16612 | 8/22/2025 | NOV_CAD_SCE_KSF_20250617_1119 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16611 | 8/22/2025 | NOV_CAD_SCE_LOK_20250617_1332 Notice of Violation Electrical Infrastructure 9 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16610 | 8/22/2025 | NOV_CAD_SCE_SIS_20250708_1316 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16609 | 8/22/2025 | NOV_CAD_SCE_SIS_20250708_1336 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16608 | 8/22/2025 | NOV_CAD_SCE_SIS_20250708_1348 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16607 | 8/22/2025 | NOV_CAD_SCE_YLO_20250710_1119 Notice of Violation Electrical Infrastructure 11 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16606 | 8/22/2025 | NOV_CAD_SCE_YLO_20250710_1259 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16503 | 8/8/2025 | SDGE_NOV_CAD_SDGE_YLO_20250409_0910_20250808_Response.pdf SDG&E is providing an update to its August 6 response. This update provide supporting documentation (photo) of the correction to resolve this NOV. | | San Diego Gas & Electric |
16481 | 8/6/2025 | NOV_CAD_SDGE_YLO_20250409_0910_Response.pdf
| | San Diego Gas & Electric |
16466 | 8/1/2025 | 2024-NOV SCE Response NOV_CAD_SCE_YLO_20250507_1048
| | Southern California Edison |
16449 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC12_20241120_1543 Document confirming the closure of NOV_CAD_SCE_CAC12_20241120_1543 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16448 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC12_20250107_1521 Document confirming the closure of NOV_CAD_SCE_CAC12_20250107_1521 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16447 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC12_20250115_1213 Document confirming the closure of NOV_CAD_SCE_CAC12_20250115_1213 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16446 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC12_20250129_1057 Document confirming the closure of NOV_CAD_SCE_CAC12_20250129_1057 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16445 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC12_20250203_1607 Document confirming the closure of NOV_CAD_SCE_CAC12_20250203_1607 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16444 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC20_20241114_1328 Document confirming the closure of NOV_CAD_SCE_CAC20_20241114_1328 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16443 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC12_20250129_1300 Document confirming the closure of NOV_CAD_SCE_CAC12_20250129_1300 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16442 | 7/31/2025 | Closure of NOV_CAD_SCE_CAC20_20250311_1306 Document confirming the closure of NOV_CAD_SCE_CAC20_20250311_1306 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16441 | 7/31/2025 | Closure of NOV_CAD_SCE_ATJ_20250520_1304 Document confirming the closure of NOV_CAD_SCE_ATJ_20250520_1304 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16440 | 7/31/2025 | Closure of NOV-CAD_SCE_SIS_20250129_1114 Document confirming the closure of NOV-CAD_SCE_SIS_20250129_1114 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16439 | 7/31/2025 | Closure of NOV_CAD_SCE_SIS_20250129_1132 Document confirming the closure of NOV_CAD_SCE_SIS_20250129_1132 Electrical Infrastructure 1 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16388 | 7/28/2025 | NOV_CAD_PC_IAG_20250522_1008 Notice of Violation Electrical Infrastructure 9 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
