Docket Log

REF #Docketed DateDocument TitleToFrom
1689610/27/2025SCE 2026-2028 Base WMP R2
SCE 2026-2028 Base WMP R2
 Southern California Edison
1689510/27/2025SCE 2026-2028 WMP Nonsubstantive Errata 10 27 2025
SCE 2026-2028 WMP Nonsubstantive Errata 10 27 2025
 Southern California Edison
1686010/22/2025BVES_OpeningComments_BVES_2026-2028_Base-WMP_R1
Letter regarding BVES Opening Comments to the Office of Energy Infrastructure Safety’s Revised Draft Decision for Bear Valley Electric Service, Inc.’s 2026-2028 Base Wildfire Mitigation Plan
1 page(s)
Tony Marino, Deputy DirectorBear Valley Electric Service, Inc.
1685110/21/2025Revision Notice on the Liberty 2026-2028 Base WMP
Revision Notice on the Liberty Utilities 2026-2028 Base Wildfire Mitigation Plan. Liberty's response is due November 20, 2025.
 Office of Energy Infrastructure Safety
1683510/13/2025Revision Notice for PacifiCorp 2026-2028 Base WMP
Revision Notice for PacifiCorp's 2026-2028 Wildfire Mitigation Plan. A response is due November 26, 2025.
 Office of Energy Infrastructure Safety
1682910/10/2025Revised Draft Decision for BVES 2026-2028 Base WMP
Revised Draft Decision for BVES 2026-2028 Base WMP. Opening comments must be submitted no later than October 22, 2025. Reply comments must be submitted no later than October 27, 2025.
Electrical Infrastructure
102 page(s)
 Office of Energy Infrastructure Safety
167989/30/2025SDG&E_2026-2028_Base-WMP_SDGE Tables_R2
 San Diego Gas & Electric
167979/30/2025SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R2
 San Diego Gas & Electric
167969/30/2025SDG&E_2026-2028_Base-WMP_Appendix G Supporting Data_R2
 San Diego Gas & Electric
167959/30/2025SDG&E_2026-2028_Base-WMP_R2
 San Diego Gas & Electric
167949/30/20252025-09-30_SDGE_2026-2028_Base-WMP_Cover_Letter_R2
Enclosed is SDG&E's revised 2026-2028 Base WMP R2 as directed by Energy Safety's Notice on Errata issued on September 16, 2025.
 San Diego Gas & Electric
167449/16/2025HWT_2026-2028_ Base_WMP_R1 Redline
 Horizon West Transmission LLC
167439/16/2025HWT_2026-2028_ Base_WMP_R1 Clean
 Horizon West Transmission LLC
167429/16/2025HWT_2026-2028_Base WMP_R1_Cover Letter and Revision Notice Response
 Horizon West Transmission LLC
167419/16/2025TBC_2026-2028_ Base_WMP_R1 Redline
 Trans Bay Cable LLC
167409/16/2025TBC_2026-2028_ Base_WMP_R1 Clean
 Trans Bay Cable LLC
167399/16/2025TBC_20262028_BaseWMP_R1_Cover Letter and Revision Notice Response
 Trans Bay Cable LLC
167389/16/2025Notice on Errata for SDG&E 2026-2028 Base WMP
Notice on Errata for the San Diego Gas and Electric Company 2026-2028 Base Wildfire Mitigation Plan. Revised submission due September 30, 2025
 Office of Energy Infrastructure Safety
167349/15/2025SCE 2026-2028 Base WMP R1 Tables - Appendices
SCE 2026-2028 Base WMP R1 Tables - Appendices
 Southern California Edison
167339/15/2025SCE 2026-2028 Base WMP R1 Tables - Chapters 7 to 13
