14204 | 6/11/2024 | PacifiCorp 2022 Wildfire Mitigation Plan Update
| | PacifiCorp |
12525 | 2/18/2022 | 2022-02-18_SCE_2022_WMP-Update-Confidential-Application-Documents1_R0
| | Southern California Edison |
12523 | 3/3/2022 | DRU-4683.02_R1 OEIS Confidentiality Declaration Updated Confidentiality Declaration for "2022-02-25_PGE_2022_WMP-Update_R0_Section 4.6_Remedy 21-14_Atch01_CONF_R1" | | PG&E |
12520 | 2/25/2022 | DRU-4683_OEIS Confidentiality Declaration
| | PG&E |
12519 | 2/25/2022 | DRU-4744_OEIS Confidentiality Declaration
| | PG&E |
12305 | 5/17/2023 | 2022 Final WMP Decision HWT and cover letter
Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12304 | 5/17/2023 | 2022 Final WMP Decision TBC and cover letter
Electrical Infrastructure | | Office of Energy Infrastructure Safety |
12111 | 4/25/2023 | PG&E's Inadvertent Upload of Confidential Data
| | PG&E |
11839 | 2/9/2023 | Office of Energy Infrastructure Safety Decision on San Diego Gas & Electric Company’s Change Order Request This letter constitutes the approval by the Office of Energy Infrastructure Safety of the change order request submitted on October 14, 2022, by San Diego Gas & Electric Company pertaining to its 2022 Wildfire Mitigation Plan Update. Electrical Infrastructure | SDG&E | Office of Energy Infrastructure Safety |
11804 | 1/17/2023 | PGE - EPSS Monthly Report - January 17, 2023 Attachment
| | PG&E |
11803 | 1/17/2023 | PGE - EPSS Monthly Report - January 17, 2023
| | PG&E |
11776 | 12/15/2022 | PG&E EPSS Monthly Report - December 15, 2022
| | PG&E |
11775 | 12/15/2022 | PG&E EPSS Outages Monthly Report - December 15, 2022
| | PG&E |
11770 | 12/14/2022 | Liberty Maturity Survey Summary A table summarizing Liberty Utilities' Maturity Survey responses | | Office of Energy Infrastructure Safety |
11760 | 12/13/2022 | PG&E Maturity Survey Summary A table summarizing PG&E’s Maturity Survey responses Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11757 | 12/9/2022 | Final Decision on PacifiCorp's 2022 WMP Update The Office of Energy Infrastructure Safety’s final Decision on PacifiCorp's 2022 Wildfire Mitigation Plan (WMP) Update. This Decision documents Energy Safety’s approval of PacifiCorp’s 2022 WMP Update. | | Office of Energy Infrastructure Safety |
11743 | 12/6/2022 | Final Decision on BVES's 2022 WMP Update The Office of Energy Infrastructure Safety’s final Decision on Bear Valley Electric Service, Inc.’s (BVES) 2022 Wildfire Mitigation Plan (WMP) Update. This Decision documents Energy Safety’s approval of BVES’s 2022 WMP Update. | | Office of Energy Infrastructure Safety |
11742 | 12/5/2022 | BVES Reply Comments on Green Power institute Comments
Electrical Infrastructure | | Bear Valley Electric Service, Inc. |
11726 | 11/28/2022 | Extension of Reply Comment Deadline for Draft Decision on BVES's 2022 WMP Update Extension of the reply comment timeframe for Draft Decision on Bear Valley Electric Service Inc.’s 2022 Wildfire Mitigation Plan Update. | | Office of Energy Infrastructure Safety |
11721 | 11/21/2022 | Comments on Decision on BVES 2022 Update
| | Green Power Institute |
11707 | 11/18/2022 | BVES Comments on 2022 WMP Update Draft Decision BVES Comments on 2022 WMP Update Draft Decision Electrical Infrastructure | Melissa Semcer | Bear Valley Electric Service, Inc. |
11701 | 11/17/2022 | SB 884 Undergrounding Program Initiation Letter Letter presenting the initial joint approach of Energy Safety and the CPUC to the new Electrical Undergrounding Program pursuant to Senate Bill 884 Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11690 | 11/15/2022 | PG&E EPSS Outages Monthly Report - November 15, 2022
| | PG&E |
11689 | 11/15/2022 | PG&E EPSS Monthly Report - November 15, 2022
| | PG&E |
11685 | 11/10/2022 | Final Decision on PG&E's 2022 WMP Update Office of Energy Infrastructure Safety’s Final Decision on Pacific Gas and Electric Company’s 2022 Wildfire Mitigation Plan Update Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11680 | 11/8/2022 | Revised 2022 Change Order Guidelines_Final The Revised 2022 Change Order Guidelines, adopted Nov. 8, 2022, includes an extension on the Nov. 1, 2022, change order request deadline for electrical corporations whose WMP Update has not been approved as of Nov. 1, 2022. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11678 | 11/7/2022 | Public Advocates Office Comments on OEIS Draft Decision on PGE 2022 WMP Update
| | California Public Utilities Commission |
11674 | 11/7/2022 | PG&E's Reply Comments on Draft Decision 2022 WMP Update
| | PG&E |
11661 | 11/4/2022 | Draft Decision on PacifiCorp’s 2022 Wildfire Mitigation Plan Update The Draft Decision of the Office of Energy Infrastructure Safety presenting its evaluation of PacifiCorp's 2022 Wildfire Mitigation Plan Update. 149 page(s) | | Office of Energy Infrastructure Safety |
11653 | 11/2/2022 | Final Decision on Liberty's 2022 WMP Update The Office of Energy Infrastructure Safety's Final Decision on Liberty Utilities' 2022 Wildfire Mitigation Plan Update. | | Office of Energy Infrastructure Safety |
11616 | 10/31/2022 | Draft Decision on 2022 Wildfire Mitigation Plan Update for Bear Valley Electric Service Inc. The Draft Decision of the Office of Energy Infrastructure Safety presenting its evaluation of Bear Valley Electric Service Inc.'s 2022 Wildfire Mitigation Plan Update. 162 page(s) | | Office of Energy Infrastructure Safety |
11602 | 10/26/2022 | GPI Comments on Draft Decision on PG&E 2022 WMP Update
