Docket Log

REF #Docketed DateDocument TitleToFrom
125252/18/20222022-02-18_SCE_2022_WMP-Update-Confidential-Application-Documents1_R0
 Southern California Edison
125233/3/2022DRU-4683.02_R1 OEIS Confidentiality Declaration
Updated Confidentiality Declaration for "2022-02-25_PGE_2022_WMP-Update_R0_Section 4.6_Remedy 21-14_Atch01_CONF_R1"
 PG&E
125202/25/2022DRU-4683_OEIS Confidentiality Declaration
 PG&E
125192/25/2022DRU-4744_OEIS Confidentiality Declaration
 PG&E
123055/17/20232022 Final WMP Decision HWT and cover letter

Electrical Infrastructure
 Office of Energy Infrastructure Safety
123045/17/20232022 Final WMP Decision TBC and cover letter

Electrical Infrastructure
 Office of Energy Infrastructure Safety
121114/25/2023PG&E's Inadvertent Upload of Confidential Data
 PG&E
118392/9/2023Office of Energy Infrastructure Safety Decision on San Diego Gas & Electric Company’s Change Order Request
This letter constitutes the approval by the Office of Energy Infrastructure Safety of the change order request submitted on October 14, 2022, by San Diego Gas & Electric Company pertaining to its 2022 Wildfire Mitigation Plan Update.
Electrical Infrastructure
SDG&EOffice of Energy Infrastructure Safety
118041/17/2023PGE - EPSS Monthly Report - January 17, 2023 Attachment
 PG&E
118031/17/2023PGE - EPSS Monthly Report - January 17, 2023
 PG&E
1177612/15/2022 PG&E EPSS Monthly Report - December 15, 2022
 PG&E
1177512/15/2022PG&E EPSS Outages Monthly Report - December 15, 2022
 PG&E
1177012/14/2022Liberty Maturity Survey Summary
A table summarizing Liberty Utilities' Maturity Survey responses
 Office of Energy Infrastructure Safety
1176012/13/2022PG&E Maturity Survey Summary
A table summarizing PG&E’s Maturity Survey responses
Electrical Infrastructure
 OEIS
1175712/9/2022Final Decision on PacifiCorp's 2022 WMP Update
The Office of Energy Infrastructure Safety’s final Decision on PacifiCorp's 2022 Wildfire Mitigation Plan (WMP) Update. This Decision documents Energy Safety’s approval of PacifiCorp’s 2022 WMP Update.
 Office of Energy Infrastructure Safety
1174312/6/2022Final Decision on BVES's 2022 WMP Update
The Office of Energy Infrastructure Safety’s final Decision on Bear Valley Electric Service, Inc.’s (BVES) 2022 Wildfire Mitigation Plan (WMP) Update. This Decision documents Energy Safety’s approval of BVES’s 2022 WMP Update.
 Office of Energy Infrastructure Safety
1174212/5/2022BVES Reply Comments on Green Power institute Comments

