| 17278 | 12/18/2025 | Liberty_2026-2028 Base-WMP_R1_Substantive_Errata Request
| | Liberty Utilities |
| 17273 | 12/17/2025 | Base-WMP-2026-2028 - PG&E Draft Decision - MGRA Comments
| | Mussey Grade Road Alliance |
| 17262 | 12/17/2025 | PGE_Opening_Comments_Draft_Decision_2026-2028_Base_WMP
| | PG&E |
| 17261 | 12/17/2025 | TURN Opening Comments on PG&E 2026-2028 Base WMP Draft Decision
| | The Utility Reform Network (TURN) |
| 17260 | 12/16/2025 | 2026-2028 Base WMP - SDGE Draft Decision - MGRA Comments
| | Mussey Grade Road Alliance |
| 17259 | 12/16/2025 | SDG&E Opening Comments 2026-2028 Base WMP Draft Decision
| | San Diego Gas & Electric |
| 17228 | 12/12/2025 | Revised Discussion Topics - WMP SB 254 Implementation Revised discussion topics for the Virtual Public Workshop to be held on December 17, 2025, to gather feedback and information to aid in the implementation of Senate Bill 254 (SB 254) requirements as they relate to WMP submission. Electrical Infrastructure 4 page(s) | | Office of Energy Infrastructure Safety |
| 17226 | 12/12/2025 | Revised Public Meeting Notice - WMP SB 254 Implementation Revised public meeting notice for the virtual public workshop Energy Safety will hold on December 17, 2025, to gather feedback and information to aid in the implementation of Senate Bill 254 (SB 254) requirements as they relate to WMP submission. Discussion topics for this public workshop will center around the new requirement for WMPs to include an estimated cost-per-avoided ignition for each risk. Electrical Infrastructure 4 page(s) | | Office of Energy Infrastructure Safety |
| 17200 | 12/9/2025 | TBC 2026-2028 Base WMP R2 Redline Corrects reference to initiative target in Table 12.1 on page 191. | | Trans Bay Cable LLC |
| 17199 | 12/9/2025 | TBC 2026-2028 Base WMP R2 Clean Corrects reference to initiative target in Table 12.1 on page 191. | | Trans Bay Cable LLC |
| 17198 | 12/9/2025 | HWT 2026-2028 Base WMP R2 Redline
| | Horizon West Transmission LLC |
| 17197 | 12/9/2025 | HWT 2026-2028 Base WMP R2 Clean
| | Horizon West Transmission LLC |
| 17196 | 12/9/2025 | HWT 2026-2028 Base WMP R2 Cover Letter and Response to Notice on Errata
| | Horizon West Transmission LLC |
| 17194 | 12/9/2025 | TBC 2026-2028 Base WMP R2 Redline
| | Trans Bay Cable LLC |
| 17193 | 12/9/2025 | TBC 2026-2028 Base WMP R2 Clean
| | Trans Bay Cable LLC |
| 17192 | 12/9/2025 | TBC 2026-2028 Base WMP R2 Response to Notice on Errata
| | Trans Bay Cable LLC |
| 17189 | 12/9/2025 | Liberty_Application Confidentiality of 2026-2028 Base-WMP_R1
| | Liberty Utilities |
| 17188 | 12/8/2025 | Discussion Topics - WMP SB 254 Implementation Discussion topics for the Virtual Public Workshop to be held on December 17, 2025 to gather feedback and information to aid in the implementation of Senate Bill 254 (SB 254) requirements as they relate to WMP submission. Electrical Infrastructure 3 page(s) | | Office of Energy Infrastructure Safety |
| 17164 | 12/5/2025 | Public Meeting Notice - WMP SB 254 Implementation Energy Safety will hold a virtual public workshop on December 17, 2025, to gather feedback and information to aid in the implementation of Senate Bill 254 (SB 254) requirements as they relate to WMP submission. Discussion topics for this public workshop will center around the new requirement for WMPs to include an estimated cost-per-avoided ignition for each risk. Electrical Infrastructure 3 page(s) | | Office of Energy Infrastructure Safety |
| 17158 | 12/4/2025 | Liberty_Application Confidentiality of 2026-2028 Base-WMP
| | Liberty Utilities |
| 17157 | 12/4/2025 | Liberty_2026-2028 Base-WMP_Tables_R1
| | Liberty Utilities |
| 17156 | 12/4/2025 | Liberty_2026-2028 Base-WMP_R1_Redlined REDACTED
| | Liberty Utilities |
| 17155 | 12/4/2025 | Liberty_2026-2028 Base-WMP_R1_Clean REDACTED
| | Liberty Utilities |
| 17154 | 12/4/2025 | Liberty 2026-2028 Base WMP - Revision Notice Response
| | Liberty Utilities |
| 17153 | 12/4/2025 | Liberty_2026-2028 Base-WMP_R1_Cover Letter