SCE 2026-2028 Base WMP R1 Tables - Chapters 7 to 13
 Southern California Edison
167329/15/2025SCE 2026-2028 Base WMP R1 Tables - Chapters 1 to 6
SCE 2026-2028 Base WMP R1 Tables - Chapters 1 to 6
 Southern California Edison
167319/15/2025SCE 2026-2028 Base WMP R1 - Redline Version
SCE 2026-2028 Base WMP R1 - Redline Version
 Southern California Edison
167309/15/2025SCE 2026-2028 Base WMP R1
SCE 2026-2028 Base WMP Rev.1
 Southern California Edison
167299/15/2025SCE 2026-2028 Base WMP R1 Cover Letter and Revision Notice Response
SCE 2026-2028 Base WMP R1 Cover Letter and Revision Notice Response
 Southern California Edison
167129/9/2025PGE_2026-2028_Base-WMP_Atch02_R2
 PG&E
167119/9/2025PGE_2026-2028_Base-WMP_Vol1_R2 – Redline
 PG&E
167109/9/2025PGE_2026-2028_Base-WMP_Vol1_R2
 PG&E
167099/9/2025PGE_2026-2028_Revision Notice Response_R1 – Redline
 PG&E
167089/9/2025PGE_2026-2028_Revision Notice Response_R1
 PG&E
167079/9/2025PG&E's 2026-2028 Base Wildfire Mitigation Plan RNR Non-Substantive Errata_R1
 PG&E
167069/8/2025TBC 2026-2028 Base WMP R0 Non-Substantive Errata
 Trans Bay Cable LLC
167059/8/2025HWT 2026-2028 Base WMP R0 Non-Substantive Errata
 Horizon West Transmission LLC
16703-19/8/2025LSPGC_2026-2028_BASE-WMP_R0_Redline
 LSPower
16703-29/8/2025LSPGC_Non-Substantive_Errata_Cover_Letter_09_08
 LSPower
167029/5/2025PG&E's 2026-2028 Base Wildfire Mitigation Plan RNR Non-Substantive Errata
 PG&E
166819/2/2025Errata Notice on the TBC 2026-2028 Base WMP
Notice on Errata for the Trans Bay Cable 2026-2028 Base Wildfire Mitigation Plan. Revised submission due September 16, 2025.
Electrical Infrastructure
 Office of Infrastructure Energy Safety
166809/2/2025Errata Notice on the HWT 2026-2028 Base WMP
Notice on Errata for the Horizon West Transmission 2026-2028 Base Wildfire Mitigation Plan. Revised submission due September 16, 2025.
Electrical Infrastructure
 Office of Infrastructure Energy Safety
166718/29/20252026-2028 Base WMP PacifiCorp Reply Comments 8-29-25
 PacifiCorp
166308/22/2025GPI Comments on PacifiCorp 2026-2028 Base WMP
 Green Power Institute
166258/22/2025Pacific Gas and Electric Company’s_ReplyComments_PGE_2026-2028_RNR_R0
 PG&E
166208/22/2025PC_2026-2028_Base-WMP_R0_Redline
 PacifiCorp
166198/22/20258-22-25 PAC 2026-2028 Base WMP Non-Substantive Errata Cover Letter
 PacifiCorp
165768/19/2025BVES_2026-2028_Base-WMP_R1 Nonsubstantive_errata
Submission of BVES’s 2026-2028 Wildfire Mitigation Plan Revision 1 Non- Substantive Errata
3 page(s)
Tony Marino, Deputy DirectorBear Valley Electric Service, Inc.
165608/15/2025Third Revised 2026 - 2028 Base WMP Schedule
Third revised schedule for the 2026-2028 Base WMP submissions and evaluations. Revisions made to extend the dates by which Energy Safety will issue draft Decisions or Revision Notices for all remaining electrical corporations’ 2026-2028 Base WMPs.