16387 | 7/28/2025 | NOV_CAD_PC_IAG_20250522_1042 Notice of Violation Electrical Infrastructure 8 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
16368 | 7/24/2025 | NOV_CAD_PGE_CYA_20250325_1149 Notice of Violation Electrical Infrastructure 9 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16367 | 7/24/2025 | NOV_CAD_PGE_CYA_20250325_1204 Notice of Violation Electrical Infrastructure 8 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16366 | 7/24/2025 | NOV_CAD_PGE_CYA_20250325_1247 Notice of Violation Electrical Infrastructure 8 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16365 | 7/24/2025 | NOV_CAD_PGE_IAG_20250409_1031 Notice of Violation Electrical Infrastructure 8 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16364 | 7/24/2025 | NOV_CAD_PGE_KSF_20250408_1027 Notice of Violation Electrical Infrastructure 9 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16363 | 7/24/2025 | NOV_CAD_PGE_RMA_20250409_1346 Notice of Violation Electrical Infrastructure 8 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16321 | 7/21/2025 | DRU15959_OEIS Confidentiality Declaration NOV Confidentiality Declaration | | Pacific Gas and Electric |
16320 | 7/21/2025 | NOV_CAD_PGE_LOK_20240911_1131 NOV Response Letter- NOV_CAD_PGE_LOK_20240911_1131 | | Pacific Gas and Electric |
16318 | 7/21/2025 | NOV_CAD_PGE_IAG_20250129_1617_Final NOV Response Letter | | Pacific Gas and Electric |
16310 | 7/14/2025 | DRU15913_OEIS Confidentiality Declaration Confidentiality Declaration | | Pacific Gas and Electric |
16309 | 7/18/2025 | NOV Response - NOV_CAD_SCE_YLO_20250507_1312
| | Southern California Edison |
16308 | 7/18/2025 | NOV Response - NOV_CAD_SCE_YLO_20250507_1307
| | Southern California Edison |
16307 | 7/18/2025 | NOV Response - NOV_CAD_SCE_YLO_20250506_1044
| | Southern California Edison |
16306 | 7/18/2025 | NOV Response - NOV_CAD_SCE_YLO_20250506_1049
| | Southern California Edison |
16264 | 7/15/2025 | NOV_CAD_PGE_CYA_20241106_1049_Response Letter NOV Response Letter | | Pacific Gas and Electric |
16263 | 7/15/2025 | NOV_CAD_SCE_YLO_20250507_1048 Notice of Violation Electrical Infrastructure 15 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16244 | 7/9/2025 | NOV Response NOV_CAD_SCE_ATJ_20250520_1304
| | Southern California Edison |
16243 | 7/10/2025 | NOV_CAD_SDGE_ATJ_20250325_0829_Response.pdf
| | San Diego Gas & Electric |
16242 | 7/10/2025 | NOV_CAD_SDGE_SIS_20250325_1507_Response.pdf
| | San Diego Gas & Electric |
16241 | 7/10/2025 | NOV_CAD_SDGE_SIS_20250409_1225_Response.pdf
| | San Diego Gas & Electric |
16240 | 7/10/2025 | NOV_CAD_SDGE_SIS_20250326_1024_Response.pdf
| | San Diego Gas & Electric |
16239 | 7/10/2025 | NOV_CAD_SDGE_SIS_20250326_0847_Response.pdf
| | San Diego Gas & Electric |
16238 | 7/10/2025 | NOV_CAD_SDGE_SIS_20250326_0748_Response.pdf
| | San Diego Gas & Electric |
16209 | 7/8/2025 | NOV Response NOV_CAD_SCE_SIS_20250129_1132
| | Southern California Edison |
16205 | 7/7/2025 | NOV_CAD_SDGE_YLO_20250409_0910 Notice of Violation Electrical Infrastructure 10 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
16173 | 7/1/2025 | SCE NOV Response - NOV_CAD_SCE_SIS_20250129_1114
| | Southern California Edison |