| | Liberty Utilities |
| 17128 | 11/26/2025 | Errata Notice on PG&E 2026-2028 Base WMP Notice on Errata for Pacific Gas and Electric Company 2026-2028 Base Wildfire Mitigation Plan. Revised submission is due December 30, 2025. | | Office of Energy Infrastructure Safety |
| 17127 | 11/26/2025 | Draft Decision for PG&E 2026-2028 Base WMP Draft Decision for Pacific Gas and Electric Company 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on December 17, 2025, reply comments are due December 30, 2025. | | Office of Energy Infrastructure Safety |
| 17124 | 11/26/2025 | PacifiCorp 2026-2028 Base WMP Appendix G Attachments R1
| | PacifiCorp |
| 17123 | 11/26/2025 | PacifiCorp 2026-2028 Base WMP Appendix F Attachments R1
| | PacifiCorp |
| 17122 | 11/26/2025 | PC 2026-2028 Base WMP Data Tables R1 Clean
| | PacifiCorp |
| 17121 | 11/26/2025 | PC 2026-2028 Base WMP Data Tables R1 Redline
| | PacifiCorp |
| 17120 | 11/26/2025 | PC 2026-2028 Base WMP R1 Clean
| | PacifiCorp |
| 17119 | 11/26/2025 | PC 2026-2028 Base WMP R1 Redline
| | PacifiCorp |
| 17118 | 11/26/2025 | PacifiCorp Revision Notice Response 2026-2028 Base WMP
| | PacifiCorp |
| 17116 | 11/25/2025 | Draft Decision for SDG&E 2026-2028 Base WMP Draft Decision for SDG&E 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on December 16, 2025, and reply comments are due December 29, 2025. | | Office of Energy Infrastructure Safety |
| 17107 | 11/21/2025 | LSPGC_Non-Substantive_Errata_Cover_Letter_11_21
| | LSPower |
| 17106 | 11/21/2025 | LSPGC_2026-2028_BASE-WMP_R1
| | LSPower |
| 17102 | 11/21/2025 | The Second Errata Notice on the TBC 2026-2028 Base WMP Notice on Errata for the Trans Bay Cable 2026-2028 Base Wildfire Mitigation Plan. Revised submission due December 9, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 17101 | 11/21/2025 | Draft Decision for TBC 2026-2028 Base WMP Draft Decision for the Trans Bay Cable 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on December 15, 2025, and reply comments are due December 26, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 17100 | 11/21/2025 | The Second Errata Notice on the HWT 2026-2028 Base WMP Notice on Errata for the Horizon West Transmission 2026-2028 Base Wildfire Mitigation Plan. Revised submission due December 9, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 17099 | 11/21/2025 | Draft Decision for HWT 2026-2028 Base WMP Draft Decision for the Horizon West Transmission 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on December 15, 2025, and reply comments are due December 26, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 17067 | 11/14/2025 | Errata Notice on the LSPGC 2026-2028 Base WMP Notice on Errata for the LS Power Grid California 2026-2028 Base Wildfire Mitigation Plan. Revised submission due November 21, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 17066 | 11/14/2025 | Draft Decision for LSPGC 2026-2028 Base WMP Draft Decision for the LS Power Grid California 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on December 8, 2025, and reply comments are due December 18, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 16943 | 11/7/2025 | Fourth Revised 2026-2028 Base WMP Schedule Fourth revised schedule for the 2026-2028 Base WMP submissions and evaluations. Revisions made to extend the dates by which Energy Safety will issue draft Decisions for PG&E and SDG&E. Electrical Infrastructure 4 page(s) | | Office of Energy Infrastructure Safety |
| 16942 | 11/7/2025 | Energy Safety's Response Liberty Time Extension Request Energy Safety's approval of Liberty Utilities' time extension request for its Revision Notice Response. New due dates and comment period are updated in the letter. | | Office of Energy Infrastructure Safety |
| 16927 | 11/5/2025 | Liberty Extension Request for WMP Revision Notice Response
| | Liberty Utilities |
| 16924 | 11/4/2025 | Decision on BVES 2026-2028 Base WMP Decision approving the Bear Valley Electric Service, INC. 2026-2028 Base Wildfire Mitigation Plan. | | Office of Energy Infrastructure Safety |