Electrical Infrastructure
5 page(s)
 Office of Energy Infrastructure Safety
165568/15/2025Revision Notice for SCE 2026-2028 Base WMP
Revision Notice for Southern California Edison Company's 2026-2028 Wildfire Mitigation Plan. A response is due September 15, 2025.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
165458/14/20252025_08_14_SDGE_ReplyComments_2026-2028_Base-WMP_R1
 San Diego Gas & Electric
165258/12/2025MGRA Comments on PG&E 2026-2028 Base WMP Revision Notice Response
 Mussey Grade Road Alliance
165248/12/2025COMMENTS OF THE UTILITY REFORM NETWORK ON PG&E 2026–2028 BASE WMP RESPONSE TO REVISION NOTICE
 The Utility Reform Network
165228/8/2025LSPGC_2026-2028_Base-WMP_Tables_R0_Errata_REDLINE
 LSPower
165218/8/2025LSPGC_2026-2028_BASE-WMP_R0_Redline
 LSPower
165208/8/2025LSPGC_Substantive_Errata_Cover_Letter_08_08
 LSPower
165188/8/2025GPI Comments on Liberty 2026-2028 Base WMP
 Green Power Institute
164728/5/2025BVES_OpeningComments_BVES_2026-2028_Base-WMP_R0
Opening Comments on Office of Energy Infrastructure Safety’s Draft Decision for Bear Valley Electric Service, Inc.’s 2026-2028 Base Wildfire Mitigation Plan
1 page(s)
Tony Marino, Deputy DirectorBear Valley Electric Service, Inc.
164718/5/2025GPI Comments on BVES 2026-2028 Base WMP Draft Decision
 Green Power Institute
164698/4/2025SDGE 2026-2028 Base WMP R1 - MGRA Comments
MGRA files these comments pursuant to the July 9, 2025, Approval of San Diego Gas & Electric Company’s Extension Request to Resubmit its 2026-2028 Base Wildfire Mitigation Plan.
 Mussey Grade Road Alliance
164658/1/2025Second WMP Stakeholder Workshop Recording and Slides
Workshop slides and links to the recording for the Second Workshop on 2026-2028 Base Wildfire Mitigation Plans of Liberty Utilities, PacifiCorp, LS Power Grid California, Horizon West Transmission, and Trans Bay Cable, held on July 29, 2025.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
164287/29/2025PC_2026-2028_Base-WMP_Data_Tables_R0_Redline
 PacifiCorp
164277/29/2025PC_2026-2028_Base-WMP_R0_Redline
 PacifiCorp
164267/29/2025PacifiCorp Substantive Errata Cover Letter 7-29-25
 PacifiCorp
164257/29/2025Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan - Attachment 2
 Bear Valley Electric Service, Inc.
164247/29/2025Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan - Attachment 1
 Bear Valley Electric Service, Inc.
164237/29/2025Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan R1
Revised BVVES 2026-2028 Base WMP R1 based on letter dated July 22, 2025
 Bear Valley Electric Service, Inc.
164157/28/2025PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 2 - Revision 1 - REDLINE
 PG&E
164147/28/2025PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 1 - Revision 1 - REDLINE
 PG&E
164137/28/2025PGE_2026-2028_Base-WMP_Atch02_R1
 PG&E
164127/28/2025PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 2 - Revision 1
 PG&E
164117/28/2025PG&E's 2026-2028 Wildfire Mitigation Plan - Volume 1 - Revision 1
 PG&E
164107/28/2025PG&E's 2026-2028 Wildfire Mitigation Plan - Revision Notice Response
 PG&E
164097/25/2025TBC_2026-2028_ Base_WMP_Table Data_R0
 Trans Bay Cable LLC
164087/28/2025TBC_2026-2028_ Base_WMP_R0
 Trans Bay Cable LLC
164077/28/2025Application for Confidential Treatment- TBC 2025-07-25
 Trans Bay Cable LLC
163997/28/2025Application for Confidential Treatment HWT 2025-07-25.