Electrical Infrastructure
 Golden State Water Company
1172611/28/2022Extension of Reply Comment Deadline for Draft Decision on BVES's 2022 WMP Update
Extension of the reply comment timeframe for Draft Decision on Bear Valley Electric Service Inc.’s 2022 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
1172111/21/2022Comments on Decision on BVES 2022 Update
 Green Power Institute
1170711/18/2022BVES Comments on 2022 WMP Update Draft Decision
BVES Comments on 2022 WMP Update Draft Decision
Electrical Infrastructure
Melissa SemcerGolden State Water Company
1170111/17/2022SB 884 Undergrounding Program Initiation Letter
Letter presenting the initial joint approach of Energy Safety and the CPUC to the new Electrical Undergrounding Program pursuant to Senate Bill 884
Electrical Infrastructure
 OEIS
1169011/15/2022PG&E EPSS Outages Monthly Report - November 15, 2022
 PG&E
1168911/15/2022PG&E EPSS Monthly Report - November 15, 2022
 PG&E
1168511/10/2022Final Decision on PG&E's 2022 WMP Update
Office of Energy Infrastructure Safety’s Final Decision on Pacific Gas and Electric Company’s 2022 Wildfire Mitigation Plan Update
Electrical Infrastructure
 OEIS
1168011/8/2022Revised 2022 Change Order Guidelines_Final
The Revised 2022 Change Order Guidelines, adopted Nov. 8, 2022, includes an extension on the Nov. 1, 2022, change order request deadline for electrical corporations whose WMP Update has not been approved as of Nov. 1, 2022.
Electrical Infrastructure
 OEIS
1167811/7/2022Public Advocates Office Comments on OEIS Draft Decision on PGE 2022 WMP Update
 CPUC
1167411/7/2022PG&E's Reply Comments on Draft Decision 2022 WMP Update
 PG&E
1166111/4/2022Draft Decision on PacifiCorp’s 2022 Wildfire Mitigation Plan Update
The Draft Decision of the Office of Energy Infrastructure Safety presenting its evaluation of PacifiCorp's 2022 Wildfire Mitigation Plan Update.
149 page(s)
 Office of Energy Infrastructure Safety
1165311/2/2022Final Decision on Liberty's 2022 WMP Update
The Office of Energy Infrastructure Safety's Final Decision on Liberty Utilities' 2022 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
1161610/31/2022Draft Decision on 2022 Wildfire Mitigation Plan Update for Bear Valley Electric Service Inc.
The Draft Decision of the Office of Energy Infrastructure Safety presenting its evaluation of Bear Valley Electric Service Inc.'s 2022 Wildfire Mitigation Plan Update.
162 page(s)
 Office of Energy Infrastructure Safety
1160210/26/2022GPI Comments on Draft Decision on PG&E 2022 WMP Update
 Green Power Institute
1159210/26/2022 Public Advocates Office Comments
 California Public Utilities Commission
1158710/26/2022Comments of Pacific Gas and Electric Company on Draft Decision
 PG&E
1156410/14/2022SDGE_change order request01_1014202
 San Diego Gas & Electric
1156110/13/2022PacifiCorp_DR-Summary_20221013
 PacifiCorp
1156010/11/2022Extension Letter on BVES's Draft Decision
Extension of the evaluation timeframe for Bear Valley Electric Service Inc.’s 2022 Wildfire Mitigation Plan Update
 Office of Energy Infrastructure Safety
1155810/7/2022Draft Revised 2022 Change Order Guidelines with Cover Letter
This revision of the 2022 Change Order Guidelines changes the deadline for the submission of change order requests for electrical corporations receiving decisions on their 2022 WMP Updates after Nov. 1, 2022 (the original deadline for change order requests).
Electrical Infrastructure
 OEIS
1155310/6/2022Draft Decision on 2022 Wildfire Mitigation Plan Update for Pacific Gas And Electric Company
Enclosed is the Draft Decision on Pacific Gas and Electric Company’s 2022 WMP Update.
Electrical Infrastructure
456 page(s)
StakeholdersCalifornia Office of Energy Infrastructure Safety
115399/29/2022BVES 2022 WMP Update Revision
BVES Response to CalAdvocates and Green Power Institute Comments on its 2022 WMP Update Revision
Electrical Infrastructure
 Golden State Water Company
115339/27/20222022 WMP Liberty Draft Decision
The Draft Decision of the Office of Energy Infrastructure Safety presenting its evaluation of Liberty Utilities’ 2022 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
114949/19/2022Comments on Responses to 2022 BVES WMP Revision Notice
 Green Power Institute
114939/19/2022Public Advocates Office Comments on BVES’s Revised 2022 WMP
 CPUC
114929/20/2022PacifiCorp Extension Letter 20220220
Extension of evaluation timeframe for PacifiCorp's 2022 Wildfire Mitigation Plan Update
Electrical Infrastructure
1 page(s)
Wildfire Mitigation Plan StakeholdersOffice of Energy Infrastructure Safety
114909/16/2022PG&E EPSS Outages Monthly Report - September 16, 2022
Updated PG&E EPSS Outages Monthly Report
 PG&E
114869/15/2022PG&E EPSS Outages Monthly Report - September 15, 2022
 PG&E
114859/15/2022PG&E EPSS Monthly Report - September 15, 2022
 PG&E
114789/14/2022Extension Letter on Liberty's Draft Decision
Extension of the evaluation timeframe for Liberty’s 2022 Wildfire Mitigation Plan Update
 Office of Energy Infrastructure Safety
114779/14/2022Extension Letter on PG&E's Draft Decision
Extension of the evaluation timeframe for Pacific Gas and Electric Company’s 2022 Wildfire Mitigation Plan Update
1 page(s)
StakeholdersCalifornia Office of Energy Infrastructure Safety
114418/29/2022BVES Response to OEIS Revision Notice
BVES response to OEIS regarding its July 22, 2022 issued Revision Notice RE: BVES 2022 Wildfire Mitigation Plan (WMP). OEIS requested revisions to BVES's 2022 WMP.
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
114408/29/2022BVES 2022 Wildfire Mitigation Plan Revision 1
BVES's revised 2022 Wildfire Mitigation Plan (WMP) Revision 1. Revisions made in response to OEIS's Revision Notice issued on July 22, 2022.
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
114378/25/2022Liberty 2022 WMP Update_Cover Letter for Supplement Table 5.3-1
 Liberty Utilities
114368/25/2022Liberty 2022 WMP Update_Supplement Table 5.3-1
 Liberty Utilities
114138/23/20222022-08-22 PC WMP Comments
 PacifiCorp
114058/22/2022Attachment 02 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
 PG&E
114048/22/2022Reply Comments of Pacific Gas and Electric Company on the Revised 2022 Wildfire Mitigation Plan
 PG&E
114008/22/2022Liberty Utilities 2022 WMP Update Reply Comments
 Liberty Utilities
113998/22/2022Attachment 01 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
 PG&E
113988/22/2022Attachment 02 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
 PG&E
113978/22/2022Attachment 01 to PG&E's Reply Comments on the Revised 2022 Wildfire Mitigation Plan
 PG&E
113968/22/2022Reply Comments of Pacific Gas and Electric Company on the Revised 2022 Wildfire Mitigation Plan
 PG&E
113668/18/2022Letter Granting Extension for BVES's Revision Notice Response
BVES requests a one-week extension to August 29, 2022, to submit its Revision Notice Response. BVES’s request is granted. BVES’s revisions to its 2022 Wildfire Mitigation Plan are due no later than 5 PM Pacific Standard Time on August 29, 2022.
 Office of Energy Infrastructure Safety
113638/17/2022BVES Request for Time Extension for Revisions to 2022 WMP
BVES letter to Office of Energy Infrastructure Safety requesting time extension in order to prepare and filed its 2022 WMP update Revision Notice 1.
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
113608/15/2022PGE - EPSS Monthly Report - August 15, 2022
 PG&E
113598/15/2022PGE - EPSS Outages Monthly Report 20220815
 PG&E
113588/15/2022Public Advocates Office
Public Advocates Office Comments on PacifiCorp's Resubmitted 2022 WMP
11 page(s)
Caroline Thomas JacobsCA Public Utilities Commission
113568/15/2022Comments of RCRC on the SMJU 2022 WMP Updates
Comments of the Rural County Representatives of California (RCRC) on Liberty Utilities and PacifiCorp's 2022 Wildfire Mitigation Plan Updates, as revised.
2 page(s)
 Rural County Representatives of California
113458/14/2022Final Decision on SCE's 2022 Wildfire Mitigation Plan Update
Replaces TN# 11160. The Office of Energy Infrastructure Safety's Final Decision on Southern California Edison Company's 2022 Wildfire Mitigation Plan Update.
220 page(s)
 Office of Energy Infrastructure Safety
113418/16/20222022 Change Order Guidelines
Guidelines for electrical utilities seeking to change initiatives described in their approved 2022 Wildfire Mitigation Plans
Electrical Infrastructure
 OEIS
113358/12/20222022 Change Order Guidelines - Redline Version
Draft 2022 Change Order Guidelines showing Energy Safety’s changes (redline version)
Electrical Infrastructure
 Office of Energy Infrastructure Safety
113338/12/20222022 Change Order Guidelines - Redline Version
Draft 2022 Change Order Guidelines showing Energy Safety’s changes (redline version)
Electrical Infrastructure
 Office of Energy Infrastructure Safety
113208/10/2022Comments on PG&E Responses to Revision Notice
 Green Power Institute
113188/10/2022Public Advocates Office Comments
Public Advocates Office Comments on PG&E's Revised 2022-WMP
Electrical Infrastructure
 California Public Utilities Commission
113178/10/2022WMP-2022 - MGRA Comments on PG&E Revision Notice Responses