| 16896 | 10/27/2025 | SCE 2026-2028 Base WMP R2 SCE 2026-2028 Base WMP R2 | | Southern California Edison |
| 16895 | 10/27/2025 | SCE 2026-2028 WMP Nonsubstantive Errata 10 27 2025 SCE 2026-2028 WMP Nonsubstantive Errata 10 27 2025 | | Southern California Edison |
| 16860 | 10/22/2025 | BVES_OpeningComments_BVES_2026-2028_Base-WMP_R1 Letter regarding BVES Opening Comments to the Office of Energy Infrastructure Safety’s Revised Draft Decision for Bear Valley Electric Service, Inc.’s 2026-2028 Base Wildfire Mitigation Plan 1 page(s) | Tony Marino, Deputy Director | Bear Valley Electric Service, Inc. |
| 16851 | 10/21/2025 | Revision Notice on the Liberty 2026-2028 Base WMP Revision Notice on the Liberty Utilities 2026-2028 Base Wildfire Mitigation Plan. Liberty's response is due November 20, 2025. | | Office of Energy Infrastructure Safety |
| 16835 | 10/13/2025 | Revision Notice for PacifiCorp 2026-2028 Base WMP Revision Notice for PacifiCorp's 2026-2028 Wildfire Mitigation Plan. A response is due November 26, 2025. | | Office of Energy Infrastructure Safety |
| 16829 | 10/10/2025 | Revised Draft Decision for BVES 2026-2028 Base WMP Revised Draft Decision for BVES 2026-2028 Base WMP. Opening comments must be submitted no later than October 22, 2025. Reply comments must be submitted no later than October 27, 2025. Electrical Infrastructure 102 page(s) | | Office of Energy Infrastructure Safety |
| 16798 | 9/30/2025 | SDG&E_2026-2028_Base-WMP_SDGE Tables_R2
| | San Diego Gas & Electric |
| 16797 | 9/30/2025 | SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R2
| | San Diego Gas & Electric |
| 16796 | 9/30/2025 | SDG&E_2026-2028_Base-WMP_Appendix G Supporting Data_R2
| | San Diego Gas & Electric |
| 16795 | 9/30/2025 | SDG&E_2026-2028_Base-WMP_R2
| | San Diego Gas & Electric |
| 16794 | 9/30/2025 | 2025-09-30_SDGE_2026-2028_Base-WMP_Cover_Letter_R2 Enclosed is SDG&E's revised 2026-2028 Base WMP R2 as directed by Energy Safety's Notice on Errata issued on September 16, 2025. | | San Diego Gas & Electric |
| 16744 | 9/16/2025 | HWT_2026-2028_ Base_WMP_R1 Redline
| | Horizon West Transmission LLC |
| 16743 | 9/16/2025 | HWT_2026-2028_ Base_WMP_R1 Clean
| | Horizon West Transmission LLC |
| 16742 | 9/16/2025 | HWT_2026-2028_Base WMP_R1_Cover Letter and Revision Notice Response
| | Horizon West Transmission LLC |
| 16741 | 9/16/2025 | TBC_2026-2028_ Base_WMP_R1 Redline
| | Trans Bay Cable LLC |
| 16740 | 9/16/2025 | TBC_2026-2028_ Base_WMP_R1 Clean
| | Trans Bay Cable LLC |
| 16739 | 9/16/2025 | TBC_20262028_BaseWMP_R1_Cover Letter and Revision Notice Response
| | Trans Bay Cable LLC |
| 16738 | 9/16/2025 | Notice on Errata for SDG&E 2026-2028 Base WMP Notice on Errata for the San Diego Gas and Electric Company 2026-2028 Base Wildfire Mitigation Plan. Revised submission due September 30, 2025 | | Office of Energy Infrastructure Safety |
| 16734 | 9/15/2025 | SCE 2026-2028 Base WMP R1 Tables - Appendices SCE 2026-2028 Base WMP R1 Tables - Appendices | | Southern California Edison |
| 16733 | 9/15/2025 | SCE 2026-2028 Base WMP R1 Tables - Chapters 7 to 13 SCE 2026-2028 Base WMP R1 Tables - Chapters 7 to 13 | | Southern California Edison |
| 16732 | 9/15/2025 | SCE 2026-2028 Base WMP R1 Tables - Chapters 1 to 6 SCE 2026-2028 Base WMP R1 Tables - Chapters 1 to 6 | | Southern California Edison |
| 16731 | 9/15/2025 | SCE 2026-2028 Base WMP R1 - Redline Version SCE 2026-2028 Base WMP R1 - Redline Version | | Southern California Edison |
| 16730 | 9/15/2025 | SCE 2026-2028 Base WMP R1 SCE 2026-2028 Base WMP Rev.1 | | Southern California Edison |
| 16729 | 9/15/2025 | SCE 2026-2028 Base WMP R1 Cover Letter and Revision Notice Response SCE 2026-2028 Base WMP R1 Cover Letter and Revision Notice Response | | Southern California Edison |
| 16712 | 9/9/2025 | PGE_2026-2028_Base-WMP_Atch02_R2
| | PG&E |
| 16711 | 9/9/2025 | PGE_2026-2028_Base-WMP_Vol1_R2 – Redline