 Horizon West Transmission LLC
163987/25/2025HWT_2026-2028_ Base_WMP_Table Data
 Horizon West Transmission LLC
163977/28/2025HWT_2026-2028_ Base_WMP_R0 REDACTED
 Horizon West Transmission LLC
163967/25/2025HWT_2026-2028_ Base_WMP_Cover Letter
 Horizon West Transmission LLC
163807/25/2025LSPGC_Applicaton_Confidentiality_2026_2028_Base_WMP
 LSPower
163797/25/2025LSPGC Substation Defensible Space
 LSPower
163787/25/2025LSPG MAINTENANCE PLAN_REV 2.1
 LSPower
163777/25/2025LSPG TVMP Procedure v1
 LSPower
163767/25/2025LSPGC_2026-2028_Base-WMP_Tables_R0
 LSPower
163757/25/2025LSPGC_2026-2028_Base-WMP_R0
 LSPower
163747/25/2025LSPGC_2026-2028_Base-WMP_Cover_Letter
 LSPower
163737/25/2025TBC_2026-2028_ Base_WMP_Cover Letter
 Trans Bay Cable LLC
163467/23/2025SDG&E_2026-2028_Base-WMP_SDGE Tables_R1.1
SDG&E is submitting revised Excel files for both its SDGE Tables and OEIS Guidelines Tables which reflect minor corrections to align with tables provided in SDG&E_2026-2028_Base-WMP_R1.
 San Diego Gas & Electric
163457/23/2025SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R1.1
SDG&E is submitting revised Excel files for both its SDGE Tables and OEIS Guidelines Tables which reflect minor corrections to align with tables provided in SDG&E_2026-2028_Base-WMP_R1.
 San Diego Gas & Electric
163227/22/2025Notice on Errata for BVES 2026-2028 Base WMP
Notice on Errata for the Bear Valley Electric Service, Inc. 2026-2028 Base Wildfire Mitigation Plan. Revised submission due July 29, 2025
 Office of Energy Infrastructure Safety
162977/18/2025SDG&E_2026-2028_Base-WMP_SDGE Tables_R1
 San Diego Gas & Electric
162967/18/2025SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R1
 San Diego Gas & Electric
162957/18/2025SDG&E_2026-2028_Base-WMP_Appendix G Supporting Data_R1
 San Diego Gas & Electric
162947/18/2025SDG&E_2026-2028_Base-WMP_R1
 San Diego Gas & Electric
162937/18/20252025-07-18_SDGE_2026-2028_Base-WMP_Cover_Letter_R1
 San Diego Gas & Electric
162737/16/2025Draft Decision for the BVES 2026-2028 Base WMP
Draft Decision for the BVES 2026-2028 Base Wildfire Mitigation Plan. Stakeholder comments are due on August 5, 2025 and reply comments are due August 15, 2025.
 Office of Energy Infrastructure Safety
162587/11/2025PacifiCorp 2026-2028 Base WMP Data Tables
 PacifiCorp
162577/11/2025PacifiCorp 2026-2028 Base WMP Appendix G Attachments
 PacifiCorp
162567/11/20252026-2028 Base WMP 2026-2028 Base WMP Appendix F Attachments
 PacifiCorp
162557/11/2025PacifiCorp 2026-2028 Base WMP RO
 PacifiCorp
162547/11/2025PacifiCorp 2026-2028 Base WMP Cover Letter
 PacifiCorp
162267/9/2025Approval of SDG&E's Extension Request for 2026-2028 Base WMP Resubmission
Approval of San Diego Gas & Electric Company’s Extension Request to Resubmit its 2026-2028 Base WMP.
 Office of Energy Infrastructure Safety
162067/7/2025SCE Reply Comments 2026-2028 Base WMP_R0
SCE Reply Comments 2026-2028 Base WMP R0
 Southern California Edison
162047/7/2025Public Meeting Notice - 2026-2028 Base WMP Second Workshop
Energy Safety will hold a virtual public workshop on Tuesday, July 29, 2025, on the 2026-2028 Base WMPs for Liberty, PacifiCorp, Horizontal West Transmission, Trans Bay Cable, and LS Power Electrical Infrastructure.
