Thys
1896910/31/2026Public Comment - Ali Hossein Daftarian Ali Hossein Daftarian
1896810/31/2026Meriwether_Jennifer - Opening Comments On Pg&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills, Oakland Oakland-Montclair Hills resident
1896710/31/2026Carla Crampton - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills Individual Resident
1896610/31/2026Todd Crampton - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills Todd Crampton
1896511/1/2026Ryanwoloshyn-openingcomments
Public comment letter
Electrical Undergrounding
 Ryan Woloshyn
1896411/1/2026Kenneth Wallis - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills
Electrical Undergrounding
 Montclair Hills
1896311/1/2026Meghan M Boots Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills
Letter urging OEIS/California Energy Safety to require cumulative wildfire risk review
Electrical Undergrounding
2 page(s)
Office of Energy Infrastructure Safety:Upper Montclair Neighborhood Association
1896211/1/2026Tina Montemayor Opening Comments on PGE Proposed 2028- 2037 Undergrounding Plan - Montclair Hills Tina Montemayor
1896111/1/2026Mechem - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair HIlls
Electrical Undergrounding
2 page(s)
 Curran Mechem Family
1896011/1/2026Danielle ODea - Opening Comments Danielle ODea
1895911/1/2026Joel Baxter - Opening Comments
Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills
Electrical Undergrounding
1 page(s)
 Joel Baxter
1895811/1/2026Mark T. Johnson - Opening Comments on PG&E proposed 2028-2037 Undergrounding Plan - Montclair Hills, Oakland
Letter from Mark T. Johnson re PG&E 2028-2037 Undergrounding Plan
Electrical Undergrounding
2 page(s)
 Mr Mark T. Johnson
1895711/1/2026Public Comment of Brian Wong on PG&E's 2028 to 2037 Undergrounding Plan (Montclair Hills, Oakland)
Comment from a resident of Saroni Drive in the Montclair hills of Oakland requesting undergrounding of overhead distribution lines in the neighborhood, and objecting to the plan's treatment of evacuation constraints and tree fall hazard.
Electrical Undergrounding
1 page(s)
 Resident
1895611/1/2026Jane Wellenkamp - Opening Comments on Proposed 2028-2037 Undergrounding Plan Excluding Montclair Hills Oakland-Montclair Hills Resident
1895511/1/2026Public Comment of Mary Wong on PG&E's 2028 to 2037 Undergrounding Plan (Montclair Hills, Oakland)
Comment from a resident of Saroni Drive in the Montclair hills of Oakland on the adequacy of PG&E's non-undergrounding mitigations, which depend on advance warning, and on evacuation risk to households with children, including school transportation routes on Saroni Drive and Colton Boulevard.
Electrical Undergrounding
1 page(s)
 Montclair Home Resident
1895411/1/2026Kartheek_Naini_Opening_Comments_PGE_EUP Kartheek
1895311/1/2026Linda D Walton - Opening Comments on PG&E's Proposed Undergrounding Plan 2028-2037 (Montclair Hills)
Electrical Undergrounding
2 page(s)
OEISLinda D. Walton
1895211/1/2026Kit Craven - Opening Comments on PG&E's Proposed 2028- 2037 Undergrounding Plan - Montclair Hills Kit Craven
1895111/1/2026Jason Silver Comments
Electrical Undergrounding
 Montclair Hills, Oakland California resident
1894010/30/2026Energy Safety-DR-EUP-26-11
Electrical Undergrounding
 Office of Energy Infrastructure Safety
1893910/30/2026DR EUP-26-10 Wildfire Rebuild Areas OEIS
1893510/30/2026PG&E EUP Comment Schedule for Second Errata Notice
Electrical Undergrounding
 Office of Energy Infrastructure Safety
1892910/30/2026PGE_EUPERR-SUB_2026-10-30_R0
10/30 2nd Substantive Errata
 Pacific Gas and Electric
1892810/30/2026PGE_EUPERR_2026-10-30_Attachment D_R0
10/30 2nd Substantive Errata
 Pacific Gas and Electric
1892710/30/2026PGE_EUPERR-NONSUB_2026-10-30_R0
10/30 Non-Substantive Errata
 Pacific Gas and Electric
1892610/30/2026PGE_EUPERR_2026-10-30_Tabular Data_R0
10/30 Non-Substantive Errata
 Pacific Gas and Electric
1892410/29/2026EUP-PhI_DR_OEIS_004-Q001, 006 PG&E
1892310/29/2026EUP-PhI_DR_OEIS_004-Q002 PG&E
1892210/29/2026EUP-PhI_DR_OEIS_004-Q003, 007-009 PG&E