Electrical Infrastructure
 Mussey Grade Road Alliance
113138/9/20222022 Change Order Guidelines - Redline Version
Draft 2022 Change Order Guidelines showing Energy Safety’s changes (redline version)
Electrical Infrastructure
 Office of Energy Infrastructure Safety
112657/28/2022Office of Energy Infrastructure Safety’s Draft Decision on Horizon West Transmissions 2022 Wildfire Mitigation Plan Update

Electrical Infrastructure
 Office of Energy Infrastructure Safety
112647/28/2022Office of Energy Infrastructure Safety’s Draft Decision on Trans Bay Cable 2022 Wildfire Mitigation Update

Electrical Infrastructure
 Office of Energy Infrastructure Safety
112437/26/2022Public Advocates Office Comments
 California Public Utilities Commission
112427/26/2022PGE_RNR_Change_Log
 PG&E
112417/26/2022Additional Documents Referenced in 2022 WMP
 PG&E
112407/26/2022PGE_2022_WMP-Update_R1
 PG&E
112397/26/2022PGE_2022_WMP-Update_R1_Redline
 PG&E
112387/26/2022PGE_22-12_RNR_R2_Atch05
 PG&E
112377/26/2022PGE_22-04_RNR_R3_Atch01_Redacted
 PG&E
112367/26/2022PGE_22-05_RNR_R2_Atch07
 PG&E
112357/26/2022PGE_22-12_RNR_R2_Atch01_Redacted
 PG&E
112347/26/2022PGE_22-12_RNR_R2_Atch02
 PG&E
112337/26/2022PGE_22-12_RNR_R2_Atch03_Redacted
 PG&E
112327/26/2022PGE_22-12_RNR_R2_Atch04
 PG&E
112317/26/2022PGE_22-05_RNR_R2_Atch02
 PG&E
112307/26/2022PGE_22-05_RNR_R2_Atch03
 PG&E
112297/26/2022PGE_22-05_RNR_R2_Atch04
 PG&E
112287/26/2022PGE_22-05_RNR_R2_Atch05
 PG&E
112277/26/2022PGE_22-05_RNR_R2_Atch06
 PG&E
112267/26/2022PGE_22-07_RNR_R1_Atch01
 PG&E
112257/26/2022PGE_22-07_RNR_R1_Atch02
 PG&E
112247/26/2022PGE_22-13_RNR_R1_Atch01
 PG&E
112227/26/2022PGE_22-13_RNR_R1_Atch02
 PG&E
112217/26/2022PGE_22-05_RNR_R2_Atch01
 PG&E
112207/26/2022Section 4.6_Atch01
 PG&E
112197/26/2022Section 4.6_Atch01_Redline
 PG&E
112187/26/2022Section 7.3.a_Atch01
 PG&E
112177/26/2022Section 7.3.a_Atch04
 PG&E
112167/26/2022Section 7.3.a_Atch08
 PG&E
112157/26/2022Section 7.3.a_Atch09
 PG&E
112147/26/2022Section 7.3.a_Atch10
 PG&E
112137/26/2022Section 8.2.4_Atch01_Redacted
 PG&E
112127/26/2022Section 8.6_Atch01_R1
 PG&E
112117/26/2022Section 7.3.a_Atch02
 PG&E
112107/26/2022Section 7.3.a_Atch03
 PG&E
112097/26/2022Section 7.3.a_Atch05
 PG&E
112087/26/2022Section 7.3.a_Atch06_R1
 PG&E
112077/26/2022Section 7.3.a_Atch07
 PG&E
112067/26/2022Section 4.6_Remedy 21-09_Atch01
 PG&E
112057/26/2022Section 4.6_Remedy 21-09_Atch02
 PG&E
112047/26/2022Section 4.6_Remedy 21-14_Atch01_Redacted_R1
 PG&E
112037/26/2022Section 7.1.E_Atch01
 PG&E
112017/26/2022Section 7.1.H_Atch01
 PG&E
112007/26/2022Section 4.6_Remedy 5.4.B_Atch02
 PG&E
111997/26/2022Section 4.6_Remedy 5.4.B_Atch03
 PG&E
111987/26/2022Section 4.6_Remedy 5.5.A_Atch01_Redacted
 PG&E
111977/26/2022Section 4.6_Remedy 5.5.C_Atch01
 PG&E
111967/26/2022Section 4.6_Remedy 5.5.D_Atch01
 PG&E
111957/26/2022Section 4.3_Atch01
 PG&E
111947/26/2022Section 4.5.1_Atch01
 PG&E
111937/26/2022Section 4.5.1_Atch02_Redacted
 PG&E
111927/26/2022Section 4.6_Atch02
 PG&E
111917/11/20222022-07-11_PGE_22-05_RNR_R2_Atch04
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111907/26/2022Section 4.6_Remedy 5.4.B_Atch01
 PG&E
111897/26/2022Section 4.2.1_Atch01_Redacted
 PG&E
111887/26/2022Section 4.2.1_Atch02
 PG&E
111877/26/2022Section 4.2.1_Atch03
 PG&E
111867/26/2022Section 4.1_Atch01
 PG&E
111857/26/2022Section 4.1_Atch02
 PG&E
111837/26/2022Attachment to PG&E’s 2022 WMP – 60-Day Revision Notice Response – July 26, 2022
 PG&E
111827/26/2022PG&E’s 2022 Wildfire Mitigation Plan – 60-Day Revision Notice Response – July 26, 2022
 PG&E
111817/26/2022PG&E's 2022 Wildfire Mitigation Plan Revision Notice Responses Cover Letter
 PG&E
111717/22/2022Revision Notice for BVES's 2022 WMP Update
Revision Notice for Bear Valley Electric Service Inc.'s 2022 Wildfire Mitigation Plan Update.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
111607/20/2022Final Decision on SCE's 2022 Wildfire Mitigation Plan Update
The Office of Energy Infrastructure Safety's Final Decision on Southern California Edison Company's 2022 Wildfire Mitigation Plan Update.
220 page(s)
 Office of Energy Infrastructure Safety
111587/18/2022PacifiCorp 2022 Wildfire Mitigation Plan Cover Letter
 Pacific Power
111577/18/2022PacifiCorp 2022 Wildfire Mitigation Plan Update – Annual Compliance Plan