Electrical Infrastructure
5 page(s)
 Office of Energy Infrastructure Safety
161706/30/2025SCE 2026 2028 Base WMP R0 Nonsubstantive Errata
Nonsubstantive Errata
 Southern California Edison
161636/27/2025GPI Comments on SCE 2026-2028 Base WMP
 Green Power Institute
161566/27/2025Resilient Structures Public Comments on SCE 2026-2028 Base WMP
 Resilient Structures
161556/27/20252025-06-27 RCRC Opening Comments SCE 2026-2028 WMP R0

2 page(s)
 Rural County Representatives of California
161526/27/2025MGRA Comments on SCE 2026-2028 WMP
 Mussey Grade Road Alliance
161516/27/2025Revision Notice for PG&E 2026-2028 Base WMP
Revision Notice for Pacific Gas and Electric Company's 2026-2028 Wildfire Mitigation Plan. A response is due July 28, 2025.
 Office of Energy Infrastructure Safety
161506/27/2025Liberty_Application Confidentiality of 2026-2028 Base-WMP
 Liberty Utilities
161496/27/2025Liberty_2026-2028 Base-WMP_Tables_R0
 Liberty Utilities
161486/27/2025Liberty_2026-2028_Base-WMP_R0
 Liberty Utilities
161476/27/2025Liberty_2026-2028 Base-WMP_Cover Letter
 Liberty Utilities
161226/24/2025Rejection and Order to Resubmit for SDGE 2026-2028 Base WMP
Energy Safety rejects the SDG&E 2026-2028 Base Wildfire Mitigation Plan (WMP) submission dated May 2, 2025, and orders SDG&E to resubmit its 2026-2028 Base WMP by July 11, 2025.
 Office of Energy Infrastructure Safety
161116/20/2025SDG&E Reply Comments on 2026-2028 WMP
 San Diego Gas and Electric
160486/16/20252025-06-16_SDGE_2026-2028_Base-WMP_Non-substantive_Errata
SDG&E's non-substantive errata to its 2026-2028 Base WMP R0.
 San Diego Gas & Electric
160416/13/2025Comments on SDGE 2026-2028 Base WMP R0
 Green Power Institute
160326/13/2025MGRA Comments on SDGE 2026-2028 Base WMP R0
 Mussey Grade Road Alliance
159596/6/2025ReplyComments from BVES_2026-2028_Base-WMP_R0
BVES reply comments to Green Power Institue on BVES 2026-2028 Base WMP R0
4 page(s)
Caroline Thomas JacobsBear Valley Electric Service, Inc.
159465/16/2025SCE 2026 WMP Confidentiality Application Supporting Documents
SCE 2026 WMP Confidentiality Application Supporting Documents
 Southern California Edison
159386/2/20252025-06-02 SCE 2026-2028 Base WMP Errata
2025-06-02 SCE 2026-2028 Base WMP Errata
 Southern California Edison
159366/2/2025Pacific Gas and Electric Company’s_ReplyComments_PGE_2026-2028_Base-WMP_R0
On May 23, 2025, four stakeholders submitted comments on PG&E's 2026-2028 Base WMP. These reply comments address specific issues raised by these four stakeholders.
 PG&E
159356/2/2025BVES_2026-2028_Base-WMP_R0 Nonsubstantive_errata
Tony MarinoBear Valley Electric Service, Inc.
159295/30/2025GPI Comments on BVES 2026-2028 WMP
 Green Power Institute
159055/23/2025First WMP Stakeholder Workshop Recording and Slides
Workshop slides and links to recordings for First Workshop on 2026-2028 Base Wildfire Mitigation Plans of Pacific Gas and Electric, Bear Valley Electric Service, Inc., San Diego Gas & Electric, and Southern California Edison, held on May 21, 2025.