1892110/29/2026EUP-PhI_DR_OEIS_004-Q005 PG&E
1892010/29/2026EUP-PhI_DR_OEIS_004-Q004 PG&E
1891910/30/2026Peter Marcuzzo Opening Comments
2 page(s)
 Self
1891710/29/2026PG&E EUP Data Report
Electrical Undergrounding
 Office of Energy Infrastructure Safety
1891610/29/20262026-10-29_PGE_2026_DRLOG_V0 Pacific Gas and Electric
1891510/29/2026Can Berk Guder Comments
Electrical Undergrounding
 Can Berk Guder
1891410/29/2026Barbara Rosenfeld Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan - Montclair Hills homeowner
1891210/29/2026Energy Safety-DR-EUP-26-09
CPUC Data Template, Present Value Calculation, Screen 2 BCR Inputs, Risk Modeling
Electrical Undergrounding
 Energy Safety
1890410/28/2026EUP-PhI_DR_OEIS_002-Q001,003 PG&E
1890310/28/2026EUP-PhI_DR_OEIS_002-Q002,004,005 PG&E
1890210/28/2026EUP-PhI_DR_OEIS_003-Q001-004, 008.zip
Electrical Undergrounding
 Pacific Gas and Electric Company
1890110/28/2026EUP-PhI_DR_OEIS_003-Q005.zip
Electrical Undergrounding
 Pacific Gas and Electric Company
1890010/28/2026EUP-PhI_DR_OEIS_003-Q006-007.zip
Electrical Undergrounding
 Pacific Gas and Electric Company
1889610/28/2026Jonathan Osder Opening Comments Resident
1889310/27/2026Opening Comments - Allenby Montclair, Oakland resident
1889210/27/2026Melvin Terry Opening Comments
Resonse to PG&E undergrounding plan
Electrical Undergrounding
2 page(s)
Office of Energy Infrastructure SafetyHome Owner
1889110/27/2026Justin Kasad - Opening Comments on PG&E's Proposed 2028-2037 Undergrounding Plan — Montclair Hills
2 page(s)
 Justin Kasad
1889010/27/2026Michael Lawless Opening Comments
Concerned resident comment
Electrical Undergrounding
 Self
1888910/26/2026Opening Comment - Shawn Nevins Pesonal
1888410/26/2026SOLVED Engineering Inc. Opening Comments — EUP-PGE
2 page(s)
 Solved Engineering Inc.
1886210/23/2026DR-EUP-26-08
DR focused on Screen 2 &3 Alternative Mitigations, Portfolio Project Selection, and new Mitigation Technologies
Electrical Undergrounding
 Energy Safety
1885210/22/20262026-10-22_PGE_2026_DRLOG_V0 Pacific Gas and Electric
1885010/22/2026EUP-PhI_DR_OEIS_001-Q001Supp01
Electrical Undergrounding
 PG&E
1884810/21/2026Energy Safety-DR-EUP-26-07
Electrical Undergrounding
 Energy Safety
1881910/16/2026PG&E EUP Public Workshop Presentation Oct 15 2026 California Office of Energy Infrastructure Safety
1881710/15/20262026-10-15_PGE_2026_DRLOG_V0
Electrical Undergrounding
 Pacific Gas and Electric
1880510/12/2026EUP-PhI_DR_OEIS_001-Q003Atch01.xlsx Pacific Gas and Electric
1880410/12/2026EUP-PhI_DR_OEIS_001-Q003.pdf Pacific Gas and Electric
1880310/12/2026EUP-PhI_DR_OEIS_001-Q002Atch01.xlsx Pacific Gas and Electric
1880110/12/2026EUP-PhI_DR_OEIS_001-Q002.pdf Pacific Gas and Electric
1880010/12/2026EUP-PhI_DR_OEIS_001-Q001.pdf Pacific Gas and Electric
1879910/12/2026PGE_WP032_2026-09-30_Circuit Segment Lists_R0.xlsx Pacific Gas and Electric
1879810/12/2026PGE_WP030_2026-09-30_Unit Cost Methodology_R0.xlsx Pacific Gas and Electric
1879710/12/2026PGE_WP029_2026-09-30_Ignition Likelihood Toy Problem_R0.xlsx Pacific Gas and Electric
1879610/12/2026PGE_WP028_2026-09-30_Ignition Consequence Toy Problem_R0.xlsx Pacific Gas and Electric
1879510/12/2026PGE_WP027_2026-09-30_Wildfire Bow Tie Toy Problem_R0.xlsx Pacific Gas and Electric
1879410/12/2026PGE_WP024_2026-09-30_WBCA Toy Problem_R0.xlsx Pacific Gas and Electric
1879310/12/2026PGE_WP021_2026-09-30_KDMM Formulas_R0.xlsx Pacific Gas and Electric
1879210/12/2026PGE_WP017B_2026-09-30_PSPS Toy Problem Calculations_R0.xlsx Pacific Gas and Electric
1879110/12/2026PGE_WP016B_2026-09-30_EPSS Toy Problem Calculations_R0.xlsx Pacific Gas and Electric
1879010/12/2026PGE_WP014_2026-09-30_Core Capab 7 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1878910/12/2026PGE_WP013_2026-09-30_Core Capab 6 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1878810/12/2026PGE_WP012_2026-09-30_Core Capab 5 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1878710/12/2026PGE_WP011_2026-09-30_Core Capab 4 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1878610/12/2026PGE_WP010_2026-09-30_Core Capab 3 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1878510/12/2026PGE_WP002_2026-09-30_EUP Target Timeline Table_R0.xlsx Pacific Gas and Electric