16162 | 6/27/2025 | NOV_CAD_SCE_YLO_20250506_1044 Notice of Violation Electrical Infrastructure 13 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16161 | 6/27/2025 | NOV_CAD_SCE_YLO_20250506_1049 Notice of Violation Electrical Infrastructure 13 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16160 | 6/27/2025 | NOV_CAD_SCE_YLO_20250507_1307 Notice of Violation Electrical Infrastructure 15 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16159 | 6/27/2025 | NOV_CAD_SCE_YLO_20250507_1312 Notice of Violation Electrical Infrastructure 14 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16142 | 6/27/2025 | Closure of NOV ESD_PGE_MAZ_20250305_1026 Document confirming the closure of NOV ESD_PGE_MAZ_20250305_1026. Electrical Infrastructure 1 page(s) | Jerrod Meier | Office of Energy Infrastructure Safety |
16141 | 6/27/2025 | Closure of NOV ESD_PGE_GCA_20250305_0926 Document confirming the closure of NOV ESD_PGE_GCA_20250305_0926. Electrical Infrastructure 1 page(s) | Jerrod Meier | Office of Energy Infrastructure Safety |
16117 | 6/23/2025 | NOV_CAD_PGE_BKA_20250116_1235 Notice of Violation Electrical Infrastructure 9 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16072 | 6/19/2025 | NOV_CAD_PGE_IAG_20250129_1617 Notice of Violation Electrical Infrastructure 9 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16071 | 6/19/2025 | NOV_CAD_PGE_LOK_20240911_1131 Notice of Violation Electrical Infrastructure 9 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16070 | 6/19/2025 | NOV_CAD_SCE_ATJ_20250520_1304 Notice of Violation Electrical Infrastructure 13 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16069 | 6/18/2025 | Withdrawal of NOV ESD_PGE_GCA_20250225_1059
2 page(s) | PG&E | Office of Energy Infrastructure Safety |
16056 | 5/15/2025 | DRU15534_OEIS Confidentiality Declaration Confidentiality Declaration for NOV Response | | Pacific Gas and Electric |
16055 | 6/16/2025 | DRU15764_OEIS Confidentiality Declaration_10 attch_07.22.24 Confidentiality Declaration | | Pacific Gas and Electric |
16054 | 5/23/2025 | NOV_ESD_PGE_MAZ_20250305_1026_Response NOV Response Letter | | Pacific Gas and Electric |
16053 | 6/16/2025 | NOV_CAD_SDGE_ATJ_20250325_0829 Notice of Violation Electrical Infrastructure 13 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
16030 | 6/13/2025 | NOV_CAD_PGE_CYA_20241106_1049 Notice of Violation Electrical Infrastructure 9 page(s) | Pacific Gas and Electric Company | Office of Energy Infrastructure Safety |
16017 | 6/10/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250115_1213 SCE NOV Response - NOV CAD SCE CAC12 20250115 1213 | | Southern California Edison |
16016 | 6/10/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250107_1521 SCE NOV Response - NOV CAD SCE CAC12 20250107 1521 | | Southern California Edison |
16015 | 6/10/2025 | SCE NOV Response - NOV_CAD_SCE_CAC20_20250312_0949 SCE NOV Response - NOV CAD SCE CAC20 20250312 0949 | | Southern California Edison |
16014 | 6/10/2025 | NOV_CAD_SCE_SIS_20250129_1114 Notice of Violation Electrical Infrastructure 9 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16013 | 6/10/2025 | NOV_CAD_SCE_SIS_20250129_1132 Notice of Violation Electrical Infrastructure 9 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
16012 | 6/10/2025 | NOV_CAD_SDGE_SIS_20250325_1507 Notice of Violation Electrical Infrastructure 10 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
16011 | 6/10/2025 | NOV_CAD_SDGE_SIS_20250326_0748 Notice of Violation Electrical Infrastructure 9 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