| | PG&E |
| 16710 | 9/9/2025 | PGE_2026-2028_Base-WMP_Vol1_R2
| | PG&E |
| 16709 | 9/9/2025 | PGE_2026-2028_Revision Notice Response_R1 – Redline
| | PG&E |
| 16708 | 9/9/2025 | PGE_2026-2028_Revision Notice Response_R1
| | PG&E |
| 16707 | 9/9/2025 | PG&E's 2026-2028 Base Wildfire Mitigation Plan RNR Non-Substantive Errata_R1
| | PG&E |
| 16706 | 9/8/2025 | TBC 2026-2028 Base WMP R0 Non-Substantive Errata
| | Trans Bay Cable LLC |
| 16705 | 9/8/2025 | HWT 2026-2028 Base WMP R0 Non-Substantive Errata
| | Horizon West Transmission LLC |
| 16703-1 | 9/8/2025 | LSPGC_2026-2028_BASE-WMP_R0_Redline
| | LSPower |
| 16703-2 | 9/8/2025 | LSPGC_Non-Substantive_Errata_Cover_Letter_09_08
| | LSPower |
| 16702 | 9/5/2025 | PG&E's 2026-2028 Base Wildfire Mitigation Plan RNR Non-Substantive Errata
| | PG&E |
| 16681 | 9/2/2025 | Errata Notice on the TBC 2026-2028 Base WMP Notice on Errata for the Trans Bay Cable 2026-2028 Base Wildfire Mitigation Plan. Revised submission due September 16, 2025. Electrical Infrastructure | | Office of Infrastructure Energy Safety |
| 16680 | 9/2/2025 | Errata Notice on the HWT 2026-2028 Base WMP Notice on Errata for the Horizon West Transmission 2026-2028 Base Wildfire Mitigation Plan. Revised submission due September 16, 2025. Electrical Infrastructure | | Office of Infrastructure Energy Safety |
| 16671 | 8/29/2025 | 2026-2028 Base WMP PacifiCorp Reply Comments 8-29-25
| | PacifiCorp |
| 16630 | 8/22/2025 | GPI Comments on PacifiCorp 2026-2028 Base WMP
| | Green Power Institute |
| 16625 | 8/22/2025 | Pacific Gas and Electric Company’s_ReplyComments_PGE_2026-2028_RNR_R0
| | PG&E |
| 16620 | 8/22/2025 | PC_2026-2028_Base-WMP_R0_Redline
| | PacifiCorp |
| 16619 | 8/22/2025 | 8-22-25 PAC 2026-2028 Base WMP Non-Substantive Errata Cover Letter
| | PacifiCorp |
| 16576 | 8/19/2025 | BVES_2026-2028_Base-WMP_R1 Nonsubstantive_errata Submission of BVES’s 2026-2028 Wildfire Mitigation Plan Revision 1 Non-
Substantive Errata 3 page(s) | Tony Marino, Deputy Director | Bear Valley Electric Service, Inc. |
| 16560 | 8/15/2025 | Third Revised 2026 - 2028 Base WMP Schedule Third revised schedule for the 2026-2028 Base WMP submissions and evaluations. Revisions made to extend the dates by which Energy Safety will issue draft Decisions or Revision Notices for all remaining electrical corporations’ 2026-2028 Base WMPs. Electrical Infrastructure 5 page(s) | | Office of Energy Infrastructure Safety |
| 16556 | 8/15/2025 | Revision Notice for SCE 2026-2028 Base WMP Revision Notice for Southern California Edison Company's 2026-2028 Wildfire Mitigation Plan. A response is due September 15, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 16545 | 8/14/2025 | 2025_08_14_SDGE_ReplyComments_2026-2028_Base-WMP_R1
| | San Diego Gas & Electric |
| 16525 | 8/12/2025 | MGRA Comments on PG&E 2026-2028 Base WMP Revision Notice Response
| | Mussey Grade Road Alliance |
| 16524 | 8/12/2025 | COMMENTS OF THE UTILITY REFORM NETWORK ON PG&E 2026–2028 BASE WMP RESPONSE TO REVISION NOTICE
| | The Utility Reform Network |
| 16522 | 8/8/2025 | LSPGC_2026-2028_Base-WMP_Tables_R0_Errata_REDLINE
| | LSPower |
| 16521 | 8/8/2025 | LSPGC_2026-2028_BASE-WMP_R0_Redline
| | LSPower |
| 16520 | 8/8/2025 | LSPGC_Substantive_Errata_Cover_Letter_08_08
| | LSPower |
| 16518 | 8/8/2025 | GPI Comments on Liberty 2026-2028 Base WMP
| | Green Power Institute |
| 16472 | 8/5/2025 | BVES_OpeningComments_BVES_2026-2028_Base-WMP_R0 Opening Comments on Office of Energy Infrastructure Safety’s Draft Decision for Bear Valley Electric Service, Inc.’s 2026-2028 Base Wildfire Mitigation Plan 1 page(s) | Tony Marino, Deputy Director | Bear Valley Electric Service, Inc. |
| 16471 | 8/5/2025 | GPI Comments on BVES 2026-2028 Base WMP Draft Decision
| | Green Power Institute |
| 16469 | 8/4/2025 | SDGE 2026-2028 Base WMP R1 - MGRA Comments MGRA files these comments pursuant to the July 9, 2025, Approval of San Diego Gas & Electric Company’s Extension Request to Resubmit its 2026-2028 Base Wildfire Mitigation Plan. | | Mussey Grade Road Alliance |