 Pacific Power
111567/18/2022TBC Cover Letter and Erratum Report to 2022 WMP
 Trans Bay Cable LLC
111437/15/20222022-07-15_LU_2022_WMP-Update_R1_redlined
 Liberty Utilities
111427/15/20222022-07-15_LU_2022_WMP-Update_R1
 Liberty Utilities
111367/11/2022PG&E's 2022 WMP Revision Notice Confidentiality Declaration
 PG&E
111287/11/2022PG&E's 2022 Wildfire Mitigation Plan Revision Notice Responses Cover Letter
 PG&E
111277/11/20222022-07-11_PGE_22-05_RNR_R2_Atch04
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111267/11/20222022-07-11_PGE_22-12_RNR_R2_Atch01_Redacted
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111257/11/20222022-07-11_PGE_22-05_RNR_R2_Atch03
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111247/11/20222022-07-11_PGE_22-05_RNR_R2_Atch02
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111237/11/20222022-07-11_PGE_22-05_RNR_R2_Atch01
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111227/11/20222022-07-11_PGE_22-05_RNR_R2_Atch07
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111217/11/20222022-07-11_PGE_22-05_RNR_R2_Atch06
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111207/11/20222022-07-11_PGE_22-05_RNR_R2_Atch05
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111197/11/20222022-07-11_PGE_22-12_RNR_R2_Atch05
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111187/11/20222022-07-11_PGE_22-12_RNR_R2_Atch04
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111177/11/20222022-07-11_PGE_22-12_RNR_R2_Atch03_Redacted
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111167/11/20222022-07-11_PGE_22-12_RNR_R2_Atch02
Attachment to PG&E's 2022 WMP Revision Notice - July 11, 2022
 PG&E
111157/11/2022PG&E's 2022 Wildfire Mitigation Plan - Revision Notice Response - July 11, 2022
Pacific Gas and Electric Company's 2022 Wildfire Mitigation Plan Response to Revision Notice: RN-PG&E-22-02, RN-PG&E-22-03, RN-PG&E-22-05, RN-PG&E-22-12, July 11, 2022
 PG&E
110957/6/2022Draft 2022 Change Order Guidelines
Energy Safety's Draft 2022 Change Order Guidelines
 Office of Energy Infrastructure Safety
110937/5/2022SCE Reply Comments re OEIS Draft Decision Approving SCE 2022 WMP Update
 Southern California Edison
110927/5/2022Final Decision on SDG&E's 2022 Wildfire Mitigation Plan Update
The Office of Energy Infrastructure Safety's Final Decision on San Diego Gas & Electric Company's 2022 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
110496/28/20222022 WMP Guidelines Addendum
Addendum to 2022 WMP Guidelines
Electrical Infrastructure
2 page(s)
Wildfire Mitigation Plan stakeholdersOffice of Energy Infrastructure Safety
110486/27/2022BVES Response Comments on its 2022 Wildfire Mitigation Plan Update
BVES Response to Comments of the Public Advocates Office, Green Power Institute, and the California Department of Fish and Wildlife on Bear Valley Electric Service, Inc. 2022 Wildfire Mitigation Plan Update
Electrical Infrastructure
17 page(s)
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
110476/27/2022Attachment PGE_22-13_RNR_R1_Atch02
Attachment to PG&E 30-Day Revision Notice Responses
 PG&E
110466/27/2022Attachment PGE_22-13_RNR_R1_Atch01
Attachment to PG&E 30-Day Revision Notice Responses
 PG&E
110456/27/2022Attachment PGE_22-07_RNR_R1_Atch02
Attachment to PG&E 30-Day Revision Notice Responses
 PG&E
110446/27/2022Attachment PGE_22-07_RNR_R1_Atch01
Attachment to PG&E 30-Day Revision Notice Responses
 PG&E
110436/27/2022PG&E 30-Day Revision Notice Responses
 PG&E
110426/27/2022PG&E 30-Day Revision Notice Responses Cover Letter
 PG&E
110296/22/2022Public Advocates Office Comments on Draft Decision Approving SCE's 2022 Wildfire Mitigation Plan Update - 2022-WMPs
 California Public Utilities
110286/22/2022Comments of the Green Power Institute on the 2022 Update of SCE's WMP
 Green Power Institute
110266/22/2022SCE Comments on OEIS Draft Decision approving SCE 2022 WMP Update
 Southern California Edison
110246/22/2022MGRA Comments on SCE Draft Decision.
 Mussey Grade Road Alliance
110166/20/2022Comments on the 2022 SMJU WMP Updates
 Green Power Institute
110156/20/2022Public Advocates Office Comments on 2022 Small Utilities WMPs
 California Public Utilities
110136/20/2022SDG&E Reply Comment to Energy Safety Draft Decision on SDG&E 2022 WMP