16010 | 6/10/2025 | NOV_CAD_SDGE_SIS_20250326_0847 Notice of Violation Electrical Infrastructure 9 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
16009 | 6/10/2025 | NOV_CAD_SDGE_SIS_20250326_1024 Notice of Violation Electrical Infrastructure 10 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
16008 | 6/10/2025 | NOV_CAD_SDGE_SIS_20250409_1225 Notice of Violation Electrical Infrastructure 11 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
15985 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250114_0940 SCE NOV Response - NOV_CAD_SCE_CAC12_20250114_0940 | | Southern California Edison |
15984 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20241120_1543 SCE NOV Response - NOV_CAD_SCE_CAC12_20241120_1543 | | Southern California Edison |
15983 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250203_1607 SCE NOV Response - NOV_CAD_SCE_CAC12_20250203_1607 | | Southern California Edison |
15982 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250129_1300 SCE NOV Response - NOV_CAD_SCE_CAC12_20250129_1300 | | Southern California Edison |
15981 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250129_1230 SCE NOV Response - NOV_CAD_SCE_CAC12_20250129_1230 | | Southern California Edison |
15980 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250129_1057 SCE NOV Response - NOV_CAD_SCE_CAC12_20250129_1057 | | Southern California Edison |
15979 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC12_20250116_1227 SCE NOV Response - NOV_CAD_SCE_CAC12_20250116_1227 | | Southern California Edison |
15978 | 6/6/2025 | SCE NOV Response -NOV_CAD_SCE_CAC20_20241114_1328 SCE NOV Response -NOV_CAD_SCE_CAC20_20241114_1328 | | Southern California Edison |
15977 | 6/6/2025 | SCE NOV Response -NOV_CAD_SCE_CAC12_20250131_1121 SCE NOV Response -NOV_CAD_SCE_CAC12_20250131_1121 | | Southern California Edison |
15976 | 6/6/2025 | SCE NOV Response - NOV_CAD_SCE_CAC20_20250311_1306 SCE NOV Response - NOV_CAD_SCE_CAC20_20250311_1306 | | Southern California Edison |
15876 | 5/21/2025 | SCE NOV Response-CAD_SCE_CAC12_20250131_1111 SCE NOV Response-CAD_SCE_CAC12_20250131_1111 | | Southern California Edison |
15873 | 5/19/2025 | NOV_CAD_SDGE_SIS_20250325_0809_Response.pdf
| | San Diego Gas & Electric |
15852 | 5/15/2025 | NOV_CAD_SCE_CAC20_20250311_1306 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15851 | 5/15/2025 | NOV_CAD_SCE_CAC12_20250129_1300 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15850 | 5/15/2025 | NOV_CAD_SCE_CAC12_20250129_1230 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15849 | 5/15/2025 | ESD_PGE_GCA_20250305_0926
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15839 | 5/13/2025 | SCE NOV Response NOV_CAD_SCE_ATJ_20250116_0928
| | Southern California Edison |
15830 | 5/13/2025 | NOV_CAD_SCE_CAC20_20250312_0949 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15829 | 5/13/2025 | NOV_CAD_SCE_CAC20_20241114_1328 Notice of Violation Electrical Infrastructure 9 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15828 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250203_1607 Notice of Violation Electrical Infrastructure 11 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15827 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250131_1121 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15826 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250129_1057 Notice of Violation Electrical Infrastructure 11 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15825 