| 16465 | 8/1/2025 | Second WMP Stakeholder Workshop Recording and Slides Workshop slides and links to the recording for the Second Workshop on 2026-2028 Base Wildfire Mitigation Plans of Liberty Utilities, PacifiCorp, LS Power Grid California, Horizon West Transmission, and Trans Bay Cable, held on July 29, 2025. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 16428 | 7/29/2025 | PC_2026-2028_Base-WMP_Data_Tables_R0_Redline
| | PacifiCorp |
| 16427 | 7/29/2025 | PC_2026-2028_Base-WMP_R0_Redline
| | PacifiCorp |
| 16426 | 7/29/2025 | PacifiCorp Substantive Errata Cover Letter 7-29-25
| | PacifiCorp |
| 16425 | 7/29/2025 | Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan - Attachment 2
| | Bear Valley Electric Service, Inc. |
| 16424 | 7/29/2025 | Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan - Attachment 1
| | Bear Valley Electric Service, Inc. |
| 16423 | 7/29/2025 | Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan R1 Revised BVVES 2026-2028 Base WMP R1 based on letter dated July 22, 2025 | | Bear Valley Electric Service, Inc. |
| 16415 | 7/28/2025 | PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 2 - Revision 1 - REDLINE
| | PG&E |
| 16414 | 7/28/2025 | PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 1 - Revision 1 - REDLINE
| | PG&E |
| 16413 | 7/28/2025 | PGE_2026-2028_Base-WMP_Atch02_R1
| | PG&E |
| 16412 | 7/28/2025 | PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 2 - Revision 1
| | PG&E |
| 16411 | 7/28/2025 | PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 1 - Revision 1
| | PG&E |
| 16410 | 7/28/2025 | PG&E's 2026-2028 Wildfire Mitigation Plan - Revision Notice Response
| | PG&E |
| 16409 | 7/25/2025 | TBC_2026-2028_ Base_WMP_Table Data_R0
| | Trans Bay Cable LLC |
| 16408 | 7/28/2025 | TBC_2026-2028_ Base_WMP_R0
| | Trans Bay Cable LLC |
| 16407 | 7/28/2025 | Application for Confidential Treatment- TBC 2025-07-25
| | Trans Bay Cable LLC |
| 16399 | 7/28/2025 | Application for Confidential Treatment HWT 2025-07-25.
| | Horizon West Transmission LLC |
| 16398 | 7/25/2025 | HWT_2026-2028_ Base_WMP_Table Data
| | Horizon West Transmission LLC |
| 16397 | 7/28/2025 | HWT_2026-2028_ Base_WMP_R0 REDACTED
| | Horizon West Transmission LLC |
| 16396 | 7/25/2025 | HWT_2026-2028_ Base_WMP_Cover Letter
| | Horizon West Transmission LLC |
| 16380 | 7/25/2025 | LSPGC_Applicaton_Confidentiality_2026_2028_Base_WMP
| | LSPower |
| 16379 | 7/25/2025 | LSPGC Substation Defensible Space
| | LSPower |
| 16378 | 7/25/2025 | LSPG MAINTENANCE PLAN_REV 2.1
| | LSPower |
| 16377 | 7/25/2025 | LSPG TVMP Procedure v1
| | LSPower |
| 16376 | 7/25/2025 | LSPGC_2026-2028_Base-WMP_Tables_R0
| | LSPower |
| 16375 | 7/25/2025 | LSPGC_2026-2028_Base-WMP_R0
| | LSPower |
| 16374 | 7/25/2025 | LSPGC_2026-2028_Base-WMP_Cover_Letter
| | LSPower |
| 16373 | 7/25/2025 | TBC_2026-2028_ Base_WMP_Cover Letter
| | Trans Bay Cable LLC |
| 16346 | 7/23/2025 | SDG&E_2026-2028_Base-WMP_SDGE Tables_R1.1 SDG&E is submitting revised Excel files for both its SDGE Tables and OEIS Guidelines Tables which reflect minor corrections to align with tables provided in SDG&E_2026-2028_Base-WMP_R1. | | San Diego Gas & Electric |
| 16345 | 7/23/2025 | SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R1.1 SDG&E is submitting revised Excel files for both its SDGE Tables and OEIS Guidelines Tables which reflect minor corrections to align with tables provided in SDG&E_2026-2028_Base-WMP_R1. | | San Diego Gas & Electric |
| 16322 | 7/22/2025 | Notice on Errata for BVES 2026-2028 Base WMP Notice on Errata for the Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan. Revised submission due July 29, 2025 | | Office of Energy Infrastructure Safety |
| 16297 | 7/18/2025 | SDG&E_2026-2028_Base-WMP_SDGE Tables_R1
| | San Diego Gas & Electric |
| 16296 | 7/18/2025 | SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R1
| | San Diego Gas & Electric |