| | Green Power Institute |
11592 | 10/26/2022 | Public Advocates Office Comments
| | California Public Utilities Commission |
11587 | 10/26/2022 | Comments of Pacific Gas and Electric Company on Draft Decision
| | PG&E |
11564 | 10/14/2022 | SDGE change order request
| | San Diego Gas & Electric |
11561 | 10/13/2022 | PacifiCorp_DR-Summary_20221013
| | PacifiCorp |
11560 | 10/11/2022 | Extension Letter on BVES's Draft Decision Extension of the evaluation timeframe for Bear Valley Electric Service Inc.’s 2022 Wildfire Mitigation Plan Update | | Office of Energy Infrastructure Safety |
11558 | 10/7/2022 | Draft Revised 2022 Change Order Guidelines with Cover Letter This revision of the 2022 Change Order Guidelines changes the deadline for the submission of change order requests for electrical corporations receiving decisions on their 2022 WMP Updates after Nov. 1, 2022 (the original deadline for change order requests). Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11553 | 10/6/2022 | Draft Decision on 2022 Wildfire Mitigation Plan Update for Pacific Gas And Electric Company Enclosed is the Draft Decision on Pacific Gas and Electric Company’s 2022 WMP Update. Electrical Infrastructure 456 page(s) | Stakeholders | Office of Energy Infrastructure Safety |
11539 | 9/29/2022 | BVES 2022 WMP Update Revision BVES Response to CalAdvocates and Green Power Institute Comments on its 2022 WMP Update Revision Electrical Infrastructure | | Bear Valley Electric Service, Inc. |
11533 | 9/27/2022 | 2022 WMP Liberty Draft Decision The Draft Decision of the Office of Energy Infrastructure Safety presenting its evaluation of Liberty Utilities’ 2022 Wildfire Mitigation Plan Update. | | Office of Energy Infrastructure Safety |
11494 | 9/19/2022 | Comments on Responses to 2022 BVES WMP Revision Notice
| | Green Power Institute |
11493 | 9/19/2022 | Public Advocates Office Comments on BVES’s Revised 2022 WMP
| | California Public Utilities Commission |
11492 | 9/20/2022 | PacifiCorp Extension Letter 20220220 Extension of evaluation timeframe for PacifiCorp's 2022 Wildfire Mitigation Plan Update Electrical Infrastructure 1 page(s) | Wildfire Mitigation Plan Stakeholders | Office of Energy Infrastructure Safety |
11490 | 9/16/2022 | PG&E EPSS Outages Monthly Report - September 16, 2022 Updated PG&E EPSS Outages Monthly Report | | PG&E |
11486 | 9/15/2022 | PG&E EPSS Outages Monthly Report - September 15, 2022
| | PG&E |
11485 | 9/15/2022 | PG&E EPSS Monthly Report - September 15, 2022
| | PG&E |
11478 | 9/14/2022 | Extension Letter on Liberty's Draft Decision Extension of the evaluation timeframe for Liberty’s 2022 Wildfire Mitigation Plan Update | | Office of Energy Infrastructure Safety |
11477 | 9/14/2022 | Extension Letter on PG&E's Draft Decision Extension of the evaluation timeframe for Pacific Gas and Electric Company’s 2022 Wildfire Mitigation Plan Update 1 page(s) | Stakeholders | Office of Energy Infrastructure Safety |
11441 | 8/29/2022 | BVES Response to OEIS Revision Notice BVES response to OEIS regarding its July 22, 2022 issued Revision Notice RE: BVES 2022 Wildfire Mitigation Plan (WMP). OEIS requested revisions to BVES's 2022 WMP. | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
11440 | 8/29/2022 | BVES 2022 Wildfire Mitigation Plan Revision 1 BVES's revised 2022 Wildfire Mitigation Plan (WMP) Revision 1. Revisions made in response to OEIS's Revision Notice issued on July 22, 2022. Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
11437 | 8/25/2022 | Liberty 2022 WMP Update_Cover Letter for Supplement Table 5.3-1
| | Liberty Utilities |
11436 | 8/25/2022 | Liberty 2022 WMP Update_Supplement Table 5.3-1
| | Liberty Utilities |
11413 | 8/23/2022 | 2022-08-22 PC WMP Comments
| | PacifiCorp |
11405 | 8/22/2022 | Attachment 02 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
| | PG&E |
11404 | 8/22/2022 | Reply Comments of Pacific Gas and Electric Company on the Revised 2022 Wildfire Mitigation Plan
| | PG&E |
11400 | 8/22/2022 | Liberty Utilities 2022 WMP Update Reply Comments
| | Liberty Utilities |
11399 | 8/22/2022 | Attachment 01 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
| | PG&E |
11398 | 8/22/2022 | Attachment 02 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
| | PG&E |
11397 | 8/22/2022 | Attachment 01 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
| | PG&E |
11396 | 8/22/2022 | Reply Comments of Pacific Gas and Electric Company on the Revised 2022 Wildfire Mitigation Plan
| | PG&E |
11366 | 8/18/2022 | Letter Granting Extension for BVES's Revision Notice Response BVES requests a one-week extension to August 29, 2022, to submit its Revision Notice Response. BVES’s request is granted. BVES’s revisions to its 2022 Wildfire Mitigation Plan are due no later than 5 PM Pacific Standard Time on August 29, 2022. | | Office of Energy Infrastructure Safety |
11363 | 8/17/2022 | BVES Request for Time Extension for Revisions to 2022 WMP BVES letter to Office of Energy Infrastructure Safety requesting time extension in order to prepare and filed its 2022 WMP update Revision Notice 1. Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
11360 | 8/15/2022 | PGE - EPSS Monthly Report - August 15, 2022
| | PG&E |
11359 | 8/15/2022 | PGE - EPSS Outages Monthly Report 20220815
| | PG&E |
11358 | 8/15/2022 | Public Advocates Office Public Advocates Office Comments on PacifiCorp's Resubmitted 2022 WMP 11 page(s) | Caroline Thomas Jacobs | California Public Utilities Commission |