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250116_1227 Notice of Violation Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15824 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250115_1213 Notice of Violation Electrical Infrastructure 11 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15823 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250114_0940 Notice of Violation Electrical Infrastructure 11 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15822 | 5/13/2025 | NOV_CAD_SCE_CAC12_20250107_1521 Notice of Violation Electrical Infrastructure 9 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15821 | 5/13/2025 | NOV_CAD_SCE_CAC12_20241120_1543 Notice of Violation Electrical Infrastructure 9 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15816 | 5/9/2025 | Withdrawal of NOV_ESD_SCE_MAZ_20250325_1004 notice of withdrawal Electrical Infrastructure 2 page(s) | SCE | Office of Energy Infrastructure Safety |
15772 | 5/2/2025 | SCE NOV Response-NOV_ESD_SCE_MAZ_20250325_1004 SCE NOV Response-NOV ESD SCE MAZ 20250325 1004 | | Southern California Edison |
15756 | 5/1/2025 | Closure of NOV_ESD_SCE_GCA_20250325_1448
2 page(s) | SCE | Office of Energy Infrastructure Safety |
15705 | 4/25/2025 | SCE NOV Response NOV_ESD_SCE_GCA_20250325_1448
| | Southern California Edison |
15697 | 4/23/2025 | NOV_ESD_PGE_MAZ_20250305_1026
9 page(s) | | Office of Energy Infrastructure Safety |
15696 | 4/23/2025 | NOV_ESD_SCE_MAZ_20250325_1004
8 page(s) | | Office of Energy Infrastructure Safety |
15692 | 4/17/2025 | NOV_CAD_PGE_CYA_20250129_1053_Response NOV Response | | Pacific Gas and Electric |
15691 | 4/17/2025 | NOV_CAD_PGE_IAG_20250129_1053_Response NOV Response | | Pacific Gas and Electric |
15690 | 4/17/2025 | NOV_CAD_PGE_BKA_20250116_1052_Response NOV Response | | Pacific Gas and Electric |
15689 | 4/17/2025 | NOV_CAD_PGE_IAG_20250128_1059_Response NOV Response | | Pacific Gas and Electric |
15688 | 4/17/2025 | NOV_CAD_PGE_CYA_20250116_1153_Response NOV Response | | Pacific Gas and Electric |
15687 | 4/17/2025 | NOV_CAD_PGE_BKA_20250129_1136_Response NOV Response | | Pacific Gas and Electric |
15684 | 4/22/2025 | NOV_CAD_SCE_CAC12_20250131_1111 Notice of Violation Electrical Infrastructure 12 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15683 | 4/22/2025 | NOV_CAD_SDG_SIS_20250325_0809 Notice of Violation Electrical Infrastructure 10 page(s) | San Diego Gas & Electric Company | Office of Energy Infrastructure Safety |
15643 | 4/16/2025 | Closure of NOV ESD_PGE_RIB_20241112_1000
2 page(s) | PG&E | Office of Energy Infrastructure Safety |
15642 | 4/15/2025 | NOV_ESD_PGE_GCA_20250225_1059
10 page(s) | PG&E | Office of Energy Infrastructure Safety |
15641 | 4/15/2025 | NOV_ESD_SCE_GCA_20250325_1448
8 page(s) | SCE | Office of Energy Infrastructure Safety |
15640 | 4/14/2025 | NOV_CAD_SCE_ATJ_20250116_0928
Electrical Infrastructure 10 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
15572 | 4/2/2025 | NOV_ESD_PC_CAC23_20250116_1055_Closed Confirmation of Closure of NOV_ESD_PC_CAC23_20250116_1055 Electrical Infrastructure 2 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15547 | 3/27/2025 | NOV_ESD_PC_CAC23_20250116_1055 Response 3-27-25.pdf
| | PacifiCorp |
15504 | 3/21/2025 | NOV_CAD_PGE_IAG_20250129_1053
Electrical Infrastructure 8 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15503 | 3/21/2025 | NOV_CAD_PGE_IAG_20250128_1059
Electrical Infrastructure 8 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15502 | 3/21/2025 | NOV_CAD_PGE_CYA_20250129_1053