| 16295 | 7/18/2025 | SDG&E_2026-2028_Base-WMP_Appendix G Supporting Data_R1
| | San Diego Gas & Electric |
| 16294 | 7/18/2025 | SDG&E_2026-2028_Base-WMP_R1
| | San Diego Gas & Electric |
| 16293 | 7/18/2025 | 2025-07-18_SDGE_2026-2028_Base-WMP_Cover_Letter_R1
| | San Diego Gas & Electric |
| 16273 | 7/16/2025 | Draft Decision for the BVES 2026-2028 Base WMP Draft Decision for the BVES 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on August 5, 2025 and reply comments are due August 15, 2025. | | Office of Energy Infrastructure Safety |
| 16258 | 7/11/2025 | PacifiCorp 2026-2028 Base WMP Data Tables
| | PacifiCorp |
| 16257 | 7/11/2025 | PacifiCorp 2026-2028 Base WMP Appendix G Attachments
| | PacifiCorp |
| 16256 | 7/11/2025 | 2026-2028 Base WMP 2026-2028 Base WMP Appendix F Attachments
| | PacifiCorp |
| 16255 | 7/11/2025 | PacifiCorp 2026-2028 Base WMP RO
| | PacifiCorp |
| 16254 | 7/11/2025 | PacifiCorp 2026-2028 Base WMP Cover Letter
| | PacifiCorp |
| 16226 | 7/9/2025 | Approval of SDG&E's Extension Request for 2026-2028 Base WMP Resubmission Approval of San Diego Gas & Electric Company’s Extension Request to Resubmit its 2026-2028 Base WMP. | | Office of Energy Infrastructure Safety |
| 16206 | 7/7/2025 | SCE Reply Comments 2026-2028 Base WMP_R0 SCE Reply Comments 2026-2028 Base WMP R0 | | Southern California Edison |
| 16204 | 7/7/2025 | Public Meeting Notice - 2026-2028 Base WMP Second Workshop Energy Safety will hold a virtual public workshop on Tuesday, July 29, 2025, on the 2026-2028 Base WMPs for Liberty, PacifiCorp, Horizontal West Transmission, Trans Bay Cable, and LS Power Electrical Infrastructure. Electrical Infrastructure 5 page(s) | | Office of Energy Infrastructure Safety |
| 16170 | 6/30/2025 | SCE 2026 2028 Base WMP R0 Nonsubstantive Errata Nonsubstantive Errata | | Southern California Edison |
| 16163 | 6/27/2025 | GPI Comments on SCE 2026-2028 Base WMP
| | Green Power Institute |
| 16156 | 6/27/2025 | Resilient Structures Public Comments on SCE 2026-2028 Base WMP
| | Resilient Structures |
| 16155 | 6/27/2025 | 2025-06-27 RCRC Opening Comments SCE 2026-2028 WMP R0
2 page(s) | | Rural County Representatives of California |
| 16152 | 6/27/2025 | MGRA Comments on SCE 2026-2028 WMP
| | Mussey Grade Road Alliance |
| 16151 | 6/27/2025 | Revision Notice for PG&E 2026-2028 Base WMP Revision Notice for Pacific Gas and Electric Company's 2026-2028 Wildfire Mitigation Plan. A response is due July 28, 2025. | | Office of Energy Infrastructure Safety |
| 16150 | 6/27/2025 | Liberty_Application Confidentiality of 2026-2028 Base-WMP
| | Liberty Utilities |
| 16149 | 6/27/2025 | Liberty_2026-2028 Base-WMP_Tables_R0
| | Liberty Utilities |
| 16148 | 6/27/2025 | Liberty_2026-2028_Base-WMP_R0
| | Liberty Utilities |
| 16147 | 6/27/2025 | Liberty_2026-2028 Base-WMP_Cover Letter
| | Liberty Utilities |
| 16122 | 6/24/2025 | Rejection and Order to Resubmit for SDGE 2026-2028 Base WMP Energy Safety rejects the SDG&E 2026-2028 Base Wildfire Mitigation Plan (WMP) submission dated May 2, 2025, and orders SDG&E to resubmit its 2026-2028 Base WMP by July 11, 2025. | | Office of Energy Infrastructure Safety |
| 16111 | 6/20/2025 | SDG&E Reply Comments on 2026-2028 WMP
| | San Diego Gas and Electric |
| 16048 | 6/16/2025 | 2025-06-16_SDGE_2026-2028_Base-WMP_Non-substantive_Errata SDG&E's non-substantive errata to its 2026-2028 Base WMP R0. | | San Diego Gas & Electric |
| 16041 | 6/13/2025 | Comments on SDGE 2026-2028 Base WMP R0
| | Green Power Institute |
| 16032 | 6/13/2025 | MGRA Comments on SDGE 2026-2028 Base WMP R0
| | Mussey Grade Road Alliance |
| 15959 | 6/6/2025 | ReplyComments from BVES_2026-2028_Base-WMP_R0 BVES reply comments to Green Power Institue on BVES 2026-2028 Base WMP R0 4 page(s) | Caroline Thomas Jacobs | Bear Valley Electric Service, Inc. |
| 15946 | 5/16/2025 | SCE 2026 WMP Confidentiality Application Supporting Documents SCE 2026 WMP Confidentiality Application Supporting Documents | | Southern California Edison |