Electrical Infrastructure
 Office of Infrastructure Energy Safety
159025/23/2025GPI Comments on PG&E 2026-2028 Base WMP
 Green Power Institute
158875/23/2025Opening Comments of the Rural County Representatives of California on PG&E 2026-2028 Base Wildfire Mitigation Plan R0

Electrical Infrastructure
4 page(s)
Caroline Thomas JacobsRural County Representatives of California
158865/23/2025OPENING COMMENTS OF THE UTILITY REFORM NETWORK ON PACIFIC GAS AND ELECTRIC COMPANY’S 2026–2028 BASE WILDFIRE MITIGATION PLAN
 The Utility Reform Network
158855/23/2025MGRA 2026-2028 Base WMP P&GE Comments
 Mussey Grade Road Alliance
158725/16/2025SDG&E_2026-2028_Base-WMP Appendix G Supporting Data Errata
 San Diego Gas & Electric
158715/16/20252025-05-16_SDGE_2026-2028_Base-WMP Errata
Substantive and Non-substantive Errata
 San Diego Gas & Electric
158615/16/2025SCE_2026_Survey_R0
Southern California Edison Maturity Model Survey
 Southern California Edison
15860-15/16/2025QCP-006 r5 03 13 2024
QCP-006 r5 03 13 2024
 Southern California Edison
15860-25/16/2025QCP-007 r5 03 13 2024
QCP-007 r5 03 13 2024
 Southern California Edison
15860-35/16/2025QCP-010 r5 03 13 2024
QCP-010 r5 03 13 2024
 Southern California Edison
15860-45/16/2025AHP v4 12 2024 Redacted
AHP v4 12 2024 Redacted
 Southern California Edison
15860-55/16/2025DIMP Manual 10 25 2024
DIMP Manual 10 25 2024
 Southern California Edison
15860-65/16/2025QCP-014 r1 03 13 2024
QCP-014 r1 03 13 2024
 Southern California Edison
15860-75/16/2025QCP-015 r1 03 13 2024
QCP-015 r1 03 13 2024
 Southern California Edison
15860-85/16/2025SCE Covered Conductor Compendium
SCE Covered Conductor Compendium
 Southern California Edison
15860-95/16/2025SOM Manual 11 22 2024
SOM Manual 11 22 2024
 Southern California Edison
15860-105/16/2025TIMP Manual 12 20 2024
TIMP Manual 12 20 2024
 Southern California Edison
15860-115/16/2025UVM-02 v8 04 01 2024
UVM-02 v8 04 01 2024
 Southern California Edison
15860-125/16/2025UVM-03 v6 04 01 2024
UVM-03 v6 04 01 2024
 Southern California Edison
15860-135/16/2025UVM-04 v3 04 01 2024
UVM-04 v3 04 01 2024
 Southern California Edison
15860-145/16/2025UVM-05 v2 05 17 2019
UVM-05 v2 05 17 2019
 Southern California Edison
15860-155/16/2025SCE Notice of Availability
SCE Notice of Availability
 Southern California Edison
15860-165/16/2025UVM-06 v2 05 17 2019
UVM-06 v2 05 17 2019
 Southern California Edison
15860-175/16/2025UVM-07 v10 03 24 2025
UVM-07 v10 03 24 2025
 Southern California Edison
15860-185/16/2025UVM-08 v16 03 24 2025
UVM-08 v16 03 24 2025
 Southern California Edison
15860-195/16/2025UVM-18 v1 12 06 2021
UVM-18 v1 12 06 2021
 Southern California Edison
15860-205/16/2025UVM-20 v4 03 24 2025
UVM-20 v4 03 24 2025
 Southern California Edison
15860-215/16/2025VM Operations Storm Manual v1 12 13 2024
VM Operations Storm Manual v1 12 13 2024
 Southern California Edison
15859-15/16/2025SCE 2026-2028 Base WMP Tables - Chapters 1 to 6
SCE 2026-2028 Base WMP Tables - Chapters 1 to 6
 Southern California Edison
15859-25/16/2025SCE 2026-2028 Base WMP Tables - Chapters 7 to 13
SCE 2026-2028 Base WMP Tables - Chapters 7 to 13
 Southern California Edison