11356 | 8/15/2022 | Comments of RCRC on the SMJU 2022 WMP Updates Comments of the Rural County Representatives of California (RCRC) on Liberty Utilities and PacifiCorp's 2022 Wildfire Mitigation Plan Updates, as revised. 2 page(s) | | Rural County Representatives of California |
11345 | 8/14/2022 | Final Decision on SCE's 2022 Wildfire Mitigation Plan Update Replaces TN# 11160. The Office of Energy Infrastructure Safety's Final Decision on Southern California Edison Company's 2022 Wildfire Mitigation Plan Update. 220 page(s) | | Office of Energy Infrastructure Safety |
11341 | 8/16/2022 | 2022 Change Order Guidelines Guidelines for electrical utilities seeking to change initiatives described in their approved 2022 Wildfire Mitigation Plans Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11335 | 8/12/2022 | 2022 Change Order Guidelines - Redline Version Draft 2022 Change Order Guidelines showing Energy Safety’s changes (redline version) Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11333 | 8/12/2022 | 2022 Change Order Guidelines - Redline Version
Draft 2022 Change Order Guidelines showing Energy Safety’s changes (redline version) Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11320 | 8/10/2022 | Comments on PG&E Responses to Revision Notice
| | Green Power Institute |
11318 | 8/10/2022 | Public Advocates Office Comments Public Advocates Office Comments on PG&E's Revised 2022-WMP Electrical Infrastructure | | California Public Utilities Commission |
11317 | 8/10/2022 | WMP-2022 - MGRA Comments on PG&E Revision Notice Responses
Electrical Infrastructure | | Mussey Grade Road Alliance |
11313 | 8/9/2022 | 2022 Change Order Guidelines - Redline Version Draft 2022 Change Order Guidelines showing Energy Safety’s changes (redline version) Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11265 | 7/28/2022 | Office of Energy Infrastructure Safety’s Draft Decision on Horizon West Transmissions 2022 Wildfire Mitigation Plan Update
Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11264 | 7/28/2022 | Office of Energy Infrastructure Safety’s Draft Decision on Trans Bay Cable 2022 Wildfire Mitigation Update
Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11243 | 7/26/2022 | Public Advocates Office Comments
| | California Public Utilities Commission |
11242 | 7/26/2022 | PGE_RNR_Change_Log
| | PG&E |
11241 | 7/26/2022 | Additional Documents Referenced in 2022 WMP
| | PG&E |
11240 | 7/26/2022 | PGE_2022_WMP-Update_R1
| | PG&E |
11239 | 7/26/2022 | PGE_2022_WMP-Update_R1_Redline
| | PG&E |
11238 | 7/26/2022 | PGE_22-12_RNR_R2_Atch05
| | PG&E |
11237 | 7/26/2022 | PGE_22-04_RNR_R3_Atch01_Redacted
| | PG&E |
11236 | 7/26/2022 | PGE_22-05_RNR_R2_Atch07
| | PG&E |
11235 | 7/26/2022 | PGE_22-12_RNR_R2_Atch01_Redacted
| | PG&E |
11234 | 7/26/2022 | PGE_22-12_RNR_R2_Atch02
| | PG&E |
11233 | 7/26/2022 | PGE_22-12_RNR_R2_Atch03_Redacted
| | PG&E |
11232 | 7/26/2022 | PGE_22-12_RNR_R2_Atch04
| | PG&E |
11231 | 7/26/2022 | PGE_22-05_RNR_R2_Atch02
| | PG&E |
11230 | 7/26/2022 | PGE_22-05_RNR_R2_Atch03
| | PG&E |
11229 | 7/26/2022 | PGE_22-05_RNR_R2_Atch04
| | PG&E |
11228 | 7/26/2022 | PGE_22-05_RNR_R2_Atch05
| | PG&E |
11227 | 7/26/2022 | PGE_22-05_RNR_R2_Atch06
| | PG&E |
11226 | 7/26/2022 | PGE_22-07_RNR_R1_Atch01
| | PG&E |
11225 | 7/26/2022 | PGE_22-07_RNR_R1_Atch02
| | PG&E |
11224 | 7/26/2022 | PGE_22-13_RNR_R1_Atch01
| | PG&E |
11222 | 7/26/2022 | PGE_22-13_RNR_R1_Atch02
| | PG&E |
11221 | 7/26/2022 | PGE_22-05_RNR_R2_Atch01
| | PG&E |
11220 | 7/26/2022 | Section 4.6_Atch01
| | PG&E |
11219 | 7/26/2022 | Section 4.6_Atch01_Redline
| | PG&E |
11218 | 7/26/2022 | Section 7.3.a_Atch01
| | PG&E |
11217 | 7/26/2022 | Section 7.3.a_Atch04
| | PG&E |
11216 | 7/26/2022 | Section 7.3.a_Atch08
| | PG&E |
11215 | 7/26/2022 | Section 7.3.a_Atch09
| | PG&E |
11214 | 7/26/2022 | Section 7.3.a_Atch10
| | PG&E |
11213 | 7/26/2022 | Section 8.2.4_Atch01_Redacted
| | PG&E |
11212 | 7/26/2022 | Section 8.6_Atch01_R1
| | PG&E |
11211 | 7/26/2022 | Section 7.3.a_Atch02
| | PG&E |
11210 | 7/26/2022 | Section 7.3.a_Atch03
| | PG&E |
11209 | 7/26/2022 | Section 7.3.a_Atch05
| | PG&E |
11208 | 7/26/2022 | Section 7.3.a_Atch06_R1
| | PG&E |
11207 | 7/26/2022 | Section 7.3.a_Atch07
| | PG&E |
11206 | 7/26/2022 | Section 4.6_Remedy 21-09_Atch01
| | PG&E |
11205 | 7/26/2022 | Section 4.6_Remedy 21-09_Atch02
| | PG&E |
11204 | 7/26/2022 | Section 4.6_Remedy 21-14_Atch01_Redacted_R1
| | PG&E |
11203 | 7/26/2022 | Section 7.1.E_Atch01
| | PG&E |
11201 | 7/26/2022 | Section 7.1.H_Atch01
| | PG&E |
11200 | 7/26/2022 | Section 4.6_Remedy 5.4.B_Atch02
| | PG&E |
11199 | 7/26/2022 | Section 4.6_Remedy 5.4.B_Atch03
| | PG&E |
11198 | 7/26/2022 | Section 4.6_Remedy 5.5.A_Atch01_Redacted
| | PG&E |
11197 | 7/26/2022 | Section 4.6_Remedy 5.5.C_Atch01
| | PG&E |
11196 | 7/26/2022 | Section 4.6_Remedy 5.5.D_Atch01
| | PG&E |
11195 | 7/26/2022 | Section 4.3_Atch01
| | PG&E |
11194 | 7/26/2022 | Section 4.5.1_Atch01
| | PG&E |
11193 | 7/26/2022 | Section 4.5.1_Atch02_Redacted
| | PG&E |
11192 | 7/26/2022 | Section 4.6_Atch02
| | PG&E |
11191 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch04 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11190 | 7/26/2022 | Section 4.6_Remedy 5.4.B_Atch01
| | PG&E |
11189 | 7/26/2022 | Section 4.2.1_Atch01_Redacted
| | PG&E |
11188 | 7/26/2022 | Section 4.2.1_Atch02
| | PG&E |
11187 | 7/26/2022 | Section 4.2.1_Atch03