1878410/12/2026PGE_WP007_2026-09-30_Undergrounding Resource Model_R0.xlsx Pacific Gas and Electric
1878310/12/2026PGE_WP008_2026-09-30_Core Capab 1 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1878210/12/2026EUP-PhI_DR_OEIS_001-Q001Atch01.xlsx Pacific Gas and Electric
1878110/12/2026EUP-PhI_DR_OEIS_001-Q001.pdf Pacific Gas and Electric
1878010/12/2026PGE_WP032_2026-09-30_Circuit Segment Lists_R0.xlsx Pacific Gas and Electric
1877910/12/2026PGE_WP030_2026-09-30_Unit Cost Methodology_R0.xlsx Pacific Gas and Electric
1877810/12/2026PGE_WP029_2026-09-30_Ignition Likelihood Toy Problem_R0.xlsx Pacific Gas and Electric
1877710/12/2026PGE_WP028_2026-09-30_Ignition Consequence Toy Problem_R0.xlsx Pacific Gas and Electric
1877610/12/2026PGE_WP027_2026-09-30_Wildfire Bow Tie Toy Problem_R0.xlsx Pacific Gas and Electric
1877510/12/2026PGE_WP024_2026-09-30_WBCA Toy Problem_R0.xlsx Pacific Gas and Electric
1877410/12/2026PGE_WP021_2026-09-30_KDMM Formulas_R0.xlsx Pacific Gas and Electric
1877310/12/2026PGE_WP009_2026-09-30_Core Capab 2 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1877210/12/2026PGE_WP017B_2026-09-30_PSPS Toy Problem Calculations_R0.xlsx Pacific Gas and Electric
1877110/12/2026PGE_WP016B_2026-09-30_EPSS Toy Problem Calculations_R0.xlsx Pacific Gas and Electric
1877010/12/2026PGE_WP014_2026-09-30_Core Capab 7 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876910/12/2026PGE_WP013_2026-09-30_Core Capab 6 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876810/12/2026PGE_WP012_2026-09-30_Core Capab 5 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876710/12/2026PGE_WP011_2026-09-30_Core Capab 4 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876610/12/2026PGE_WP010_2026-09-30_Core Capab 3 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876510/12/2026PGE_WP009_2026-09-30_Core Capab 2 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876410/12/2026PGE_WP008_2026-09-30_Core Capab 1 Supporting Formulas_R0.xlsx Pacific Gas and Electric
1876310/12/2026PGE_WP007_2026-09-30_Undergrounding Resource Model_R0.xlsx Pacific Gas and Electric
1876210/12/2026PGE_WP002_2026-09-30_EUP Target Timeline Table_R0.xlsx Pacific Gas and Electric
1876110/12/2026PGE_WP031_2026-09-30_OUR Toy Problem_R0.xlsx Pacific Gas and Electric
1876010/12/2026PGE_EUPERR_WP002_2026-10-12_EUP Target Timeline Table_R1.xlsx Pacific Gas and Electric
1875710/12/2026PGE_EUPERR_2026-10-12_R0.pdf PG&E
1875610/12/2026PGE_EUPERR_2026-10-12_Projects_R0.zip
Electrical Undergrounding
 PG&E
1875510/12/2026PGE_EUPERR_2026-10-12_Tabular Data_R0.zip
Electrical Undergrounding
 PG&E
1875410/12/2026PGE_EUPERR_2026-10-12_Attachment D_R0.zip
Electrical Undergrounding
 PG&E
1874810/9/2026AT&T California Data Request Stakeholder Designation
AT&T California's Data Request Stakeholder Designation
Electrical Undergrounding
 AT&T California
1874310/8/2026TURN Stakeholder Request Letter
Request for Data Request Stakeholder Designation
Electrical Undergrounding
1 page(s)
 The Utility Reform Network (TURN)
1873110/8/2026Energy Safety-DR-EUP-26-06
KDMM Calculations, BCR and CPUC Data Template, and Circuit Segment Length
Electrical Undergrounding
 Energy Safety
1871910/2/2026PGE EUP Confidentiality Declaration
Confidentiality declaration for EUP GIS data
Electrical Undergrounding
 OEIS
1870510/1/2026MGRA Stakeholder Designation Request Mussey Grade Road Alliance
1870410/1/2026PG&E-EUP Public Workshop & Comment Schedule Notice California Office of Energy Infrastructure Safety
186989/30/2026Attachment D_SPD-37 Appendix 1 Data Submission Pacific Gas and Electric
186979/30/2026Attachment A_Progress Report 0 Pacific Gas and Electric
186969/30/20262026-09-30_PGE_2026_EUP Vol 2_R0 Pacific Gas and Electric
186959/30/20262026-09-30_PGE_2026_EUP Vol 1_R0 Pacific Gas and Electric