| 15938 | 6/2/2025 | 2025-06-02 SCE 2026-2028 Base WMP Errata 2025-06-02 SCE 2026-2028 Base WMP Errata | | Southern California Edison |
| 15936 | 6/2/2025 | Pacific Gas and Electric Company’s_ReplyComments_PGE_2026-2028_Base-WMP_R0 On May 23, 2025, four stakeholders submitted comments on PG&E's 2026-2028 Base WMP. These reply comments address specific issues raised by these four stakeholders. | | PG&E |
| 15935 | 6/2/2025 | BVES_2026-2028_Base-WMP_R0 Nonsubstantive_errata
| Tony Marino | Bear Valley Electric Service, Inc. |
| 15929 | 5/30/2025 | GPI Comments on BVES 2026-2028 WMP
| | Green Power Institute |
| 15905 | 5/23/2025 | First WMP Stakeholder Workshop Recording and Slides Workshop slides and links to recordings for First Workshop on 2026-2028 Base Wildfire Mitigation Plans of Pacific Gas and Electric, Bear Valley Electric Service, Inc., San Diego Gas & Electric, and Southern California Edison, held on May 21, 2025. Electrical Infrastructure | | Office of Infrastructure Energy Safety |
| 15902 | 5/23/2025 | GPI Comments on PG&E 2026-2028 Base WMP
| | Green Power Institute |
| 15887 | 5/23/2025 | Opening Comments of the Rural County Representatives of California on PG&E 2026-2028 Base Wildfire Mitigation Plan R0
Electrical Infrastructure 4 page(s) | Caroline Thomas Jacobs | Rural County Representatives of California |
| 15886 | 5/23/2025 | OPENING COMMENTS OF THE UTILITY REFORM NETWORK ON PACIFIC GAS AND ELECTRIC COMPANY’S 2026–2028 BASE WILDFIRE MITIGATION PLAN
| | The Utility Reform Network |
| 15885 | 5/23/2025 | MGRA 2026-2028 Base WMP P&GE Comments
| | Mussey Grade Road Alliance |
| 15872 | 5/16/2025 | SDG&E_2026-2028_Base-WMP Appendix G Supporting Data Errata
| | San Diego Gas & Electric |
| 15871 | 5/16/2025 | 2025-05-16_SDGE_2026-2028_Base-WMP Errata Substantive and Non-substantive Errata | | San Diego Gas & Electric |
| 15861 | 5/16/2025 | SCE_2026_Survey_R0 Southern California Edison Maturity Model Survey | | Southern California Edison |
| 15860-1 | 5/16/2025 | QCP-006 r5 03 13 2024 QCP-006 r5 03 13 2024 | | Southern California Edison |
| 15860-2 | 5/16/2025 | QCP-007 r5 03 13 2024 QCP-007 r5 03 13 2024 | | Southern California Edison |
| 15860-3 | 5/16/2025 | QCP-010 r5 03 13 2024 QCP-010 r5 03 13 2024 | | Southern California Edison |
| 15860-4 | 5/16/2025 | AHP v4 12 2024 Redacted AHP v4 12 2024 Redacted | | Southern California Edison |
| 15860-5 | 5/16/2025 | DIMP Manual 10 25 2024 DIMP Manual 10 25 2024 | | Southern California Edison |
| 15860-6 | 5/16/2025 | QCP-014 r1 03 13 2024 QCP-014 r1 03 13 2024 | | Southern California Edison |
| 15860-7 | 5/16/2025 | QCP-015 r1 03 13 2024 QCP-015 r1 03 13 2024 | | Southern California Edison |
| 15860-8 | 5/16/2025 | SCE Covered Conductor Compendium SCE Covered Conductor Compendium | | Southern California Edison |
| 15860-9 | 5/16/2025 | SOM Manual 11 22 2024 SOM Manual 11 22 2024 | | Southern California Edison |
| 15860-10 | 5/16/2025 | TIMP Manual 12 20 2024 TIMP Manual 12 20 2024 | | Southern California Edison |
| 15860-11 | 5/16/2025 | UVM-02 v8 04 01 2024 UVM-02 v8 04 01 2024 | | Southern California Edison |
| 15860-12 | 5/16/2025 | UVM-03 v6 04 01 2024 UVM-03 v6 04 01 2024 | | Southern California Edison |
| 15860-13 | 5/16/2025 | UVM-04 v3 04 01 2024 UVM-04 v3 04 01 2024 | | Southern California Edison |
| 15860-14 | 5/16/2025 | UVM-05 v2 05 17 2019 UVM-05 v2 05 17 2019 | | Southern California Edison |
| 15860-15 | 5/16/2025 | SCE Notice of Availability SCE Notice of Availability | | Southern California Edison |
| 15860-16 | 5/16/2025 | UVM-06 v2 05 17 2019 UVM-06 v2 05 17 2019 | | Southern California Edison |
| 15860-17 | 5/16/2025 | UVM-07 v10 03 24 2025 UVM-07 v10 03 24 2025 | | Southern California Edison |
| 15860-18 | 5/16/2025 | UVM-08 v16 03 24 2025 UVM-08 v16 03 24 2025 | | Southern California Edison |
| 15860-19 | 5/16/2025 | UVM-18 v1 12 06 2021 UVM-18 v1 12 06 2021 | | Southern California Edison |