| | PG&E |
11186 | 7/26/2022 | Section 4.1_Atch01
| | PG&E |
11185 | 7/26/2022 | Section 4.1_Atch02
| | PG&E |
11183 | 7/26/2022 | Attachment to PG&E’s 2022 WMP – 60-Day Revision Notice Response – July 26, 2022
| | PG&E |
11182 | 7/26/2022 | PG&E’s 2022 Wildfire Mitigation Plan – 60-Day Revision Notice Response – July 26, 2022
| | PG&E |
11181 | 7/26/2022 | PG&E's 2022 Wildfire Mitigation Plan Revision Notice Responses Cover Letter
| | PG&E |
11171 | 7/22/2022 | Revision Notice for BVES's 2022 WMP Update Revision Notice for Bear Valley Electric Service Inc.'s 2022 Wildfire Mitigation Plan Update. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
11160 | 7/20/2022 | Final Decision on SCE's 2022 Wildfire Mitigation Plan Update The Office of Energy Infrastructure Safety's Final Decision on Southern California Edison Company's 2022 Wildfire Mitigation Plan Update. 220 page(s) | | Office of Energy Infrastructure Safety |
11158 | 7/18/2022 | PacifiCorp 2022 Wildfire Mitigation Plan Cover Letter
| | PacifiCorp |
11157 | 7/18/2022 | PacifiCorp 2022 Wildfire Mitigation Plan Update – Redline
| | PacifiCorp |
11156 | 7/18/2022 | TBC Cover Letter and Erratum Report to 2022 WMP
| | Trans Bay Cable LLC |
11143 | 7/15/2022 | 2022-07-15_LU_2022_WMP-Update_R1_redlined
| | Liberty Utilities |
11142 | 7/15/2022 | 2022-07-15_LU_2022_WMP-Update_R1
| | Liberty Utilities |
11136 | 7/11/2022 | PG&E's 2022 WMP Revision Notice Confidentiality Declaration
| | PG&E |
11128 | 7/11/2022 | PG&E's 2022 Wildfire Mitigation Plan Revision Notice Responses Cover Letter
| | PG&E |
11127 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch04 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11126 | 7/11/2022 | 2022-07-11_PGE_22-12_RNR_R2_Atch01_Redacted Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11125 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch03 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11124 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch02 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11123 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch01 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11122 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch07 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11121 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch06 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11120 | 7/11/2022 | 2022-07-11_PGE_22-05_RNR_R2_Atch05 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11119 | 7/11/2022 | 2022-07-11_PGE_22-12_RNR_R2_Atch05 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11118 | 7/11/2022 | 2022-07-11_PGE_22-12_RNR_R2_Atch04 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11117 | 7/11/2022 | 2022-07-11_PGE_22-12_RNR_R2_Atch03_Redacted Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11116 | 7/11/2022 | 2022-07-11_PGE_22-12_RNR_R2_Atch02 Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022 | | PG&E |
11115 | 7/11/2022 | PG&E's 2022 Wildfire Mitigation Plan - Revision Notice Response - July 11, 2022 Pacific Gas and Electric Company's 2022 Wildfire Mitigation Plan Response to Revision Notice: RN-PG&E-22-02, RN-PG&E-22-03, RN-PG&E-22-05, RN-PG&E-22-12, July 11, 2022 | | PG&E |
11095 | 7/6/2022 | Draft 2022 Change Order Guidelines Energy Safety's Draft 2022 Change Order Guidelines | | Office of Energy Infrastructure Safety |
11093 | 7/5/2022 | SCE Reply Comments re OEIS Draft Decision Approving SCE 2022 WMP Update
| | Southern California Edison |
11092 | 7/5/2022 | Final Decision on SDG&E's 2022 Wildfire Mitigation Plan Update The Office of Energy Infrastructure Safety's Final Decision on San Diego Gas & Electric Company's 2022 Wildfire Mitigation Plan Update. | | Office of Energy Infrastructure Safety |
11049 | 6/28/2022 | 2022 WMP Guidelines Addendum Addendum to 2022 WMP Guidelines Electrical Infrastructure 2 page(s) | Wildfire Mitigation Plan stakeholders | Office of Energy Infrastructure Safety |
11048 | 6/27/2022 | BVES Response Comments on its 2022 Wildfire Mitigation Plan Update BVES Response to Comments of the Public Advocates Office, Green Power Institute, and the California Department of Fish and Wildlife on Bear Valley Electric Service, Inc. 2022 Wildfire Mitigation Plan Update Electrical Infrastructure 17 page(s) | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
11047 | 6/27/2022 | Attachment PGE_22-13_RNR_R1_Atch02 Attachment to PG&E 30-Day Revision Notice Responses | | PG&E |
11046 | 6/27/2022 | Attachment PGE_22-13_RNR_R1_Atch01 Attachment to PG&E 30-Day Revision Notice Responses | | PG&E |
11045 | 6/27/2022 | Attachment PGE_22-07_RNR_R1_Atch02 Attachment to PG&E 30-Day Revision Notice Responses | | PG&E |
11044 | 6/27/2022 | Attachment PGE_22-07_RNR_R1_Atch01 Attachment to PG&E 30-Day Revision Notice Responses | | PG&E |
11043 | 6/27/2022 | PG&E 30-Day Revision Notice Responses
| | PG&E |
11042 | 6/27/2022 | PG&E 30-Day Revision Notice Responses Cover Letter
| | PG&E |
11029 | 6/22/2022 | Public Advocates Office Comments on Draft Decision Approving SCE's 2022 Wildfire Mitigation Plan Update - 2022-WMPs
| | California Public Utilities Commission |
11028 | 6/22/2022 | Comments of the Green Power Institute on the 2022 Update of SCE's WMP
| | Green Power Institute |
11026 | 6/22/2022 | SCE Comments on OEIS Draft Decision approving SCE 2022 WMP Update
| | Southern California Edison |
11024 | 6/22/2022 | MGRA Comments on SCE Draft Decision.