Electrical Infrastructure 8 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15501 | 3/21/2025 | NOV_CAD_PGE_CYA_20250116_1153
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15500 | 3/21/2025 | NOV_CAD_PGE_BKA_20250129_1136
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15499 | 3/21/2025 | NOV_CAD_PGE_BKA_20250116_1052
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15455 | 3/12/2025 | Closure of NOV ESD_SCE_RGA_20240828_1504
1 page(s) | | Office of Energy Infrastructure Safety |
15454 | 3/12/2025 | NOV ESD_LU_KJO_20241008_0823_Closed Energy Safety considers NOV ESD_LU_KJO_20241008_0823 closed, and no further action is required by Liberty at this time. Electrical Infrastructure 2 page(s) | Liberty | Office of Energy Infrastructure Safety |
15414 | 2/25/2025 | NOV ESD_PC_CAC23_20250116_1055 Pacificorp Notice of Violation Electrical Infrastructure 8 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15413 | 2/20/2025 | CAD_PGE_RMA_20241009_1010_Response Letter Response to NOV CAD_PGE_RMA_20241009_1010 Electrical Infrastructure | | Pacific Gas and Electric |
15412 | 2/21/2025 | NOV_CAD_PGE_CYA_20241107_1023_Response Letter Response to Data Accuracy NOV for Non-Exempt Equipment Change Initiative Electrical Infrastructure | | Pacific Gas and Electric |
15410 | 2/21/2025 | NOV_CAD_PC_CAC22_20240910_1320 2-20-25
| | PacifiCorp |
15394 | 2/21/2025 | Revised NOV Response-NOV ESD_SCE_RGA_20240828_1504
| | Southern California Edison |
15376 | 2/19/2025 | NOV Response-NOV_ESD_SCE_GCA_20250128_0957 Southern California Edison Company’s Response to Notice of Violation -NOV_ESD_SCE_GCA_20250128_0957 | | Southern California Edison |
15356 | 2/12/2025 | NOV_ESD_PC_CAC23_20241219_1132 Response 2-12-25
Electrical Infrastructure | | PacifiCorp |
15346 | 2/11/2025 | NOV ESD_SCE_GCA_20250128_0957
8 page(s) | Southern California Edison | Office of Energy Infrastructure Safety |
15337 | 2/7/2025 | NOV_ESD_SDGE_CAC23_20240924_1133_Withdrawn
Electrical Infrastructure 2 page(s) | SDG&E | Office of Energy Safety |
15319 | 2/6/2025 | NOV_ESD_PC_CAC23_20240912_0738_Closed Energy Safety has determined that PacifiCorp adequately addressed Energy Safety’s concerns. Energy Safety
considers NOV ESD_PC_CAC23_20240912 closed, and no further action is required by PacifiCorp. Electrical Infrastructure 2 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15265 | 1/24/2025 | NOV_CAD_PC_CAC22_20240905_1200_Supplement
| | PacifiCorp |
15264 | 1/24/2025 | NOV PacifiCorp Response-CAD_PC_CAC22_20240905_1200 1-24-25
| | PacifiCorp |
15263 | 1/24/2025 | NOV PacifiCorp Response-CAD_PC_CAC17_20240905_1356 1-24-25
| | PacifiCorp |
15262 | 1/24/2025 | NOV_CAD_PC_CAC17_20240905_1356_Supplement
| | PacifiCorp |
15261 | 1/29/2025 | NOV_CAD_SDGE_LOK_20241105_1438_Response NOV_CAD_SDGE_LOK_20241105_1438_Response | | San Diego Gas and Electric |
15242 | 1/24/2025 | NOV_CAD_PGE_CYA_20241107_1023
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15240 | 1/23/2025 | NOV_CAD_LU_CAC17_20241016_0916 - Liberty Response
| | Liberty Utilities |
15238 | 1/23/2025 | NOV_CAD_PGE_LOK_20240822_1116
| | Pacific Gas and Electric |
15230 | 1/21/2025 | NOV ESD_SDGE_CAC23_20240924_1133_Response
| | San Diego Gas and Electric |
15222 | 1/21/2025 | NOV_CAD_SDGE_LOK_20241009_0804_Response
| | San Diego Gas and Electric |
15221 | 1/21/2025 | NOV_CAD_SDGE_LOK_20241009_0839_Response
| | San Diego Gas and Electric |