4 page(s)
 San Diego Gas & Electric
110076/17/2022CDFW Comments: Trans Bay 2022 WMP Update
 California Department of Fish and Wildlife
110066/17/2022CDFW Comments: PacifiCorp 2022 WMP Update
 California Department of Fish and Wildlife
110056/17/2022CDFW Comments: Liberty 2022 WMP Update
 California Department of Fish and Wildlife
110046/17/2022CDFW Comments: Horizon West 2022 WMP Update
 California Department of Fish and Wildlife
110036/17/2022CDFW Comments: BVES 2022 WMP Update
 California Department of Fish and Wildlife
109956/15/2022PacifiCorp Rejection for Incompleteness and Order to Resubmit
Office of Energy Infrastructure Safety issuance of Rejection for Incompleteness and Order to Resubmit for PacifiCorp's 2022 Wildfire Mitigation Plan Update. PacifiCorp shall revise and resubmit its 2022 Update by July 15, 2022.
 Office of Energy Infrastructure Safety
109946/15/2022Liberty Rejection for Incompleteness and Order to Resubmit
Office of Energy Infrastructure Safety issuance of Rejection for Incompleteness and Order to Resubmit for Liberty's 2022 Wildfire Mitigation Plan Update. Liberty shall revise and resubmit its 2022 Update by July 15, 2022.
 Office of Energy Infrastructure Safety
109716/8/2022SDG&E Comments on OEIS Draft Decision on SDG&E 2022 WMP

7 page(s)
 San Diego Gas & Electric
109666/8/2022BVES 2022 WMP ERRATA 2022_06_08 Attachment A
First ERRATA for BVES 2022 WMP 2022_06_08 - Attachment A
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109656/8/2022BVES 2022 WMP ERRATA 2022_06_08
First ERRATA for BVES 2022 WMP ERRATA 2022_06_08
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109646/8/2022Public Advocates Office Comments on OEIS Draft Decision on SDGE 2022 WMP
 California Public Utilities Commission
109636/8/2022PacifiCorp 2022 WMP Comment Extension Request

Electrical Infrastructure
2 page(s)
 Downey Brand LLP
109606/7/2022NCPA Wildfire Mitigation Plan
For 2022, the Northern California Power Agency (NCPA) has prepared the following Wildfire Mitigation Plan (WMP) in accordance with California Public Utilities Commission (CPUC) regulation 8387 (SB 901). NCPA is a Joint Powers Agency, which owns and operates several electrical generation facilities to support its members’ generation needs.
Electrical Infrastructure
85 page(s)
WSABNorthern California Power Agency (NCPA)
109586/6/2022Revision Notice Correction for PG&E's 2022 WMP Update
Revision Notice correction for Pacific Gas and Electric Company's 2022 Wildfire Mitigation Plan Update.
Electrical Infrastructure
42 page(s)
SubscribersCalifornia Office of Energy Infrastructure Safety
109576/3/2022Comments on the SDG&E Update Evaluation
 Green Power Institute
109466/2/20222022 SCE Draft Decision with Cover Letter
Submitted for public review and comment: the Draft Decision of the Office of Energy Infrastructure Safety (Energy Safety) presenting its evaluation of Southern California Edison Company's 2022 Wildfire Mitigation Plan (WMP) Update. Electrical Infrastructure
212 page(s)
 Office of Energy Infrastructure Safety
109395/26/2022PG&E Enhanced Powerline Safety Settings Program Update
Enclosed is Enhanced Powerline Safety Settings (EPSS) Program Update, a Pacific Gas and Electric Company presentation to the California Public Utilities Commission dated April 20, 2022. This document is referenced in Energy Safety's Revision Notice for PG&E's 2022 WMP Update.
 Office of Energy Infrastructure Safety
109345/26/2022Revision Notice for PG&E's 2022 WMP Update
Revision Notice for Pacific Gas and Electric Company's 2022 Wildfire Mitigation Plan Update.
 Office of Energy Infrastructure Safety
109205/19/20222022 SDG&E Draft Decision with Coverletter
Submitted for public review and comment: the Draft Decision of the Office of Energy Infrastructure Safety (Energy Safety) presenting its evaluation of San Diego Gas & Electric Company’s 2022 Wildfire Mitigation Plan (WMP) Update.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
109155/18/2022Energy Safety Presentation - 2022 WMP Workshop for SMJUs and ITOs
 Office of Energy Infrastructure Safety
109145/17/2022Cancellation of Public Meeting - Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates
 Office of Energy Infrastructure Safety
109115/17/2022Horizon West - 2022 Grid Design and System Hardening
 Trans Bay Cable
109105/17/2022TBC Grid Design and System Hardening Slide Deck
Trans Bay Cable’s slide deck covering Grid Design and System Hardening for the 2022 WMP Workshop
 Trans Bay Cable
109095/16/2022BVES Asset Management Data Governance 2022-5-18
BVES Asset Management Data Governance 2022-5-18
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109085/16/2022BVES Vegetation Management 2022-5-18
BVES Vegetation Management 2022-5-18
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109075/16/2022BVES Risk Assessment and Mapping 2022-5-18
BVES Risk Assessment and Mapping 2022-5-18
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109065/16/2022BVES Grid Design System Hardening 2022-5-18
BVES Grid Design System Hardening 2022-5-18
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109055/16/2022BVES Public Safety Power Shutoffs 2022-5-18
BVES Public Safety Power Shutoffs 2022-5-18
Electrical Infrastructure
Office of Energy Infrastructure SafetyBear Valley Electric Service, Inc.
109045/16/2022Corrected Presentation
 PacifiCorp
109035/16/2022Liberty 2022 Wildfire Mitigation Plan Update Presentation
 Liberty Utilities
109015/13/2022Notice of Public Meeting - Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates
Updated notice of public meeting on Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates. Meeting now to be held on June 7, 2022.
 Office of Energy Infrastructure Safety
108915/13/2022Extension of SCE 2022 WMP Evaluation
Extension of the evaluation timeframe for Southern California Edison's 2022 Wildfire Mitigation Plan Update. Draft decision to be published June 2, 2022.
 Office of Energy Infrastructure Safety
108825/10/2022Notice of Public Meeting - Energy Safety Draft Decisions on SDG&E and SCE's 2022 WMP Updates
 Office of Energy Infrastructure Safety
108715/6/2022Horizon West Transmission 2022 WMP Update
 Horizon West Transmission LLC
108695/6/2022Trans Bay Cable 2022 WMP Update
 Trans Bay Cable LLC
10865-15/6/2022WMP Update
 PacifiCorp
10865-25/6/2022Cover Letter
 PacifiCorp
108645/6/2022Liberty CalPeco's 2022 WMP Update
 Liberty Utilities
10863-15/6/20222022-05-06 BVES 2022 WMP Update
2022 WMP Signature Page
Electrical Infrastructure
1 page(s)
Koko TomassianGolden State Water Company
10863-25/6/2022BVES 2022 WMP Update
2022 WMP Update 2022 -05-06
Electrical Infrastructure
516 page(s)
Koko TomassianGolden State Water Company
10863-35/6/2022BVES 2021 QDR Q4 R1
Excel Spreadsheet
Electrical Infrastructure
12 page(s)
Koko TomassianGolden State Water Company
108374/29/2022Extension of SDG&E 2022 WMP Evaluation
Extension of the evaluation timeframe for San Diego Gas & Electric Company's 2022 Wildfire Mitigation Plan Update. Draft decision to be published May 19, 2022.
 Office of Energy Infrastructure Safety
108364/29/2022PG&E 2022 WMP Update – Fourth Errata April 29, 2022
 PG&E
108354/29/2022Notice of 2022 WMP Workshop for SMJUs and ITOs
Notice for a May 18, 2022, workshop on the 2022 Wildfire Mitigation Plan submissions by the small and multi-jurisdictional utilities and independent transmission operators.
 Office of Energy Infrastructure Safety
108114/25/2022PG&E's 2022 WMP Update – Third Errata April 25, 2022
 PG&E
10794-14/18/2022Abrams 2022 WMP Reply Comments
 Self
10794-24/18/2022Abrams Attachment A: FAA Report Boeing 757 Max
 Self
107924/18/20222022-04-18_SCE_2022_WMP-Update_Reply-Comments-R0
 Southern California Edison
107914/18/2022SDG&E Reply Comments to Large IOUs 2022 WMP Update