| | Mussey Grade Road Alliance |
11016 | 6/20/2022 | Comments on the 2022 SMJU WMP Updates
| | Green Power Institute |
11015 | 6/20/2022 | Public Advocates Office Comments on 2022 Small Utilities WMPs
| | California Public Utilities Commission |
11013 | 6/20/2022 | SDG&E Reply Comment to Energy Safety Draft Decision on SDG&E 2022 WMP
4 page(s) | | San Diego Gas & Electric |
11007 | 6/17/2022 | CDFW Comments: Trans Bay 2022 WMP Update
| | California Department of Fish and Wildlife |
11006 | 6/17/2022 | CDFW Comments: PacifiCorp 2022 WMP Update
| | California Department of Fish and Wildlife |
11005 | 6/17/2022 | CDFW Comments: Liberty 2022 WMP Update
| | California Department of Fish and Wildlife |
11004 | 6/17/2022 | CDFW Comments: Horizon West 2022 WMP Update
| | California Department of Fish and Wildlife |
11003 | 6/17/2022 | CDFW Comments: BVES 2022 WMP Update
| | California Department of Fish and Wildlife |
10995 | 6/15/2022 | PacifiCorp Rejection for Incompleteness and Order to Resubmit Office of Energy Infrastructure Safety issuance of Rejection for Incompleteness and Order to Resubmit for PacifiCorp's 2022 Wildfire Mitigation Plan Update. PacifiCorp shall revise and resubmit its 2022 Update by July 15, 2022. | | Office of Energy Infrastructure Safety |
10994 | 6/15/2022 | Liberty Rejection for Incompleteness and Order to Resubmit Office of Energy Infrastructure Safety issuance of Rejection for Incompleteness and Order to Resubmit for Liberty's 2022 Wildfire Mitigation Plan Update. Liberty shall revise and resubmit its 2022 Update by July 15, 2022. | | Office of Energy Infrastructure Safety |
10971 | 6/8/2022 | SDG&E Comments on OEIS Draft Decision on SDG&E 2022 WMP
7 page(s) | | San Diego Gas & Electric |
10966 | 6/8/2022 | BVES 2022 WMP ERRATA 2022_06_08 Attachment A First ERRATA for BVES 2022 WMP 2022_06_08 - Attachment A Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10965 | 6/8/2022 | BVES 2022 WMP ERRATA 2022_06_08 First ERRATA for BVES 2022 WMP ERRATA 2022_06_08 Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10964 | 6/8/2022 | Public Advocates Office Comments on OEIS Draft Decision on SDGE 2022 WMP
| | California Public Utilities Commission |
10963 | 6/8/2022 | PacifiCorp 2022 WMP Comment Extension Request
Electrical Infrastructure 2 page(s) | | Downey Brand LLP |
10960 | 6/7/2022 | NCPA Wildfire Mitigation Plan For 2022, the Northern California Power Agency (NCPA) has prepared the following Wildfire Mitigation Plan (WMP) in accordance with California Public Utilities Commission (CPUC) regulation 8387 (SB 901). NCPA is a Joint Powers Agency, which owns and operates several electrical generation facilities to support its members’ generation needs. Electrical Infrastructure 85 page(s) | WSAB | Northern California Power Agency (NCPA) |
10958 | 6/6/2022 | Revision Notice Correction for PG&E's 2022 WMP Update Revision Notice correction for Pacific Gas and Electric Company's 2022 Wildfire Mitigation Plan Update. Electrical Infrastructure 42 page(s) | Subscribers | Office of Energy Infrastructure Safety |
10957 | 6/3/2022 | Comments on the SDG&E Update Evaluation
| | Green Power Institute |
10946 | 6/2/2022 | 2022 SCE Draft Decision with Cover Letter Submitted for public review and comment: the Draft Decision of the Office of Energy Infrastructure Safety (Energy Safety) presenting its evaluation of Southern California Edison Company's 2022 Wildfire Mitigation Plan (WMP) Update.
Electrical Infrastructure 212 page(s) | | Office of Energy Infrastructure Safety |
10939 | 5/26/2022 | PG&E Enhanced Powerline Safety Settings Program Update Enclosed is Enhanced Powerline Safety Settings (EPSS) Program Update, a Pacific Gas and Electric Company presentation to the California Public Utilities Commission dated April 20, 2022. This document is referenced in Energy Safety's Revision Notice for PG&E's 2022 WMP Update. | | Office of Energy Infrastructure Safety |
10934 | 5/26/2022 | Revision Notice for PG&E's 2022 WMP Update Revision Notice for Pacific Gas and Electric Company's 2022 Wildfire Mitigation Plan Update. | | Office of Energy Infrastructure Safety |
10920 | 5/19/2022 | 2022 SDG&E Draft Decision with Coverletter Submitted for public review and comment: the Draft Decision of the Office of Energy Infrastructure Safety (Energy Safety) presenting its evaluation of San Diego Gas & Electric Company’s 2022 Wildfire Mitigation Plan (WMP) Update. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
10915 | 5/18/2022 | Energy Safety Presentation - 2022 WMP Workshop for SMJUs and ITOs
| | Office of Energy Infrastructure Safety |
10914 | 5/17/2022 | Cancellation of Public Meeting - Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates
| | Office of Energy Infrastructure Safety |
10911 | 5/17/2022 | Horizon West - 2022 Grid Design and System Hardening
| | Trans Bay Cable |
10910 | 5/17/2022 | TBC Grid Design and System Hardening Slide Deck Trans Bay Cable’s slide deck covering Grid Design and System Hardening for the 2022 WMP Workshop | | Trans Bay Cable |
10909 | 5/16/2022 | BVES Asset Management Data Governance 2022-5-18 BVES Asset Management Data Governance 2022-5-18 Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10908 | 5/16/2022 | BVES Vegetation Management 2022-5-18 BVES Vegetation Management 2022-5-18 Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10907 | 5/16/2022 | BVES Risk Assessment and Mapping 2022-5-18 BVES Risk Assessment and Mapping 2022-5-18 Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10906 | 5/16/2022 | BVES Grid Design System Hardening 2022-5-18 BVES Grid Design System Hardening 2022-5-18 Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10905 | 5/16/2022 | BVES Public Safety Power Shutoffs 2022-5-18 BVES Public Safety Power Shutoffs 2022-5-18 Electrical Infrastructure | Office of Energy Infrastructure Safety | Bear Valley Electric Service, Inc. |