15220 | 1/21/2025 | NOV_CAD_SDGE_LOK_20241009_0931
| | San Diego Gas and Electric |
15219 | 1/21/2025 | NOV_CAD_SDGE_LOK_20241105_1318_Response
| | San Diego Gas and Electric |
15218 | 1/21/2025 | NOV_CAD_PGE_RMA_20241009_1010
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15217 | 1/21/2025 | NOV_CAD_PC_CAC17_20240910_1320
Electrical Infrastructure 9 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15191 | 1/13/2025 | NOV_ESD_PC_CAC23_20241219_1132.pdf PacifiCorp NOV Electrical Infrastructure 9 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15189 | 1/9/2025 | NOV ESD_PGE_RIB_20241112_1000 Response
| | Pacific Gas and Electric Company |
15165 | 12/24/2024 | NOV_CAD_SDGE_LOK_20241009_0931
Electrical Infrastructure 8 page(s) | San Diego Gas & Electric | Office of Energy Infrastructure Safety |
15161 | 12/24/2024 | NOV_CAD_PGE_LOK_20240822_1116
Electrical Infrastructure 9 page(s) | Pacific Gas and Electric | Office of Energy Infrastructure Safety |
15160 | 12/24/2024 | NOV_CAD_PC_CAC22_20240905_1200
Electrical Infrastructure 8 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15159 | 12/24/2024 | NOV_CAD_PC_CAC17_20240905_1356
Electrical Infrastructure 9 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
15156 | 12/24/2024 | NOV_CAD_LU_CAC17_20241016_0916
Electrical Infrastructure 13 page(s) | Liberty Utilities | Office of Energy Infrastructure Safety |
15136 | 12/19/2024 | NOV_CAD_SDGE_LOK_20241009_0804
Electrical Infrastructure 8 page(s) | San Diego Gas & Electric | Office of Energy Infrastructure Safety |
15135 | 12/19/2024 | NOV_CAD_SDGE_LOK_20241009_0839
Electrical Infrastructure 8 page(s) | San Diego Gas & Electric | Office of Energy Infrastructure Safety |
15134 | 12/19/2024 | NOV_CAD_SDGE_LOK_20241105_1318
Electrical Infrastructure 8 page(s) | San Diego Gas & Electric | Office of Energy Infrastructure Safety |
15133 | 12/19/2024 | NOV ESD_SDGE_CAC23_20240924_1133
8 page(s) | SDG&E | Office of Energy Safety |
15132 | 12/19/2024 | NOV_CAD_SDGE_LOK_20241105_1438
Electrical Infrastructure 8 page(s) | San Diego Gas & Electric | Office of Energy Infrastructure Safety |
15127 | 12/17/2024 | SDGE_NOV ESD_SDGE_CAC23_20240925_1227_Response
| | San Diego Gas & Electric |
15126 | 12/17/2024 | NOV ESD_SDGE_CAC23_20241121_1323_Response
| | San Diego Gas & Electric |
15103 | 12/12/2024 | NOV_SDGE_CAC23_20241121_1323
9 page(s) | SDG&E | Office of Energy Safety |
15088 | 12/10/2024 | NOV ESD_PGE_RIB_20241112_1000
9 page(s) | | Office of Energy Infrastructure Safety |
15057 | 11/26/2024 | NOV ESD_PC_CAC23_20240912_0738 Response 11-26-24
| | PacifiCorp |
15045 | 11/26/2024 | SDGE_NOV ESD_SDGE_RGA_20241003_1045_Response
| | San Diego Gas & Electric |
15022 | 11/21/2024 | NOV_ESD_LU_KJO_20241008_0823 - Liberty Response
| | Liberty Utilities |
15017 | 11/20/2024 | NOV ESD_SDGE_CAC23_20240925_1227
8 page(s) | SDG&E | Office of Energy Infrastructure Safety |
15001 | 11/12/2024 | NOV Response-NOV ESD_SCE_CAC23_20240828_0917
| | Southern California Edison |
14999 | 11/8/2024 | NOV ESD_PGE_RIB_20240911_1355 Closed
9 page(s) | PG&E | Office of Energy Infrastructure Safety |
14943 | 10/31/2024 | NOV ESD_PC_CAC23_20240912_0738
15 page(s) | | Office of Energy Infrastructure Safety |
14939 | 10/31/2024 | NOV ESD_SCE_CAC23_20240828_0971
8 page(s) | SCE | Office of Energy Infrastructure Safety |
14933 | 10/31/2024 | NOV ESD_LU_KJO_20241008_0823
8 page(s) | Liberty | Office of Energy Infrastructure Safety |