| 15860-20 | 5/16/2025 | UVM-20 v4 03 24 2025 UVM-20 v4 03 24 2025 | | Southern California Edison |
| 15860-21 | 5/16/2025 | VM Operations Storm Manual v1 12 13 2024 VM Operations Storm Manual v1 12 13 2024 | | Southern California Edison |
| 15859-1 | 5/16/2025 | SCE 2026-2028 Base WMP Tables - Chapters 1 to 6 SCE 2026-2028 Base WMP Tables - Chapters 1 to 6 | | Southern California Edison |
| 15859-2 | 5/16/2025 | SCE 2026-2028 Base WMP Tables - Chapters 7 to 13 SCE 2026-2028 Base WMP Tables - Chapters 7 to 13 | | Southern California Edison |
| 15858 | 5/16/2025 | SCE 2026-2028 Base WMP R0 Southern California Edison 2026-2028 Base Wildfire Mitigation Plan R0 | | Southern California Edison |
| 15857 | 5/16/2025 | 2025-05-16 PGE 2026-2028 Base WMP Non-substantive Errata PG&E’s 2026-2028 Base Wildfire Mitigation Plan Non-substantive Errata | | PG&E |
| 15832 | 5/14/2025 | Second Revised 2026-2028 Base WMP Schedule Second revised schedule for the 2026-2028 Base WMP submissions and evaluations. Revisions made to 1) extend PG&E reply comment due date to account for the 5/26/25 holiday and 2) provide the specific date for the first WMP workshop. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
| 15776 | 5/2/2025 | Public Meeting Notice - 2026-2028 Base WMP Workshop Energy Safety will hold a virtual public workshop on Wednesday, May 21, 2025, on the 2026-2028 Base WMPs for PG&E, Bear Valley, SDG&E, and SCE Electrical Infrastructure 4 page(s) | | Office of Energy Infrastructure Safety |
| 15771 | 5/2/2025 | SDG&E_2026-2028_Base-WMP_Appendix G Supporting Data_R0 Supporting data for SDG&E's 2026-2028 Base WMP Appendix G | | San Diego Gas & Electric |
| 15770 | 5/2/2025 | SDG&E_2026-2028_Base-WMP_SDGE Tables_R0 SDG&E's 2026-2028 Base WMP Tables | | San Diego Gas & Electric |
| 15769 | 5/2/2025 | SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R0 SDG&E's 2026-2028 Base WMP OEIS Guideline Tables | | San Diego Gas & Electric |
| 15768 | 5/2/2025 | SDG&E_2026-2028_Base-WMP_R0 SDG&E's 2026-2028 Base WMP | | San Diego Gas & Electric |
| 15767 | 5/2/2025 | 2025-05-02_SDGE_2026-2028_Base-WMP_Cover_Letter_R0 SDG&E's 2026-2028 Base WMP Cover Letter | | San Diego Gas & Electric |
| 15675 | 4/18/2025 | PG&E 2026-2028 Base WMP Substantive Errata Pursuant to Section 7 of Energy Safety Policy Division Process Guidelines, PG&E hereby submits its substantive errata for
the 2026-2028 WMP. | | PG&E |
| 15674 | 4/18/2025 | BVES_2026-2028_Base-WMP_Atch02_R0 Excel File for BVES 2026-2028 Base WMP Tables | | Bear Valley Electric Service, Inc. |
| 15673 | 4/18/2025 | BVES_2026-2028_Base-WMP_Atch01_R0 Cover Letter to BVES 2026-2028 Base WMP | | Bear Valley Electric Service, Inc. |
| 15672 | 4/18/2025 | BVES_2026-2028_Base-WMP_R0 BVES 2026-2028 Base WMP Revision 0 | | Bear Valley Electric Service, Inc. |
| 15601 | 4/4/2025 | PG&E's 2026-2028 Base WMP R0 Atch02
| | PG&E |
| 15600 | 4/4/2025 | PG&E's 2026-2028 Base WMP R0 Atch01
| | PG&E |
| 15599 | 4/4/2025 | PG&E's 2026-2028 Base WMP R0 - Volume 2
| | PG&E |
| 15598 | 4/4/2025 | PG&E's 2026-2028 Base WMP R0 - Volume 1
| | PG&E |
| 15470 | 3/17/2025 | MGRA Request for Stakeholder Designation.
| | Mussey Grade Road Alliance |
| 15415 | 2/25/2025 | Public Advocates Office Request for Stakeholder Designation
| | California Public Utilities Commission |
| 15409 | 2/24/2025 | Revised 2026-2028 Base WMP Schedule Revised schedule for the 2026-2028 Base WMP submissions and evaluations.
Revisions made to provide due dates for Maturity Survey responses and adjust PG&E comment period to account for workshops. | | Office of Energy Infrastructure Safety |
| 15408 | 2/24/2025 | TURN Stakeholder Designation Letter Requests Stakeholder Designation for 2026-2028 WMPs Electrical Infrastructure 1 page(s) | Energy Safety | TURN |
| 15245 | 1/27/2025 | 2026-2028 Base WMP Submission Schedule Schedule for the 2026-2028 Base Wildfire Mitigation Plan (WMP) submissions and evaluations. Electrical Infrastructure 3 page(s) | | Office of Energy Infrastructure Safety |