10904 | 5/16/2022 | Corrected Presentation
| | PacifiCorp |
10903 | 5/16/2022 | Liberty 2022 Wildfire Mitigation Plan Update Presentation
| | Liberty Utilities |
10901 | 5/13/2022 | Notice of Public Meeting - Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates Updated notice of public meeting on Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates. Meeting now to be held on June 7, 2022. | | Office of Energy Infrastructure Safety |
10891 | 5/13/2022 | Extension of SCE 2022 WMP Evaluation Extension of the evaluation timeframe for Southern California Edison's 2022 Wildfire Mitigation Plan Update. Draft decision to be published June 2, 2022. | | Office of Energy Infrastructure Safety |
10882 | 5/10/2022 | Notice of Public Meeting - Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates
| | Office of Energy Infrastructure Safety |
10871 | 5/6/2022 | Horizon West Transmission 2022 WMP Update
| | Horizon West Transmission LLC |
10869 | 5/6/2022 | Trans Bay Cable 2022 WMP Update
| | Trans Bay Cable LLC |
10865-1 | 5/6/2022 | WMP Update
| | PacifiCorp |
10865-2 | 5/6/2022 | Cover Letter
| | PacifiCorp |
10864 | 5/6/2022 | Liberty CalPeco's 2022 WMP Update
| | Liberty Utilities |
10863-1 | 5/6/2022 | 2022-05-06 BVES 2022 WMP Update 2022 WMP Signature Page Electrical Infrastructure 1 page(s) | Koko Tomassian | Bear Valley Electric Service, Inc. |
10863-2 | 5/6/2022 | BVES 2022 WMP Update 2022 WMP Update 2022 -05-06 Electrical Infrastructure 516 page(s) | Koko Tomassian | Bear Valley Electric Service, Inc. |
10863-3 | 5/6/2022 | BVES 2021 QDR Q4 R1 Excel Spreadsheet Electrical Infrastructure 12 page(s) | Koko Tomassian | Golden State Water Company |
10837 | 4/29/2022 | Extension of SDG&E 2022 WMP Evaluation Extension of the evaluation timeframe for San Diego Gas & Electric Company's 2022 Wildfire Mitigation Plan Update. Draft decision to be published May 19, 2022. | | Office of Energy Infrastructure Safety |
10836 | 4/29/2022 | PG&E 2022 WMP Update – Fourth Errata April 29, 2022
| | PG&E |
10835 | 4/29/2022 | Notice of 2022 WMP Workshop for SMJUs and ITOs Notice for a May 18, 2022, workshop on the 2022 Wildfire Mitigation Plan submissions by the small and multi-jurisdictional utilities and independent transmission operators. | | Office of Energy Infrastructure Safety |
10811 | 4/25/2022 | PG&E's 2022 WMP Update – Third Errata April 25, 2022
| | PG&E |
10794-1 | 4/18/2022 | Abrams 2022 WMP Reply Comments
| | Self |
10794-2 | 4/18/2022 | Abrams Attachment A: FAA Report Boeing 757 Max
| | Self |
10792 | 4/18/2022 | 2022-04-18_SCE_2022_WMP-Update_Reply-Comments-R0
| | Southern California Edison |
10791 | 4/18/2022 | SDG&E Reply Comments to Large IOUs 2022 WMP Update
15 page(s) | | San Diego Gas & Electric |
10790 | 4/18/2022 | PG&E 2022 WMP Reply Comments
| | PG&E |
10789 | 4/18/2022 | OEIS 2022 WMP Update Reply Comments Update Reply Comments Electrical Infrastructure 7 page(s) | | Adams Broadwell Joseph & Cardozo |
10788 | 4/18/2022 | Mussey Grade Road Alliance 2022 WMP Reply Comments
Electrical Infrastructure | | Mussey Grade Road Alliance |
10787 | 4/14/2022 | Reply Comments of RCRC on Large IOU 2022 WMP Updates Reply Comments of the Rural County Representatives of California (RCRC) on the Large Investor-Owned Utility 2022 Wildfire Mitigation Plan updates. Electrical Infrastructure 3 page(s) | | Rural County Representatives of California |
10767 | 4/12/2022 | Addendum to 2022 WMP Guidelines Addendum to Attachment 5 of the 2022 Wildfire Mitigation Plan Guidelines. The addendum addresses draft decision reply comment due dates and data request weekly summaries. | | Office of Energy Infrastructure Safety |
10766-1 | 4/12/2022 | Energy Safety Letter to BVES on 2022 WMP Data Submittal April 12, 2022, Energy Safety letter to Bear Valley Electric Service regarding 2022 Wildfire Mitigation Plan data submittal. | BVES | Office of Energy Infrastructure Safety |
10766-2 | 4/12/2022 | Energy Safety Letter to Liberty on 2022 WMP Data Submittal April 12, 2022, Energy Safety letter to Liberty Utilities regarding 2022 Wildfire Mitigation Plan data submittal. | Liberty | Office of Energy Infrastructure Safety |
10766-3 | 4/12/2022 | Energy Safety Letter to PacifiCorp on 2022 WMP Data Submittal April 12, 2022, Energy Safety letter to PacifiCorp regarding 2022 Wildfire Mitigation Plan data submittal. | PacifiCorp | Office of Energy Infrastructure Safety |
10765 | 4/11/2022 | Abrams Attachment C
| | Self |
10764 | 4/11/2022 | Abrams Attachment B
| | Self |
10763 | 4/11/2022 | Abrams Attachment A
| | Self |
10762 | 4/11/2022 | Abrams 2022 WMP Comments
| | Self |
10761 | 4/11/2022 | Public Advocates Office Comments on 2022 WMP Updates of the Large IOUs
| | California Public Utilities Commission |
10760 | 4/11/2022 | Public Advocates Office Comments
| | California Public Utilities Commission |
10759-1 | 4/11/2022 | CDFW Comments: PG&E 2022 WMP Update
| | California Department of Fish and Wildlife |
10759-2 | 4/11/2022 | CDFW Comments: SCE 2022 WMP Update
| | California Department of Fish and Wildlife |
10759-3 | 4/11/2022 | CDFW Comments: SDG&E 2022 WMP Update
| | California Department of Fish and Wildlife |
10759-4 | 4/11/2022 | Mussey Grade Road Alliance 2022 WMP Comments
Electrical Infrastructure | | Mussey Grade Road Alliance |
10759-5 | 4/11/2022 | Comments on the 2022 WMP Updates
| | Green Power Institute |