14929 | 10/30/2024 | NOV ESD SDGE RGA 20241003 1045 Notice of Violation for failure to adhere to protocol 8.2.3.1- Pole Clearing (WMP .512), submitted to San Diego Gas and Electric issued 10/30/2024. Electrical Infrastructure 8 page(s) | Lena McMillin | Office of Energy Infrastructure Safety |
14881 | 10/7/2024 | NOV Response-NOV ESD_SCE_MAZ_20240828_0925
| | Southern California Edison |
14880 | 10/7/2024 | NOV Response-NOV ESD_SCE_RGA_20240828_1504
| | Southern California Edison |
14840 | 10/1/2024 | NOV ESD_BVES_ GCA_20240806_1158_20241001_Response
| | Bear Valley Electric Service, Inc. |
14838 | 9/30/2024 | NOV_ESD_SCE_RGA_20240828_1504
8 page(s) | SCE | Office of Energy Infrastructure Safety |
14837 | 9/30/2024 | NOV_ESD_SCE_MAZ_20240828_0925
8 page(s) | SCE | Office of Energy Infrastructure Safety |
14814 | 9/27/2024 | NOV Response-CAD_SCE_SIS_20240725_1111
| | Southern California Edison |
14794 | 9/20/2024 | NOV Response-CADSCE_SIS_20240725_1017
| | Southern California Edison |
14793 | 9/20/2024 | NOV Response-CADSCE_SIS_20240725_1043
| | Southern California Edison |
14792 | 9/20/2024 | NOV Response-CADSCE_SIS_20240725_1105
| | Southern California Edison |
14791 | 9/20/2024 | NOV Response-SCE_CAC20_20240619_1341
| | Southern California Edison |
14742 | 9/11/2024 | NOV Response-NOV_ESD_SCE_GCA_20240807_0650
| | Southern California Edison |
14741 | 9/11/2024 | NOV Response-NOV_ESD_SCE_GCA_20240807_0750
| | Southern California Edison |
14682 | 8/30/2024 | NOV_CAD_SCE_KSF_20240725_1105
Electrical Infrastructure 9 page(s) | Southern California Edison | Office of Energy Infrastructure Safety |
14678 | 8/30/2024 | NOV_CAD_SCE_SIS_20240725_1017
Electrical Infrastructure 9 page(s) | Southern California Edison | Office of Energy Infrastructure Safety |
14677 | 8/30/2024 | NOV_CAD_SCE_SIS_20240725_1043
Electrical Infrastructure 9 page(s) | Southern California Edison | Office of Energy Infrastructure Safety |
14676 | 8/30/2024 | NOV_CAD_SCE_SIS_20240725_1111
Electrical Infrastructure 9 page(s) | Southern California Edison | Office of Energy Infrastructure Safety |
14663 | 8/28/2024 | NOV ESD_SCE_GCA_20240807_0650
Electrical Infrastructure 8 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
14662 | 8/28/2024 | NOV ESD_SCE_GCA_20240807_0750
Electrical Infrastructure 8 page(s) | Southern California Edison Company | Office of Energy Infrastructure Safety |
14661 | 8/28/2024 | NOV ESD_BVES_GCA_20240806_1158
Electrical Infrastructure 8 page(s) | Bear Valley Electric Service | Office of Energy Infrastructure Safety |
14660 | 8/28/2024 | NOV_CAD_SCE_CAC20_20240619_1341
Electrical Infrastructure 8 page(s) | Southern California Edison | Office of Energy Infrastructure Safety |
14584 | 8/12/2024 | SDGE_GCA_20240612_0908_Response
| | San Diego Gas & Electric |
14583 | 8/12/2024 | SDGE_CAC23_20240619_1251_Response
| | San Diego Gas & Electric |
14486 | 7/29/2024 | PC_GCA_20240604_1017 Response 7-29-24
| | PacifiCorp |
14485 | 7/29/2024 | PC_GCA_20240604_1315 Response 7-29-24
| | PacifiCorp |
14423 | 7/12/2024 | NOV_SDGE_CAC23_20240619_1251
8 page(s) | SDG&E | Office of Energy Safety |
14321 | 6/28/2024 | PC_GCA_20240604_1315
8 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |
14320 | 6/28/2024 | SDG_GCA_20240612_0908
8 page(s) | San Diego Gas and Electric Company | Office of Energy Infrastructure Safety |
14319 | 6/28/2024 | PC_GCA_20240604_1017.pdf
8 page(s) | PacifiCorp | Office of Energy Infrastructure Safety |