15 page(s)
 San Diego Gas & Electric
107904/18/2022PG&E 2022 WMP Reply Comments
 PG&E
107894/18/2022OEIS 2022 WMP Update Reply Comments
Update Reply Comments
Electrical Infrastructure
7 page(s)
 Adams Broadwell Joseph & Cardozo
107884/18/2022Mussey Grade Road Alliance 2022 WMP Reply Comments

Electrical Infrastructure
 Mussey Grade Road Alliance
107874/14/2022Reply Comments of RCRC on Large IOU 2022 WMP Updates
Reply Comments of the Rural County Representatives of California (RCRC) on the Large Investor-Owned Utility 2022 Wildfire Mitigation Plan updates.
Electrical Infrastructure
3 page(s)
 Rural County Representatives of California
107674/12/2022Addendum to 2022 WMP Guidelines
Addendum to Attachment 5 of the 2022 Wildfire Mitigation Plan Guidelines. The addendum addresses draft decision reply comment due dates and data request weekly summaries.
 Office of Energy Infrastructure Safety
10766-14/12/2022Energy Safety Letter to BVES on 2022 WMP Data Submittal
April 12, 2022, Energy Safety letter to Bear Valley Electric Service regarding 2022 Wildfire Mitigation Plan data submittal.
BVESOffice of Energy Infrastructure Safety
10766-24/12/2022Energy Safety Letter to Liberty on 2022 WMP Data Submittal
April 12, 2022, Energy Safety letter to Liberty Utilities regarding 2022 Wildfire Mitigation Plan data submittal.
LibertyOffice of Energy Infrastructure Safety
10766-34/12/2022Energy Safety Letter to PacifiCorp on 2022 WMP Data Submittal
April 12, 2022, Energy Safety letter to PacifiCorp regarding 2022 Wildfire Mitigation Plan data submittal.
PacifiCorpOffice of Energy Infrastructure Safety
107654/11/2022Abrams Attachment C
 Self
107644/11/2022Abrams Attachment B
 Self
107634/11/2022Abrams Attachment A
 Self
107624/11/2022Abrams 2022 WMP Comments
 Self
107614/11/2022Public Advocates Office Comments on 2022 WMP Updates of the Large IOUs
 CPUC
107604/11/2022Public Advocates Office Comments
 California Public Utilities Commission
10759-14/11/2022CDFW Comments: PG&E 2022 WMP Update
 California Department of Fish and Wildlife
10759-24/11/2022CDFW Comments: SCE 2022 WMP Update
 California Department of Fish and Wildlife
10759-34/11/2022CDFW Comments: SDG&E 2022 WMP Update
 California Department of Fish and Wildlife
10759-44/11/2022Mussey Grade Road Alliance 2022 WMP Comments