10759-6 | 4/11/2022 | TURN Opening Comments on the 2022 Wildfire Mitigation Plans TURN's Comments on the 2022 Wildfire Mitigation Plans Electrical Infrastructure 49 page(s) | OEIS | The Utility Reform Network |
10758 | 4/11/2022 | Comments of the Rural County Representatives of California on the Large IOU 2022 Wildfire Mitigation Plan Updates Comments on 2022 Wildfire Mitigation Plan Updates of PG&E and Southern California Edison Electrical Infrastructure 7 page(s) | Caroline Thomas Jacobs | Rural County Representatives of California |
10750 | 4/8/2022 | 2022 WMP Update_First Supplement
| | Southern California Edison |
10739-1 | 3/31/2022 | Section 7.3.a_Atch06_R1 PG&E's revised attachment "2022-02-25_PGE_2022_WMP-Update_R0_Section 7.3.a_Atch06_R1.xlsx" | | PG&E |
10739-2 | 3/31/2022 | Section 8.6_Atch01_R1 PG&E's revised attachment "2022-02-25_PGE_2022_WMP-Update_R0_Section 8.6_Atch01_R1.pdf" | | PG&E |
10739-3 | 3/31/2022 | PG&E's 2022 WMP Errata Cover Letter - March 31, 2022
| | PG&E |
10722 | 3/31/2022 | SDG&E 2022 WMP Update Supplement to First Errata
14 page(s) | | San Diego Gas & Electric |
10694-1 | 3/18/2022 | Revised Section 7.3.a_Atch01 Revised "Section 7.3.a_Atch01" to the 2022 WMP | | PG&E |
10694-2 | 3/18/2022 | PG&E 2022 WMP Update Errata Cover Letter
| | PG&E |
10693 | 3/17/2022 | SDG&E 2022 WMP Update First Errata
| | San Diego Gas & Electric |
10688-1 | 3/14/2022 | March 10, 2022 WMP Workshop Introductory Presentation Introductory presentation for the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-2 | 3/14/2022 | March 10, 2022 WMP Workshop Grid Design and System Hardening Presentations Presentations on Grid Design and System Hardening by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-3 | 3/14/2022 | March 10, 2022 WMP Workshop Risk Modeling and Assessment Presentations Presentations on Risk Modeling and Assessment by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-4 | 3/14/2022 | March 10, 2022 WMP Workshop Vegetation Management Presentations Presentations on Vegetation Management by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-5 | 3/14/2022 | March 10, 2022 WMP Workshop Public Safety Power Shutoffs Presentations Presentations on Public Safety Power Shutoffs by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-6 | 3/14/2022 | March 10, 2022 WMP Workshop Asset Managment and Data Governance Presentations Presentations on Asset Management and Data Governance by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-7 | 3/14/2022 | March 10, 2022 WMP Workshop Pacific Gas and Electric Presentations All presentations made by Pacific Gas and Electric at the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-8 | 3/14/2022 | March 10, 2022 WMP Workshop Southern California Edison resentations All presentations made by Southern California Edison at the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10688-9 | 3/14/2022 | March 10, 2022 WMP Workshop San Diego Gas and Electric Presentations All presentations made by San Diego Gas and Electric at the March 10, 2022 WMP Update Workshop. | | Office of Energy Infrastructure Safety |
10683 | 3/11/2022 | March 10, 2022 WMP Workshop Recording Link This document contains only the full title of the workshop and a link to the posted Zoom video recording of the workshop. 1 page(s) | | Office of Energy Infrastructure Safety |
10639 | 2/25/2022 | Section 7.3.a_Atch01
| | PG&E |
10638 | 2/25/2022 | Notice of 2022 Wildfire Mitigation Plan Submissions Workshop Notice for a March 10, 2022 workshop on the 2022 Wildfire Mitigation Plan submissions by large electrical corporations. 3 page(s) | | Office of Energy Infrastructure Safety |
10637-1 | 2/25/2022 | Section 7.3.a_Atch03
| | PG&E |
10637-2 | 2/25/2022 | Section 7.3.a_Atch04
| | PG&E |
10635-1 | 2/25/2022 | Section 7.3.a_Atch06
| | PG&E |
10635-2 | 2/25/2022 | Section 7.3.a_Atch07
| | PG&E |
10635-3 | 2/25/2022 | Section 7.3.a_Atch08
| | PG&E |
10635-4 | 2/25/2022 | Section 7.3.a_Atch09
| | PG&E |
10635-5 | 2/25/2022 | Section 4.6_Remedy 5.4.B_Atch01
| | PG&E |
10635-6 | 2/25/2022 | Section 7.3.a_Atch02
| | PG&E |
10635-7 | 2/25/2022 | Section 7.3.a_Atch05
| | PG&E |
10634-1 | 2/25/2022 | Section 4.1_Atch01
| | PG&E |
10634-2 | 2/25/2022 | Section 4.1_Atch02
| | PG&E |
10634-3 | 2/25/2022 | Section 4.2.1_Atch01_Redacted
| | PG&E |
10634-4 | 2/25/2022 | Section 4.2.1_Atch02
| | PG&E |
10634-5 | 2/25/2022 | Section 4.2.1_Atch03
| | PG&E |
10634-6 | 2/25/2022 | Section 4.3_Atch01
| | PG&E |
10634-7 | 2/25/2022 | Section 4.5.1_Atch01
| | PG&E |
10634-8 | 2/25/2022 | Section 4.5.1_Atch02_Redacted
| | PG&E |
10634-9 | 2/25/2022 | Section 4.6_Atch01
| | PG&E |
10634-10 | 2/25/2022 | Section 4.6_Atch02
| | PG&E |
10634-11 | 2/25/2022 | Section 4.6_Remedy 5.4.B_Atch02
| | PG&E |
10634-12 | 2/25/2022 | Section 4.6_Remedy 5.4.B_Atch03
| | PG&E |
10634-13 | 2/25/2022 | Section 4.6_Remedy 5.5.A_Atch01_Redacted
| | PG&E |
10634-14 | 2/25/2022 | Section 4.6_Remedy 5.5.C_Atch01
| | PG&E |
10634-15 | 2/25/2022 | Section 4.6_Remedy 5.5.D_Atch01
| | PG&E |
10634-16 | 2/25/2022 | Section 4.6_Remedy 21-09_Atch01
| | PG&E |
10634-17 | 2/25/2022 | Section 4.6_Remedy 21-09_Atch02
| | PG&E |
10634-18 | 2/25/2022 | Section 4.6_Remedy 21-14_Atch01_Redacted
| | PG&E |
10634-19 | 2/25/2022 | Section 7.1.E_Atch01
| | PG&E |
10634-20 | 2/25/2022 | Section 7.1.H_Atch01
| | PG&E |
10634-22 | 2/25/2022 | Section 7.3.a_Atch10
| | PG&E |
10634-23 | 2/25/2022 | Section_8.2.4_Atch01_Redacted
| | PG&E |
10634-24 | 2/25/2022 | Section_8.6_Atch01
| | PG&E |
10633 | 2/25/2022 | PG&E's 2022 Wildfire Mitigation Plan PG&E's 2022 Wildfire Mitigation Plan | | PG&E |
10601 | 2/18/2022 | 2022-02-18_SCE_2022_WMP-Update_R0
| | Southern California Edison |