158585/16/2025SCE 2026-2028 Base WMP R0
Southern California Edison 2026-2028 Base Wildfire Mitigation Plan R0
 Southern California Edison
158575/16/20252025-05-16 PGE 2026-2028 Base WMP Non-substantive Errata
PG&E’s 2026-2028 Base Wildfire Mitigation Plan Non-substantive Errata
 PG&E
158325/14/2025Second Revised 2026-2028 Base WMP Schedule
Second revised schedule for the 2026-2028 Base WMP submissions and evaluations. Revisions made to 1) extend PG&E reply comment due date to account for the 5/26/25 holiday and 2) provide the specific date for the first WMP workshop.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
157765/2/2025Public Meeting Notice - 2026-2028 Base WMP Workshop
Energy Safety will hold a virtual public workshop on Wednesday, May 21, 2025, on the 2026-2028 Base WMPs for PG&E, Bear Valley, SDG&E, and SCE
Electrical Infrastructure
4 page(s)
 Office of Energy Infrastructure Safety
157715/2/2025SDG&E_2026-2028_Base-WMP_Appendix G Supporting Data_R0
Supporting data for SDG&E's 2026-2028 Base WMP Appendix G
 San Diego Gas & Electric
157705/2/2025SDG&E_2026-2028_Base-WMP_SDGE Tables_R0
SDG&E's 2026-2028 Base WMP Tables
 San Diego Gas & Electric
157695/2/2025SDG&E_2026-2028_Base-WMP_OEIS Guideline Tables_R0
SDG&E's 2026-2028 Base WMP OEIS Guideline Tables
 San Diego Gas & Electric
157685/2/2025SDG&E_2026-2028_Base-WMP_R0
SDG&E's 2026-2028 Base WMP
 San Diego Gas & Electric
157675/2/20252025-05-02_SDGE_2026-2028_Base-WMP_Cover_Letter_R0
SDG&E's 2026-2028 Base WMP Cover Letter
 San Diego Gas & Electric
156754/18/2025PG&E 2026-2028 Base WMP Substantive Errata
Pursuant to Section 7 of Energy Safety Policy Division Process Guidelines, PG&E hereby submits its substantive errata for the 2026-2028 WMP.
 PG&E
156744/18/2025BVES_2026-2028_Base-WMP_Atch02_R0
Excel File for BVES 2026-2028 Base WMP Tables
 Bear Valley Electric Service, Inc.
156734/18/2025BVES_2026-2028_Base-WMP_Atch01_R0
Cover Letter to BVES 2026-2028 Base WMP
 Bear Valley Electric Service, Inc.
156724/18/2025BVES_2026-2028_Base-WMP_R0
BVES 2026-2028 Base WMP Revision 0
 Bear Valley Electric Service, Inc.
156014/4/2025PG&E's 2026-2028 Base WMP R0 Atch02
 PG&E
156004/4/2025PG&E's 2026-2028 Base WMP R0 Atch01
 PG&E
155994/4/2025PG&E's 2026-2028 Base WMP R0 - Volume 2
 PG&E
155984/4/2025PG&E's 2026-2028 Base WMP R0 - Volume 1
 PG&E
154703/17/2025MGRA Request for Stakeholder Designation.
 Mussey Grade Road Alliance
154152/25/2025Public Advocates Office Request for Stakeholder Designation
 California Public Utilities Commission
154092/24/2025Revised 2026-2028 Base WMP Schedule
Revised schedule for the 2026-2028 Base WMP submissions and evaluations. Revisions made to provide due dates for Maturity Survey responses and adjust PG&E comment period to account for workshops.
 Office of Energy Infrastructure Safety
154082/24/2025TURN Stakeholder Designation Letter
Requests Stakeholder Designation for 2026-2028 WMPs
Electrical Infrastructure
1 page(s)
Energy SafetyTURN
152451/27/20252026-2028 Base WMP Submission Schedule
Schedule for the 2026-2028 Base Wildfire Mitigation Plan (WMP) submissions and evaluations.
Electrical Infrastructure
3 page(s)
 Office of Energy Infrastructure Safety