Electrical Infrastructure
 Mussey Grade Road Alliance
10759-54/11/2022Comments on the 2022 WMP Updates
 Green Power Institute
10759-64/11/2022TURN Opening Comments on the 2022 Wildfire Mitigation Plans
TURN's Comments on the 2022 Wildfire Mitigation Plans
Electrical Infrastructure
49 page(s)
OEISThe Utility Reform Network
107584/11/2022Comments of the Rural County Representatives of California on the Large IOU 2022 Wildfire Mitigation Plan Updates
Comments on 2022 Wildfire Mitigation Plan Updates of PG&E and Southern California Edison
Electrical Infrastructure
7 page(s)
Caroline Thomas JacobsRural County Representatives of California
107504/8/20222022 WMP Update_First Supplement
 Southern California Edison
10739-13/31/2022Section 7.3.a_Atch06_R1
PG&E's revised attachment "2022-02-25_PGE_2022_WMP-Update_R0_Section 7.3.a_Atch06_R1.xlsx"
 PG&E
10739-23/31/2022Section 8.6_Atch01_R1
PG&E's revised attachment "2022-02-25_PGE_2022_WMP-Update_R0_Section 8.6_Atch01_R1.pdf"
 PG&E
10739-33/31/2022PG&E's 2022 WMP Errata Cover Letter - March 31, 2022
 PG&E
107223/31/2022SDG&E 2022 WMP Update Supplement to First Errata

14 page(s)
 San Diego Gas & Electric
10694-13/18/2022Revised Section 7.3.a_Atch01
Revised "Section 7.3.a_Atch01" to the 2022 WMP
 PG&E
10694-23/18/2022PG&E 2022 WMP Update Errata Cover Letter
 PG&E
106933/17/2022SDG&E 2022 WMP Update First Errata
 San Diego Gas & Electric
10688-13/14/2022March 10, 2022 WMP Workshop Introductory Presentation
Introductory presentation for the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-23/14/2022March 10, 2022 WMP Workshop Grid Design and System Hardening Presentations
Presentations on Grid Design and System Hardening by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-33/14/2022March 10, 2022 WMP Workshop Risk Modeling and Assessment Presentations
Presentations on Risk Modeling and Assessment by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-43/14/2022March 10, 2022 WMP Workshop Vegetation Management Presentations
Presentations on Vegetation Management by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-53/14/2022March 10, 2022 WMP Workshop Public Safety Power Shutoffs Presentations
Presentations on Public Safety Power Shutoffs by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-63/14/2022March 10, 2022 WMP Workshop Asset Managment and Data Governance Presentations
Presentations on Asset Management and Data Governance by the three electrical corporations (PG&E, SDG&E and SCE) participating in the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-73/14/2022March 10, 2022 WMP Workshop Pacific Gas and Electric Presentations
All presentations made by Pacific Gas and Electric at the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-83/14/2022March 10, 2022 WMP Workshop Southern California Edison resentations
All presentations made by Southern California Edison at the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
10688-93/14/2022March 10, 2022 WMP Workshop San Diego Gas and Electric Presentations
All presentations made by San Diego Gas and Electric at the March 10, 2022 WMP Update Workshop.
 Office of Energy Infrastructure Safety
106833/11/2022March 10, 2022 WMP Workshop Recording Link
This document contains only the full title of the workshop and a link to the posted Zoom video recording of the workshop.
1 page(s)
 Office of Energy Infrastructure Safety
106392/25/2022Section 7.3.a_Atch01
 PG&E
106382/25/2022Notice of 2022 Wildfire Mitigation Plan Submissions Workshop
Notice for a March 10, 2022 workshop on the 2022 Wildfire Mitigation Plan submissions by large electrical corporations.
3 page(s)
 Office of Energy Infrastructure Safety
10637-12/25/2022Section 7.3.a_Atch03
 PG&E
10637-22/25/2022Section 7.3.a_Atch04
 PG&E
10635-12/25/2022Section 7.3.a_Atch06
 PG&E
10635-22/25/2022Section 7.3.a_Atch07
 PG&E
10635-32/25/2022Section 7.3.a_Atch08
 PG&E
10635-42/25/2022Section 7.3.a_Atch09
 PG&E
10635-52/25/2022Section 4.6_Remedy 5.4.B_Atch01
 PG&E
10635-62/25/2022Section 7.3.a_Atch02
 PG&E
10635-72/25/2022Section 7.3.a_Atch05
 PG&E
10634-12/25/2022Section 4.1_Atch01
 PG&E
10634-22/25/2022Section 4.1_Atch02
 PG&E
10634-32/25/2022Section 4.2.1_Atch01_Redacted
 PG&E
10634-42/25/2022Section 4.2.1_Atch02
 PG&E
10634-52/25/2022Section 4.2.1_Atch03
 PG&E
10634-62/25/2022Section 4.3_Atch01
 PG&E
10634-72/25/2022Section 4.5.1_Atch01
 PG&E
10634-82/25/2022Section 4.5.1_Atch02_Redacted
 PG&E
10634-92/25/2022Section 4.6_Atch01
 PG&E
10634-102/25/2022Section 4.6_Atch02
 PG&E
10634-112/25/2022Section 4.6_Remedy 5.4.B_Atch02
 PG&E
10634-122/25/2022Section 4.6_Remedy 5.4.B_Atch03
 PG&E
10634-132/25/2022Section 4.6_Remedy 5.5.A_Atch01_Redacted
 PG&E
10634-142/25/2022Section 4.6_Remedy 5.5.C_Atch01
 PG&E
10634-152/25/2022Section 4.6_Remedy 5.5.D_Atch01
 PG&E
10634-162/25/2022Section 4.6_Remedy 21-09_Atch01
 PG&E
10634-172/25/2022Section 4.6_Remedy 21-09_Atch02
 PG&E
10634-182/25/2022Section 4.6_Remedy 21-14_Atch01_Redacted
 PG&E
10634-192/25/2022Section 7.1.E_Atch01
 PG&E
10634-202/25/2022Section 7.1.H_Atch01
 PG&E
10634-222/25/2022Section 7.3.a_Atch10
 PG&E
10634-232/25/2022Section_8.2.4_Atch01_Redacted
 PG&E
10634-242/25/2022Section_8.6_Atch01
 PG&E
106332/25/2022PG&E's 2022 Wildfire Mitigation Plan
PG&E's 2022 Wildfire Mitigation Plan
 PG&E
106012/18/20222022-02-18_SCE_2022_WMP-Update_R0
 Southern California Edison
10591-12/16/2022Energy Safety Letter to PG&E on 2021 Q4 and 2022 WMP Data Submission
February 16, 2022, Energy Safety letter to Pacific Gas and Electric Company regarding 2021 fourth quarter Quarterly Data Report and 2022 Wildfire Mitigation Plan data submission requirements.
 Office of Energy Infrastructure Safety
10591-22/16/2022Energy Safety Letter to SCE on 2021 Q4 and 2022 WMP Data Submission
February 16, 2022, Energy Safety letter to Southern California Edison regarding 2021 fourth quarter Quarterly Data Report and 2022 Wildfire Mitigation Plan data submission requirements.
 Office of Energy Infrastructure Safety
10591-32/16/2022Energy Safety Letter to SDG&E on 2021 Q4 and 2022 WMP Data Submission
February 16, 2022, Energy Safety letter to San Diego Gas & Electric Company regarding 2021 fourth quarter Quarterly Data Report and 2022 Wildfire Mitigation Plan data submission requirements.
 Office of Energy Infrastructure Safety
10587-12/11/20222022-02-11_SDGE_2022_WMP-Update_R0