10591-1 | 2/16/2022 | Energy Safety Letter to PG&E on 2021 Q4 and 2022 WMP Data Submission February 16, 2022, Energy Safety letter to Pacific Gas and Electric Company regarding 2021 fourth quarter Quarterly Data Report and 2022 Wildfire Mitigation Plan data submission requirements. | | Office of Energy Infrastructure Safety |
10591-2 | 2/16/2022 | Energy Safety Letter to SCE on 2021 Q4 and 2022 WMP Data Submission February 16, 2022, Energy Safety letter to Southern California Edison regarding 2021 fourth quarter Quarterly Data Report and 2022 Wildfire Mitigation Plan data submission requirements. | | Office of Energy Infrastructure Safety |
10591-3 | 2/16/2022 | Energy Safety Letter to SDG&E on 2021 Q4 and 2022 WMP Data Submission February 16, 2022, Energy Safety letter to San Diego Gas & Electric Company regarding 2021 fourth quarter Quarterly Data Report and 2022 Wildfire Mitigation Plan data submission requirements. | | Office of Energy Infrastructure Safety |
10587-1 | 2/11/2022 | 2022-02-11_SDGE_2022_WMP-Update_R0
Electrical Infrastructure | | San Diego Gas & Electric Company |
10587-2 | 2/11/2022 | Attachment B Tables 1-12.xlsx
Electrical Infrastructure | | San Diego Gas & Electric Company |
10474 | 12/15/2021 | Final 2022 Wildfire Mitigation Plan Update Guidelines Enclosed are attachments that comprise the Final 2022 Wildfire Mitigation Plan (WMP) Update Guidelines. The Final 2022 WMP Update Guidelines incorporate enhancements to support streamlined reporting and evaluation. The attachments are as follows: Attachment 1: Summary of Changes for the 2022 WMP Update Guidelines; Attachment 2: 2022 WMP Update Guidelines Template; Attachment 3: Tables 1-12 Non-Spatial Metrics Data; Attachment 4: 2022 Maturity Model; and Attachment 5: Guidelines for Submission and Review of 2022 WMP Updates. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
10473 | 12/14/2021 | 2022 WMP Guidelines Adoption Public Meeting Slide Deck This slide deck was used during Energy Safety's adoption of the 2022 WMP Guidelines on December 14, 2021. It includes slides describing the changes made to the Guidelines from 2021 to 2022 and changes made to the Draft 2022 WMP Guidelines as a result of public and stakeholder comment. Electrical Infrastructure | | Office of Energy Infrastructure Safety |
10471 | 12/13/2021 | Draft 2022 Wildfire Mitigation Plan Update Guidelines- Revision 1 Enclosed are attachments that comprise the Draft 2022 Wildfire Mitigation Plan (WMP) Update Guidelines- Revision 1. The Draft 2022 WMP Update Guidelines incorporate enhancements to support streamlined reporting and evaluation. The attachments are as follows: Attachment 1: Summary of Changes for the 2022 WMP Update Guidelines (Clean and Redline Versions); Attachment 2: 2022 WMP Update Guidelines Template (Clean and Redline Versions); Attachment 3: Tables 1-12 Non-Spatial Metrics Data; Attachment 4: 2022 Maturity Model; and Attachment 5: Guidelines for Submission and Review of 2022 WMP Updates (Clean and Redline Versions). Electrical Infrastructure | | Office of Energy Infrastructure Safety |
10468 | 12/9/2021 | 2022-WMPs SDGE Reply Comments 2022 WMP Update Draft Guidelines 12 9 2021 Reply Comments re: Draft Update Guidelines Electrical Infrastructure 2 page(s) | Caroline Thomas Jacobs | San Diego Gas & Electric Company |
10467 | 12/9/2021 | SCE Reply Comments on Draft 2022 WMP Guidelines
| | Southern California Edison |
10466 | 12/9/2021 | PG&E Reply Comments on Draft 2022 WMP Guidelines Pacific Gas and Electric Company’s Reply Comments on the Office of Energy
Infrastructure Safety’s Draft 2022 Wildfire Mitigation Plan Update Guidelines 5 page(s) | | PG&E |
10455 | 12/2/2021 | Comments of the Public Advocates Office, Mussey Grade Road Alliance, and The Utility Reform Network on the Draft 2022 Wildfire M
| | California Public Utilities Commission |
10454 | 12/2/2021 | PG&E's Comments on the OEIS’s Draft 2022 Wildfire Mitigation Plan Pacific Gas and Electric Company’s Comments on the Office of Energy
Infrastructure Safety’s Draft 2022 Wildfire Mitigation Plan Update Guidelines | | PG&E |
10453 | 12/2/2021 | SCE Comments on Draft 2022 WMP Guidelines
| | Southern California Edison |
10452 | 12/2/2021 | 2022-WMPs SDGE Comments 2022 WMP Update Draft Guidelines 12 2 21 SDGE Comments on 2022 WMP Update Draft Guidelines Electrical Infrastructure 5 page(s) | Director, Caroline Thomas Jacobs | San Diego Gas & Electric Company |
10451 | 12/2/2021 | California Association of Small and Multi-Jurisdictional Utilities Comments on Draft 2022 WMP Guidelines
| | California Association of Small and Multi-Jurisdictional Utilities |
10449 | 12/2/2021 | Notice- Adoption of 2022 WMP Guidelines Public Meeting This document serves as notice of a public meeting for the adoption of the 2022 Wildfire Mitigation Plan Update Guidelines on Tuesday, December 14, 2021. Electrical Infrastructure 2 page(s) | | Office of Energy Infrastructure Safety |
10444 | 11/9/2021 | Draft 2022 Wildfire Mitigation Plan Update Guidelines Enclosed are attachments that comprise the Draft 2022 Wildfire Mitigation Plan (WMP) Update Guidelines. The Draft 2022 WMP Update Guidelines incorporate enhancements to support streamlined reporting and evaluation. The attachments are as follows: Attachment 1: Summary of Changes for the 2022 WMP Update Guidelines; Attachment 2: 2022 WMP Update Guidelines Template (Clean and Redline Versions); Attachment 3: Tables 1-12 Non-Spatial Metrics Data; Attachment 4: 2022 Maturity Model (Clean and Redline Versions); and Attachment 5: Guidelines for Submission and Review of 2022 WMP Updates.
| | Office of Energy Infrastructure Safety |