Electrical Infrastructure
 San Diego Gas & Electric Company
10587-22/11/2022Attachment B Tables 1-12.xlsx

Electrical Infrastructure
 San Diego Gas & Electric Company
1047412/15/2021Final 2022 Wildfire Mitigation Plan Update Guidelines
Enclosed are attachments that comprise the Final 2022 Wildfire Mitigation Plan (WMP) Update Guidelines. The Final 2022 WMP Update Guidelines incorporate enhancements to support streamlined reporting and evaluation. The attachments are as follows: Attachment 1: Summary of Changes for the 2022 WMP Update Guidelines; Attachment 2: 2022 WMP Update Guidelines Template; Attachment 3: Tables 1-12 Non-Spatial Metrics Data; Attachment 4: 2022 Maturity Model; and Attachment 5: Guidelines for Submission and Review of 2022 WMP Updates.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1047312/14/20212022 WMP Guidelines Adoption Public Meeting Slide Deck
This slide deck was used during Energy Safety's adoption of the 2022 WMP Guidelines on December 14, 2021. It includes slides describing the changes made to the Guidelines from 2021 to 2022 and changes made to the Draft 2022 WMP Guidelines as a result of public and stakeholder comment.
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1047112/13/2021Draft 2022 Wildfire Mitigation Plan Update Guidelines- Revision 1
Enclosed are attachments that comprise the Draft 2022 Wildfire Mitigation Plan (WMP) Update Guidelines- Revision 1. The Draft 2022 WMP Update Guidelines incorporate enhancements to support streamlined reporting and evaluation. The attachments are as follows: Attachment 1: Summary of Changes for the 2022 WMP Update Guidelines (Clean and Redline Versions); Attachment 2: 2022 WMP Update Guidelines Template (Clean and Redline Versions); Attachment 3: Tables 1-12 Non-Spatial Metrics Data; Attachment 4: 2022 Maturity Model; and Attachment 5: Guidelines for Submission and Review of 2022 WMP Updates (Clean and Redline Versions).
Electrical Infrastructure
 Office of Energy Infrastructure Safety
1046812/9/20212022-WMPs SDGE Reply Comments 2022 WMP Update Draft Guidelines 12 9 2021
Reply Comments re: Draft Update Guidelines
Electrical Infrastructure
2 page(s)
Caroline Thomas JacobsSan Diego Gas & Electric Company
1046712/9/2021SCE Reply Comments on Draft 2022 WMP Guidelines
 Southern California Edison
1046612/9/2021PG&E Reply Comments on Draft 2022 WMP Guidelines
Pacific Gas and Electric Company’s Reply Comments on the Office of Energy Infrastructure Safety’s Draft 2022 Wildfire Mitigation Plan Update Guidelines
5 page(s)
 PG&E
1045512/2/2021Comments of the Public Advocates Office, Mussey Grade Road Alliance, and The Utility Reform Network on the Draft 2022 Wildfire M
 California Public Utilities Commission
1045412/2/2021PG&E's Comments on the OEIS’s Draft 2022 Wildfire Mitigation Plan
Pacific Gas and Electric Company’s Comments on the Office of Energy Infrastructure Safety’s Draft 2022 Wildfire Mitigation Plan Update Guidelines
 PG&E
1045312/2/2021SCE Comments on Draft 2022 WMP Guidelines
 Southern California Edison
1045212/2/20212022-WMPs SDGE Comments 2022 WMP Update Draft Guidelines 12 2 21
SDGE Comments on 2022 WMP Update Draft Guidelines
Electrical Infrastructure
5 page(s)
Director, Caroline Thomas JacobsSan Diego Gas & Electric Company
1045112/2/2021California Association of Small and Multi-Jurisdictional Utilities Comments on Draft 2022 WMP Guidelines
 California Association of Small and Multi-Jurisdictional Utilities
1044912/2/2021Notice- Adoption of 2022 WMP Guidelines Public Meeting
This document serves as notice of a public meeting for the adoption of the 2022 Wildfire Mitigation Plan Update Guidelines on Tuesday, December 14, 2021.
Electrical Infrastructure
2 page(s)
 Office of Energy Infrastructure Safety
1044411/9/2021Draft 2022 Wildfire Mitigation Plan Update Guidelines
Enclosed are attachments that comprise the Draft 2022 Wildfire Mitigation Plan (WMP) Update Guidelines. The Draft 2022 WMP Update Guidelines incorporate enhancements to support streamlined reporting and evaluation. The attachments are as follows: Attachment 1: Summary of Changes for the 2022 WMP Update Guidelines; Attachment 2: 2022 WMP Update Guidelines Template (Clean and Redline Versions); Attachment 3: Tables 1-12 Non-Spatial Metrics Data; Attachment 4: 2022 Maturity Model (Clean and Redline Versions); and Attachment 5: Guidelines for Submission and Review of 2022 WMP Updates.
 Office of Energy Infrastructure Safety